Download presentation
Presentation is loading. Please wait.
Published byAntonio Love Modified over 10 years ago
1
1_Panel Production
2
380 pannelli 45 giorni di produzione = 8.4 pannelli/day
3
1_Panel Production
4
2_FE Boards Production Riassunto FE boards al 1-11-02
5
2_FE Boards Production
8
SPEDIZIONI STRIP ATLAS DATA DI SPEDIZIONE BOL - B ( phi ) BOL - B ( eta ) BOS - B ( phi ) BOS - B ( eta ) BML - D ( phi ) BML - D ( eta ) 22 - 01 - 02 12 - 02 - 02 26 - 03 - 02 36 23 - 04 - 02 36 28 23 - 04 - 02 30 - 04 - 02 03 - 05 - 02 08 - 05 - 02 44 18 - 05 - 02 27 - 05 - 02 04 - 06 - 02 27 - 06 - 02 19 - 06 - 02 23 - 07 - 02 40 G 40 G+4 30 - 07 - 02 05 - 08 - 02 40 G 05 - 09 - 02 40 G 25 - 09 - 02 54 G 02 - 10 - 02 10 - 10 - 02 40 G 23 - 10 - 02 06 - 11 - 02 56 G
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.