Mobile Application for SAT Preparation Preliminary Project Plan By Project Team: Hi5 Anant Kambli Amit Shukla Ajaykumar Aswathappa Prabin Gautam Rama K.

Similar presentations


Presentation on theme: "Mobile Application for SAT Preparation Preliminary Project Plan By Project Team: Hi5 Anant Kambli Amit Shukla Ajaykumar Aswathappa Prabin Gautam Rama K."— Presentation transcript:

1 Mobile Application for SAT Preparation Preliminary Project Plan By Project Team: Hi5 Anant Kambli Amit Shukla Ajaykumar Aswathappa Prabin Gautam Rama K Asuri Team URL: http://www.utdallas.edu/~axa134730 Class: EMS in Software Engineering Course: CS/SE 6361, Fall 2013 PowerPoint Developed by Anant Kambli based on current version of Preliminary Project Plan

2 Mobile Application for SAT Preparation Preliminary Project Plan Introduction Definitions, Acronyms and Abbreviations Project Organization Managerial Process Technical Process Work elements, Schedule and Budget

3 Mobile Application for SAT Preparation Preliminary Project Plan Introduction Project Overview Project Deliverables Evolution of this document References Definitions, Acronyms and Abbreviations

4 Mobile Application for SAT Preparation Preliminary Project Plan Project Overview The SAT preparation mobile application is an android-based application being developed to help students prepare better for the SAT exam. Our focus is to develop one of the best application for SAT preparation for students.

5 Mobile Application for SAT Preparation Preliminary Project Plan Project Overview This app covers following three major sections Mathematics Critical reading Writing Major features learning materials practice tests Course materials and tests are categorized and customized by the school grades the students/users are enrolled in.

6 Mobile Application for SAT Preparation Preliminary Project Plan Project Deliverables Sr#Deliverable DescriptionDeliverableMilestoneProject Lead 1Preliminary Project PlanY (Deliverable #1)09/27/2013Anant Kambli 2Requirements collectionN09/28/2013 3Requirements Analysis Document Y (Deliverable #2)09/30/2013 4UML DiagramsY (Deliverable #3)10/02/2013 5Architecture DesignY (Deliverable #4)10/06/2013 6Component DesignY (Deliverable #5)10/10/2013 7CodingY (Deliverable #6)11/25/2013 8TestingY (Deliverable #7)12/01/2013 9Final DocumentationY (Deliverable #8)12/04/2013

7 Mobile Application for SAT Preparation Preliminary Project Plan Evolution of this document and References The document will be continuously updated as we progress along the deliverables. References http://sat.collegeboard.org http://www.uml.org/

8 Mobile Application for SAT Preparation Preliminary Project Plan Definitions, acronyms, and abbreviations ADT: Android Development Tool IBM: International Business Machines Corporation IDE: Integrated Development Environment SAT: Scholastic Aptitude Test SDK: Software Development Kit UML: Unified Modeling Language

9 Mobile Application for SAT Preparation Preliminary Project Plan Project Organization Process Model Our design process will be based on the creation of UML diagrams for the project. We will be using Iterative development model for our project development. The system will be implemented in Java. The reason for this is Android app requires Java programming. All project documents will be posted on our all team member’s website.

10 Mobile Application for SAT Preparation Preliminary Project Plan Project Organization Organizational Structure The members involved in this project are Sr#NameIDemail 1Ajaykumar Aswathappaaxa134730axa134730@utdallas.edu 2Amit Shuklaaks13143aks13143@utdallas.edu 3Anant Kambliank130430ank130430@utdallas.edu 4Prabin Gautamprg130130prg130130@utdallas.edu 5Rama K Asurirka130030rka130030@utdallas.edu Team Leader (Phase I): Anant Kambli will be the Team Leader during phase-I of the project. We will be rotating team leader role to Every team member in next phase so every team member will get opportunity to play team leader role.

11 Mobile Application for SAT Preparation Preliminary Project Plan Project Organization Organizational boundaries and interfaces Team Communication Project team will meet at least once a week. In between the meetings, the team will meet virtually using Join.me, Skype and conference calls as needed. Meeting logs will be maintained for all meetings conducted.

12 Mobile Application for SAT Preparation Preliminary Project Plan Managerial Process Management Objectives and priorities The primary focus of our team is to develop user friendly mobile application for SAT preparation. Our team will try best to make our final product perform as per the requirements. User satisfaction is our top priority. Assumptions, dependencies, and constraints There is a time constraint applied to each deliverable. Listed due date of each deliverable in the document.

13 Mobile Application for SAT Preparation Preliminary Project Plan Managerial Process Risk management Risk will be managed by the team for each deliverable. At the beginning of a particular deliverable the group will try to identify and mitigate risk conditions that might arise during that phase. The team will monitor this process and be responsible for seeing following all risks that are mitigated, if possible, or otherwise handled. Monitoring and controlling mechanism Email and frequent group meetings are used to monitor and control the group as it strives to achieve a deliverable.

14 Mobile Application for SAT Preparation Preliminary Project Plan Technical Process Methods, tools and techniques Software documentation

15 Mobile Application for SAT Preparation Preliminary Project Plan Methods, tools and techniques Methods Team Meetings Metrics Configuration management Tools and techniques Eclipse Integrated Development Environment (IDE) Android Development Tool (ADT) Bundle which includes: Android Software Development Kit (SDK) Android Platform tools Android Emulator: Simulation tool for Android application IBM Rational Rhapsody, visual modeling environment based on UML (Unified Modeling Language)

16 Mobile Application for SAT Preparation Preliminary Project Plan Software documentation The following software documents will be developed Preliminary Project Plan Requirements Specification Analysis Architecture Specification Code Test Plan Test Cases Test Report End User Manual

17 Mobile Application for SAT Preparation Preliminary Project Plan Work elements, schedule and budget Still under Development

18 Mobile Application for SAT Preparation Preliminary Project Plan Thank you all !!