Presentation is loading. Please wait.

Presentation is loading. Please wait.

Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS.

Similar presentations


Presentation on theme: "Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS."— Presentation transcript:

1 Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS Complex NP –RHIC Complex

2 Accelerator R&D at BNL - HEP Program Accelerator Test Facility(Vitaly & Bob will describe in more detail) Hands-on User facility Experimental Program via proposals & program committee High brightness electrons (75 Mev) + High powered synchronized laser 4 beam-lines with ~ 10 experiments at any given time Facility Support via HEP & BES (20%) (~$2.5M) Moved from the Light Source to the Physics Department (3 years ago) ~ 8 FTE’s Issues Flat-flat funding over past several years Enhanced safety requirements increase demands on in-house staff

3 Accelerator R&D at BNL - HEP Program Muon Collider/Neutrino Factory R&D Strong BNL presence since the inception of these studies. Bob’s group have been “high profile” in both the Neutrino Factory and Muon Collider design studies, and continue to play such a role BNL takes the lead in the targeting studies FFAG based designs Home of the ICOOL simulation code ~ 6 FTE’s Issues After several years of benign neglect of the muon collaboration, the recent activity in neutrino super-beams has injected some interest into high power targets/horns Progress in other areas is slow

4 Accelerator R&D at BNL - HEP Program Superconducting Magnet Division LHC -> LARP (NbSn magnet development) ~$2M in FY06 ILC final focus R&D ~$600K in FY06 (mini-magnets, vibration, IP design) SC materials development - NbSn, MgB2, BSSCO, YBCO ~$700K ~ 14 FTE’s Issues: Cable test facility closed this year (lack of operating funds)

5 300 MeV S-Band Linac Titanium Sapphire Laser BNL Photoinjector IV Chicane Compressor 10 m NISUS Wiggler Accelerator R&D at BNL - BES Program NSLS Source Development Lab: A Platform for FEL R&D (ONR funds)

6 Cutting Edge Experiments @ SDL SASE @ 400 nm 0.23 nm FWHM SASE x10 5 Wavelength (nm) HGHG HGHG FEL @ 266 nm Beam Dynamics XUV Photochemistry Electric Field (kV/cm) -80 -60 -40 -20 0 20 40 60 80 High Intensity THz High Brightness Beams Accelerator R&D at BNL - BES Program

7 VUV Ring Coherent Emission Studies n Bursts of Coherent IR n Interferometer studies P coherent /P incoherent > 10 4 (at ~40 GHz) n Microbunching ? n Streak camera studies Frequency agrees with Z || (  ) n Microbunching due to microwave instability B.Podobedov, G.L.Carr, S.L.Kramer and J.B. Murphy Accelerator R&D at BNL - BES Program

8 Accelerator R&D at BNL - NP Program The RHIC complex is a major accelerator facility. In a few years it will be the only US high energy hadron collider and together with the LHC one of two in the world. The polarized proton program is unique. The R&D is mostly what this Committee would call short/medium term: largely determined by the operation of the RHIC complex (with a surprising degree of synergy with the LHC) Numerous beam dynamics issues are under study. –PLL tune & coupling feedback (real time coupling signal) –Beam-Beam (present proton limit) Long range beam-beam compensation (with wires) Head on beam-beam compensation (with an electron lens) –E-cloud studies (present heavy ion limit) –Non linear IR corrections –Polarized beam dynamics (low energy spin flip, cold & warm partial snakes in the AGS, full snakes in RHIC, polarized source, polarimeters, polarized beam simulations) –HI collimation and beam loss studies

9 Accelerator R&D at BNL - NP Program Short luminosity lifetime (few hours) for heavy ion collisions due to IBS cries out for beam cooling. IBS goes as ~ (Z/2) 2 so Au ions ~ 3 orders of magnitude worse than protons. For polarized protons cooling both enhances polarization lifetime and luminosity. Cooling R&D: –Microwave stochastic cooling (HI up to 100 GeV) –High Energy (50 Mev) e-cooling ( HI up to 100 GeV, Proton inj) –Optical stochastic cooling (protons 100 GeV and above). Possible test at Bates with MIT.

10 Accelerator R&D at BNL - NP Program The e-cooling R&D program in itself is major activity: SCRF Gun development (with ONR & AES) – 703 MHz CW, I av = 0.5A, Q bunch 1.4 nc, E kin 2 Mev, Emit 4 mm- mrad rms –First tests June 2007 ? Energy Recirculating Linac R&D –Prototype ring under construction –703 MHz SC cavities from AES

11 Accelerator R&D at BNL - Summary HEP supports specialized R&D activities at BNL which take advantage of the talents of the staff and facilities developed during the long HEP tenure as landlord. HEP accelerator R&D has been on a slow decline during the past decade. Although BES and NP do not obviously engage in R&D with the goal of developing the next generation of high energy facilities they do support accelerator R&D at BNL which does share a non-negligible synergy with HEP. It certainly helps support the gene pool and maintain the intellectual vitality.


Download ppt "Accelerator R&D at Brookhaven National Lab HEP –Accelerator Test Facility –Muon Collider/Neutrino Factory R&D –Superconducting Magnet Division BES –NSLS."

Similar presentations


Ads by Google