Download presentation
Presentation is loading. Please wait.
Published byDonald Kelley Modified over 9 years ago
1
Utah Collaborative Active Transportation Study
2
Regional Collaboration
3
Overview: Goals Lay groundwork for urban network of bicycle facilities ▪ All abilities, all ages Enhance active transportation connections to transit Demonstrate quality of life benefits ▪ Economic, health, environment
4
UCATS Schedule August 2012 Goals PI Strategy October 2012 No Boundaries Demographics Bike-onomics January 2013 Latent Demand Selection Criteria Pedestrian Barriers April 2013 Proposed Projects Top 25 June 2013 Economics Health August 2013 Cost estimates Implementation
5
Analysis No Boundaries map Station area walkability Demographics and Barriers: UHTS Bike-onomics Pedestrian and bicycle demand Health impacts
6
UCATS Projects - Ranking Matrix Project 1Project 2Project 3Project 4Project 5 UCATS Goals: Create an urban bike network for users of all ages/abilities; enhance active transportation to transit; demonstrate quality-of-life benefits. Tier 1 Criteria Does it support an urban bike network? Does it enhance access to transit? Tier 2 Criteria Does it score well in the latent demand model? Does it reflect local planning priorities? Can it demonstrate an economic benefit? Does it overcome a barrier?
7
Top 25 Regional Connectivity projects (MAG) Historic Utah Southern Rail corridor Trail feasibility study Evaluate right-of-way, constraints, opportunities, crossing treatments, funding, and other elements
8
Top 25 Regional Connectivity projects (MAG) State Street Bike lanes: Pleasant Grove, Lindon, Orem Pleasant Grove Blvd to 800 North UDOT/municipal coordination On-street parking evaluation
9
Top 25 Regional Connectivity projects (MAG) 900 East Bike lanes University Parkway to 900 South Connects to proposed 600 South bike lanes Connects to existing State Street facilities at 900 South
10
Top 25 Regional Connectivity projects (MAG) 500 West Bike lanes and bike boulevards Bulldog Boulevard to 1560 South Consistency with Provo bike master plan
11
Top 25 Regional Connectivity projects (MAG) US-89 Buffered bike lanes 1860 South to Center Street (Provo to Springville)
12
Top 25 Access to Transit projects (MAG) American Fork FrontRunner 200 South bike lanes Connect to existing trail on Spring Creek Ranch Road Wayfinding from downtown to rail station
13
Top 25 Access to Transit projects (MAG) Orem FrontRunner Pedestrian/bicycle bridge Connect station to UVU Alternatives currently under study
14
Top 25 Access to Transit projects (MAG) Provo Intermodal Hub 600 South bike lanes Intersection improvements: crosswalks, curb ramps, ADA enhancements Freedom Boulevard bike lanes
15
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.