Download presentation
Presentation is loading. Please wait.
Published byMarshall Anthony Modified over 9 years ago
1
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February 2008
2
1 Answers to general inquiries 1- RSP-100 Applications forms The CB certificate is not a replacement for the application forms. We always asked that CB's include signed application forms. IC will accept custom forms from CB's, as long as they include all the required information in the appendixes and a signature. 2- GPS re-radiators Although GPS re-radiator could potentially meet the requirements of RSS-131, Industry Canada will not allow the certification of such devices. Industry Canada has adopted the same position as the FCC.
3
2 3- CB audit notification CBs should use our E-filing application online to notify us of conducted audits. On the E-Filing page where you type your CB code and password, you have to select "Audit" instead of "Notification". You can file multiple audits in the same E-filing session. CBs should only notify us by email when an audit fails (in addition to sending us the information through the E-Filing audit tool).
4
3 4- Document confidentiality The Bureau’s suggestion is that applicants and CBs should follow the same procedure as when applying with the FCC. Industry Canada, unlike the FCC, doesn't publish any documents submitted by applicants. However, it is prudent to mark the appropriate documents as confidential since we do have an Access To Information and Privacy (ATIP) policy which could be used to access documents.
5
4 5- Advance wireless Service (AWS) certification AWS equipment cannot be certified in Canada since the standard has not been published yet. The standard will be RSS-139 and the Standard Radio System Plan will be SRSP-513. You will find some information on the following page (see section 2.1.2): http://strategis.ic.gc.ca/epic/site/smt- gst.nsf/en/sf08858e.html#sect21 When RSS-139 will be published, you will find it on this page: http://strategis.ic.gc.ca/epic/site/smt-gst.nsf/en/h_sf06129e.html When SRSP-513 will be published, you will find it on this page: http://strategis.ic.gc.ca/epic/site/smt-gst.nsf/en/h_sf06130e.html For those interested, you can find below a link with all the information about the AWS spectrum auction: http://strategis.ic.gc.ca/epic/site/smt-gst.nsf/en/h_sf08089e.html
6
5 6- Certification standard issue IC policy: - A multiple listing should have the same issue version as the original certification. - An existing family certification (when no testing is necessary) should be the same issue as the original certification. - An existing family certification ( when testing is necessary) should be the current issue of the standard (which means that the issue version may be different from the original certification if the issue version has changed since then). - A reassessment should be the current issue of the standard since the re-testing should be done to the current standard.
7
6 7- Use of “Technical Acceptance Certificate” by CBs Given the interpretation by IC’s legal counsel of the Radiocommunication Regulations, the usage of the name or term 'Technical Acceptance Certificate’ remains optional by all the CBs. This means that should the CB wish to use the term 'TAC‘ or some other terms, it would be a decision left up to the CB. 8- Licensed modular approval Until Industry Canada has included specific rules for licensed modules in the standard, we will accept applications for certification of licensed modules, provided that the modules comply with the existing FCC rules for licensed modules. Therefore host product manufacturers will be able to integrate a certified licensed module in their final product without having to recertify the final product, provided that the modular approval conditions are met.
8
7 9- Transfer of Certification A CB can process a transfer of certification. If the company taking over is planning to sell many products that were previously certified by the old company, an e-filing application must be submitted for each family of product (one E-filing session for each certification number with one or more model numbers). It is not necessary for the new company to certify equipment that they don't plan to sell under their name. They should only apply for the equipment they plan to sell under their name. 10- SAR evaluation SAR evaluation applies to equipment used near humans and animals unless it is exempted by section 2.5 in RSS- 102.
9
8 11- Terminal Registration processed by CBs Even if a CB does not have Terminal equipment in their scope, the client can still send their Declaration of Conformity and the CB can submit it with the radio portion while doing the E-filing application. It is mandatory that we receive Radio and Terminal information in the same application for a device. To do this, the client or CB shall choose the option "Both (cordless telephone)" in the E-filing application. 12- Multiple Manufacturers Our system is not designed to record more than one manufacturer. This is not a big issue since the manufacturer information is not considered "critical" information. Please enter just one of the manufacturer in the system and this will be acceptable.
10
9 Future Updates to the E-Filing system Standard issue field As a reference to item 6, we will add an issue field in the emission page to allow clients and CBs to choose other issues than the current one with a validation message. Session summary page Although there is a summary page at the end of an E-Filing session, we want to revise it and make it more complete for evaluation engineers.
11
10 PDF filenames replaced by numbers When clients upload PDF files, the filename is correct but if the client leaves the session (or the session crashes) and then come back, the names are replaced by numbers. This will be corrected. Uploaded PDF files accessibility In an effort to help evaluation engineers, we plan to update the system to allow users to open PDF files in the e-filing system after they are uploaded (before the session is completed).
12
11 Document confidentiality As mentioned in item 4, we do not publish any documents but it is prudent to specify which documents should be confidential and to facilitate this, we plan to add a confidential checkmark for the list of PDF documents attached by the client or CB. Uploading multiple PDF files To facilitate the uploading process, we plan to make it possible to select multiple files at once and upload them all in one operation.
13
12 PDF file size As suggested previously, we will ask for a modification of the system to allow clients and CBs to upload files with sizes of up to 4MBytes.
14
13 QUESTIONS?
15
14
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.