1
The Stakeholders 1 Tourism Domestic supply Environment River bed incision Hydropower Floods Irrigation Aquaculture Upstream activities Navigation INTERESTS
2
Hydropower 2 SON LA HOA BINH TUYEN QUANG THAC BA
3
Hydropower 3
4
4 The goal of the hydropower stakeholders is to maximize profit.
5
Only one company (EVN)? Many independent companies ? Which one? One or many companies? Hydropower
6
Max profit -> max production ? The most simple indicator might be Expected average energy production per year [Kwh/y] However we think that the value of the energy production changes from day to day, even if the selling (administrative) price of energy is not changing overtime. Therefore the production [Kwh/y] is not a suitable indicator.
7
Expected average energy production per year [Kwh/y] could be weighted differently for different period of the year, because energy has a different value in different period of the year: Max profit -> could be based on weighted sum of daily production ? P t RR : Energy production of Red River system in day t β t : weights to take into account the different value of energy in different period (t) of the year
8
8 If the import is not null in day t Cost for one Kwh imported saving got by substituting one thermal Kwh with one hydro-generated The value (opportunity price) of one Kwh If the import is null In 2011 Vietnam has imported the 4.6% of his total energy consumption
9
expenditure for the energy imported saving got by substituting thermal power with hydropower Annual average cost of lost hydro-power production Energy demand faced by Red River system in day t Energy production of Red River system in day t 9
10
Floods 10 TUYEN QUANG CITY HANOI PHA LAI
11
11 Hanoi Floods
12
12 Hanoi Floods
13
13 Pha Lai Floods
14
14 TUYEN QUANG CITY HANOI PHA LAI Floods
15
15 SON TAY HANOI PHA LAI Why not make reference to Son Tay?
16
16 Floods: Son Tay -> Hanoi 1961-2011
17
17 MIKE 11 simulation 1961-2011 Floods: Son Tay -> Hanoi
18
18 1961-2011 Floods: Son Tay -> Pha Lai
19
19 MIKE 11 simulation 1961-2011 Floods: Son Tay -> Pha Lai
20
Floods In conclusion: Minimize flood levels in Son Tay? Indicators: Frequency of alarm level overcoming (Hanoi- Pha Lai) Duration of overcoming -> risk of dike break …..
21
Irrigation 21 Nhue Da Do Thuy Nguyen Vinh Bao Tien Lang An Kim Hai Ngu Huyen Khe Bac Hung Hai Nam Thai Binh Bac Thai Binh Nam Nam Dinh 11 Irrigation districts in the Delta
22
22 The lowering of the water level in the river and canal network has caused problems for irrigation and MARD has defined mandatory release period during the dry season, in order to reach the target level in Hanoi (2.3 m at Long Bien station). Irrigation
23
23 Target level 2.3 m Irrigation Hanoi water levels and reservoirs release Hanoi level Hoa Binh Tuyen Quang Thac Ba 2011
24
Irrigation In conclusion: Satisfaction of 2,3 m at Hanoi. But when? Is it sufficient now, and in the future (bed incision)?
25
Other water uses 25 Aquaculture Urban and Industries Domestic water in rural area Water for livestock Water for environment (canals) 11 Irrigation districts in the Delta
26
26 Bac Hung Hai All the water uses in the Delta are accounted for in the estimated water demand, computed for each irrigation district on a ten days base Irrigation Aquaculture Urban and Industries Domestic water for rural area Water for livestock Water for environment Other water uses ????
27
27 All the water uses in the Delta are accounted for in the estimated water demand, computed for each irrigation district on a ten days base North Thai Binh Irrigation Aquaculture Urban and Industries Domestic water for rural area Water for livestock Water for environment Other water uses
28
28 All the water uses in the Delta are accounted for in the estimated water demand, computed for each irrigation district on a ten days base All the districts Irrigation Aquaculture Urban and Industries Domestic water for rural area Water for livestock Water for environment Other water uses
29
29 Irrigation Aquaculture Urban and Industries Domestic water for rural area Water for livestock Water for environment Other water uses: environment The critical issues for environment in the Red river system are related to pollution of water from domestic or industrial sources. The water scarcity of the last years has exacerbated the problem, decreasing the dilution effects, with an environmental crisis in the Nhue Irrigation District. The estimated water demand includes the water for environmental services in the Delta. Other water uses
30
Water deficit 30 Model of the Delta (MIKE 11) 11 Irrigation Districts 88 Sluice gates 293 (equivalent) pumps
31
31 Water deficit
32
Irrigation water uses In conclusion: Total deficit in the year Total deficit in particular periods Crop stress …. As above but separate for each district
33
River bed incision 33
34
34 River bed incision is a big issue for the management of the Red- Thai Binh river system. The IMRR project will analyze the effects of reservoirs regulation on this sector through the implementation of a geomorphological model, which could also define future scenarios of river bed incision. Sand mining River bed incision
35
35 Stability of bridges River bed incision
36
36 Water supply River bed incision
37
37 Navigation River bed incision
38
time evolution 10 – 20 years 2020 2000 Indicator: incision of the river bed in critical sections.
39
Upstream activities 39
40
40 Agricultural and forestry activities in the upper catchments may affect the water and sediment flow to the reservoirs. There are no specific data about this influence, and stationarity is expected. Upstream activities
41
Tourism 41 Tourism in Red River and its tributaries has shown its potential and promising room for development, but at present profits from this activity are not relevant and possible indicator should be postponed to further researches.
42
River environment 42
43
43 All the interest and uses have an effect on river ecosystem quality. Proposed indicators: 1.Water deficit from a given Minum Environmental Flow in a control section 2.Distance from a reference status (i.e. natural flows without reservoirs) 3.Indicators of Hydrologic Alteration IWARP proposal To be defined River environment
44
Navigation 44
45
45 Navigation water requirement can be summarized with a range of levels at the Long Bien station in Hanoi, presently defined as 1.1 meter, as a minimum, and 11.5, as a maximum. A world bank project and other action have planned to modify some streches of the river in order to improve navigation conditions: the project will be consider if and when these activities will influence the sector requirements. Navigation
46
46 Navigation
47
47 Navigation
48
Stakeholders and Sectors 48 Tourism Domestic and industrial supply River Environment River bed incision Hydropower Floods Irrigation Aquaculture Upstream activities Navigation INTERESTSSECTORS R. Environment River bed incision Hydropower Floods Navigation Water supply Winter crop Canal Environment Will not be considered