Download presentation
Presentation is loading. Please wait.
Published byHolly Stafford Modified over 9 years ago
1
SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission Mission update 2014 and outline of the Global Background Mission Laura Frulla CONAE CEOS SDCG-5 ESRIN, Frascati/Italy Feb 24-26, 2014 COMISION NACIONAL DE ACTIVIDADES ESPACIALES
2
2 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 Mission Overview constellationSAOCOM 1A SAOCOM 1B, polarimetric L-band SAR (1,275 GHz) A constellation of two identical satellites, SAOCOM 1A and SAOCOM 1B, carrying each one a polarimetric L-band SAR instrument (1,275 GHz) Sun synchronouscircular frozenpolar COSMO-SkyMed Sun synchronous, nearly circular frozen polar orbit (06:12 am LTAN/619.6 km) with identical orbital characteristics as COSMO-SkyMed repeat cycle of 16 days for each satellite (8 days for the constellation) (8 days for the constellation) 5 years Mission target lifetime: 5 years
3
3 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 Mission Update 2014 M-CDR Mission Critical Design Review (M-CDR) in Nov. 2013 Passed OK Flight Segment Qualification Review Step 1: April 2014 SAR Protoflight Model: March 2015 Flight Segment Qualification Review Step 2: May 2015 Ground Segment Qualification Review: Sept. 2015 Launch Readiness Review: Nov. 2015 Launch schedule: SAOCOM 1A: 2015 SAOCOM 1B: 2016
4
4 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 Satellite and Ground segments Satellite segment capacity specifications: Capacity to acquire and downlink >225 images per day per satellite, i.e. >450 for the constellation. Ground segment capacity specifications: Average daily number of catalogue consultations: in the order of 5000 The CONAE user Service shall be able to handle at least 500 image requests per day. Each request may induce one or more SAOCOM programming requests to be issued to the MOC. The CONAE user Service shall be able to process 200 SAOCOM products per day, inside the response time, up to level 1D products.
5
5 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Baseline mission Fixed acquisitions: For soil moisture –over the Pampas (main Argentinian region dedicated to agriculture and cattle – 83 Mha) Sensor calibration –Specific point targets in Argentina and Italy (Europe) –Homogeneous rain forest areas in the Amazon and Congo basins
6
6 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Foreground mission Variable acquisitions (world-wide) User requests through CONAE’s Spatial Information Cycles programme (from Argentina and abroad) ASI interest area, including exclusivity area ASI Exclusivity Area: Full utilisation rights of SAOCOM ASI Area of Interest: Rights to use SAOCOM for research, risk management, health applications and Governmental use.
7
7 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Background mission (referred to the Argentine interest) To foresee acquisitions of certain valuable data to generate a data base useful for future uses according to available resources Fixed acquisitions Argentinian institutional users National acquisition plan developed. Predetermined acquisition plans for (20) dedicated application areas defined by Argentinian institutions and user groups –Natural resources mapping, Emergency mitigation, volcanoes, maritime surveillance, etc.
8
8 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM –Background Mission (world wide) Global Background Mission (GBM) GBM currently under development for SAOCOM-1A and SAOCOM-1B CONAE thematic objective: Forest biomass Building consistent archives over global forests –First focus: Forests in the pan-tropical zone –Second focus: Siberian forests –Third: Others (TBD)
9
9 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Background Mission (world wide) Global Background Mission Annual dual season pan-tropical observations
10
10 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Background Mission (world wide) Global Background Mission Annual dual season pan-tropical observations
11
11 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Background Mission (world wide) Global Background Mission Second priority: Siberian boreal zone
12
12 CEOS SDCG-5 Frascati, Italy – Sep 24-26, 2014 SAOCOM – Background Mission (world wide) Global Background Mission Compliant with CEOS/SDCG recommendations –Repetitive annual observations over the pan-tropical zone –Dual season (wet and dry) –Fine spatial resolution (10m) –Dual polarisation (HH+HV) Max acquisition time for GBM 5 min/orbit to minimise impact on high priority observations Acquisition planning for SAOCOM-1B has started (Sept 2013)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.