Presentation is loading. Please wait.

Presentation is loading. Please wait.

Data management Key Issues in Data Entry and Management Cleaning Data, Who Should do What, When? Juan Muñoz.

Similar presentations


Presentation on theme: "Data management Key Issues in Data Entry and Management Cleaning Data, Who Should do What, When? Juan Muñoz."— Presentation transcript:

1 Data management Key Issues in Data Entry and Management Cleaning Data, Who Should do What, When? Juan Muñoz

2 Levels of quality control Range checking Simple consistency checks Inter-record checks

3 Range checking Age should be a number less than 100 Gender should be coded either “1” for male or “2” for female No numbers in the name field etc

4 Simple consistency checks Age and birth date should be consistent with the date of the interview Head of the household should be 18 years or older A doctor should have completed university studies etc.

5 Inter-record checks Sub-totals Food consumption Checks with reference tables (anthropometrics) Cash balance Item-specific unit prices etc.

6 Levels of quality control Ranges Simple Inter-record consistency Easier to conceive and program Harder to conceive and program

7 Levels of quality control Ranges Simple Inter-record consistency Error likely to be due to miscoding or data entry Errors likely to be due to interviewing

8 Why concurrent data entry? Quality control Turnaround time General improvement of field procedures Eliminates encoding as a separate task

9 Data entry is an integral part of the LSMS, not an afterthought

10 What is needed to develop an LSMS data entry program? Integrated skills / tasks Development time Data entry software

11 Integrated skills Questionnaire and data entry program evolve synergistically (example: subtotals) Data manager needs to be a part of the core team from the beginning Integration will become even more important in future surveys

12 Tasks Data entry program development - screen design - range checks - consistency checks - reference data Data entry manual Training Supervision during field work Compilation and documentation

13 Development time First version to be completed before the field test Working version needs to be ready for training Debugging needed during first weeks of data collection

14 Data entry software In-house package Six packages evaluated in 1994, IMPS and ISSA found adequate

15 Data entry software In-house package Six packages evaluated in 1994, IMPS and ISSA found adequate Has evolved synergistically with acquired experience and available technology IMPS and ISSA now superseded by CSPro


Download ppt "Data management Key Issues in Data Entry and Management Cleaning Data, Who Should do What, When? Juan Muñoz."

Similar presentations


Ads by Google