1 In-Line Cell Manager Configuration and Loading Date: Octobre2014

2 2 Cell Manager Configuration Module CoreView In Line Software consists of two main Modules Measurement Unit (CoreView Teach for In-Line) Cell Manager On each computer which is connected to the WLS400A system, the Measurement Unit is installed The Cell manager is installed on one of the units computer. In-Line configuration of both Units and the Cell Manager is done through a configuration module: C:\Cognitens\bin64\Inline.Configuration.UI.exe which is executed in the Cell Manager Unit.

3 3 Configuration Interface Computer Name Cell Name Has to be the same in all Cell Units Unit Name Press for Cell Manager Configuration Important: Don’t forget to press Apply after you finish with all the configuration.

4 4 Cell Manager Configuration Path to result file generated in XML format. (For Back compatibility)

5 5 Cell Manager Configuration GateWay Computer IP Address

6 6 Cell Manager Configuration Currently only Diagnostic report is supported

7 7 Cell Manager Configuration No Change Required

8 8 Configuration Interface Press to configure Units Important: Don’t forget to press Apply after you finish with all the configuration.

9 9 Unit Configuration Full Path to local CTP. Including computer name Multiple CTP supported

10 10 Unit Configuration DataServer Computer name. IP address is also supported

11 11 Unit Configuration No Change Required

12 12 Unit Configuration Full path to Bundle Folder. Has to be the same on both units

13 13 Load In-Line Measurement System To Load the In-Line Measurement System run: C:\Cognitens\bin64\Inline.Cell.UI.exe The In-Line Cell UI enables: Loading\Unloading all the Measurement In-Line process Review the existing bundles and set the Delete option for the output data (this includes all the images and point cloud) Once the Loading off all the processes is done the system is ready to execute In-Line measurement process

14 14 Load In-Line Measurement System – Bundle Configuration Red Bundles are marked Not to delete automatically This will delete the outputs on both computers after the results are generated Use this to delete existing outputs which were not deleted automatically

15 15 Load In-Line Measurement System Press to start the process

16 16 Load In-Line Measurement System Press to Stop the process All Process have to be Green and Ready And Cell Manager Connected to GateWay


Download ppt "In-Line Cell Manager Configuration and Loading Date: Octobre2014."