Download presentation
Presentation is loading. Please wait.
Published byLionel Mitchell Modified over 9 years ago
1
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013
2
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 2
3
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 3 Real Time 1 : Developed Real Time Systems; Opened web site of Real Time Traveler Information Services, 15 CCTVs installation, and Data integration with Traffic Police Division. 2005- 2007 2007- 2008 2008- 2009 2009- 2010 2010- 2012 Real Time 2 : Improvement of Real Time Traveler Information Services on web site, and 14 CCTVs installation. ITS 1 : Data integration with EXAT and BMA and 11 CCTVs installation. ITS 2 : Data integration with DOH, BMTA, and Don Muang Toll Way, 1 st Phase of Microwave Radar installation, 11 CCTVs installation, and Improvement of Real Time Traveler Information Services on web site and mobile phone. ITIS : Data integration with Pattaya city and Marine Department, 2 nd Phase of Microwave Radar installation, and Opened Twitter web site. ITSMP : Data integration with Nontaburi and Chaingmai Provinces, Opened Smartphone Apps and Facebook web site, and Developed 2556-2560 ITS Master Plan.
4
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 4 “ To enhance infrastructure's efficiency and safety, and to improve services of public transportation and logistics operation using ITS”
5
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 5 Safe Equitabl e Affordab le Accessib le Enhance country’s competitiveness Achieve the goal of being an economic hub Conserve Energy Reduce energy consumption Reduce pollutions Reduce GHG Three aspects of expected impacts from the proposed ITS deployment strategy
6
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 6
7
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 7 1 st Strategy : Traffic control and management 2 nd Strategy : Improving public transport services 3 rd Strategy : Traffic safety and incident management 4 th Strategy : Commercial vehicle operations 5 th Strategy : Electronic payment 6 th Strategy : Traveler information
8
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 8
9
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 9
10
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 10
11
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 11
12
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 12
13
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 13
14
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 14 This ITS Master Plan suggests that the appropriate budget for the proposed ITS development of Thailand from 2012 – 2017 is 7,500 – 8,000 Million Baht.
15
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 15
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.