WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte
2
WP Operative Plan WP 4 : Project planning and timetable
3
Task 4.1: Functional and system needs Start: June 2002 End: July 2002
4
Task 4.1: Functional and system needs Start: June 2002 End: July 2002
5
Task 4.2: Design and preparation of the survey Start: June 2002 End: July 2002
6
Task 4.2: Design and preparation of the survey Start: June 2002 End: July 2002
7
Task 4.3: Assessment Start: August 2002 End: December 2002
8
Task 4.4: Validation and reporting Start: January 2003 End: March 2003
9
Task 4.4: Validation and reporting Start: January 2003 End: March 2003