Download presentation
Presentation is loading. Please wait.
Published byEmerald Watson Modified over 9 years ago
1
November 16, 2007 APPLEVIEW PROPOSAL Why It’s Not For Our Community 140 Units, 9 Story Condo 140 Units, 9 Story Condo, North Bergen
2
11 Williams/Transco Gas Pipeline Williams operates 3 natural gas transmission pipelines -Northwest, Transco and Gulf stream The Transco 36-inch, high pressure pipeline extends from South Texas to NYC Supplies approx. 50% of Manhattan’s gas New Jersey/ New York
3
22 1-mile radius of Transco Gas Pipeline/ Appleview New York City NJ Town of Guttenberg NJ Town of North Bergen Transco Gas Pipeline Hudson River
4
33 0.25 & 0.5 mile radius-Impact of Explosion Bull’s Ferry Versailles Galaxy Hudson Pointe II Hudson Pointe I Palisades Hospital Woodcliff Sewage Plant Half-moon Parker Imperial Summit Guttenberg Town Hall/ Toll Brothers’ site Manhattan Gas Supply Shut Down Watermark Roc Harbor W NY Sewage plant Bergen Ridge CO-ops and Businesses Melrose Blvd East Condo City View Stonehenge Hudson Ridge Jacob’s Ferry 0.5 mile radius 0.25 mile radius Mayfair Tower West Halifax Harbor Towers Bella Vista Bristol Court Windsor Shakespeare
5
44 The Oversized Project Footprint 8. 44 ft from Galaxy creates health issues: contaminated soil, carbon monoxide poisoning APPLEVIEW PROJECT 4. North wing 40 feet from open sewage tanks 10. View of Palisades over 90% blocked 3. NW corner encroaches on Transco’s pipeline 1. Palisades Structures at risk: 2 condo garages & major Town Road 2. Back of building abuts sewage pipeline 7. Traffic safety: dangerous 4-way intersection created with Hudson Pointe II 6. Traffic Gridlock: 4 new condos within 300 ft add >650 vehicles 5. Water run off and flooding on River Road 9. Fire hazard N
6
55 Proposed Project 5-20 feet from Transco Easement Transco pipeline’s 12-feet easement~ 5 ft from NW corner of Building 10-ft Sewer easement~ 0 ft from Building = = Easement 20 feet from North Wing of Building N Town Road 5 story garage Galaxy Condo Galaxy Condo
7
66 Structures Attached to the Palisades to be Excavated Drilling risks stability of Structures Excavation creates potential landslide on Transco gas pipelines Ferry Road overhanging the Palisades Summit House Garage
8
77 Gas Pipeline Safety Concerns Dangers During Construction (min. 28 months) Pipeline rupture due to Excavation accidents Heavy equipment driving above and around it over many months Landslides caused by the destabilized Palisades Dangers Post Construction No room to access pipes for maintenance, repairs or emergencies Parking garage adjacent to gas pipeline a security concern
9
88 Gas Pipeline Safety Concerns Devastating Outcome Any explosion will cause extensive damage to properties and lives due to the dense population Over 30 high-rise buildings within 0.5 mile radius of the project Over 2,000 apt units within 20-200 feet Thousands of people at risk Complicated rescue efforts due to densely populated high rise community Even a minor accident causing a temporary gas supply shut down will have serious economic repercussions for Manhattan
10
99 Hundreds of residents Share Our Concerns
11
10 The Media Hears Our Concerns
12
11 Can Local Government Help Us? N. Bergen authorities don’t seem to recognize dangers Board of Adjustments defers risk assessment and management responsibility to Transco Board defers pipeline safety law enforcement to Building Dept Building Dept does not understand pipeline safety law Would not hold Appleview accountable for illegal digging on April 20 Transco Head Office representative has not appeared at any of the 3 NB Board hearings
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.