Download presentation
Presentation is loading. Please wait.
Published byClemence Ferguson Modified over 9 years ago
1
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau
2
2 Why should a tribe care about SIPs? Why tribal input is important Types of SIP actions Review public notification process Participating in the SIP process Important SIP elements Topics
3
3 Testimony Future opportunities for SIP participation Other opportunities for tribal participation NM tribal notification Tribal participation example Summary/Conclusion Contact information Topics (cont.)
4
4 Air pollution is regional, transported to Indian communities To better protect health of citizens To not be disadvantaged by area planning efforts To remain competitive and enhance opportunities for economic growth Why Should a Tribe Care About SIPs?
5
5 SIPs outline… how sources will be regulated how states plan to address local non-attainment problems how future SIPs will address regional and transported pollution Why Should a Tribe Care About SIPs? (cont.)
6
6 Can incorporate major policy judgments of state agency Limited opportunity to participate once state-level process complete Helps agency make balanced decisions Ensures tribe’s voice is heard in decision making Why Tribal Input is Important
7
7 Initial SIPs – new plans Attainment redesignation Approve new state rules Amend emission limit at a particular source Amend monitoring requirement at SIP source Process is the same – difference is complexity of plan development and supporting documents Types of SIP Actions
8
8 New rule, plan, or amendment to existing part of SIP Major newspaper statewide or regional notice for affected area (NM 60 day comment period) Published in NM Register Posted on website Anticipate a lot of comments outreach prior to 60 day comment period During 60 day comment period open house or public meeting Public Notification Process
9
9 Develop relationship with state or local air authority (SIP writer or manager) Attend hearing, see how system works for state or local authority Document your contacts and how hearing process works for others to view and learn (SIP protocol checklist) Participating in the SIP Process
10
10 Get involved early Participate at development stage (i.e., workgroup) for the experience and for best impact Better understanding of the issue will improve quality of your comments Possess knowledge that state may not have leads to better outcome Participating in the Process (cont.)
11
11 Know your subject matter Each a little different depending on project Example regulation development, nonattainment area, etc. Comments should be relevant to subject Important SIP Elements
12
12 Hearing with Environmental Improvement Board (EIB) Public may Provide oral comments at hearing (general) Cross-examine witnesses ask questions If tribe comments on technical info they must submit as a notice of intent (see next slide) Written non-technical statement may be submitted Record of hearing is made; transcript copy available at requester’s cost Public Testimony
13
13 Technical testimony – scientific, engineering, economic, other specialized testimony Notice of intent to present technical testimony 20 days before hearing Will include qualifications of witness education and work background Other Testimony
14
14 Very difficult to make a change at a hearing Request to meet with state air program Participate in workgroup Attend public meetings Engage Early in the Process
15
15 New federal ozone standard may affect areas of the West currently in attainment Includes many rural areas influenced by power plant and oil and gas emissions transport from major metropolitan areas Look out for lower NAAQS Future Opportunities for SIP Participation
16
16 General Permit development General Permit revisions Permit review All written comments added to permit application record and considered in permit review process Work groups Hearings Other Opportunities for Tribal Participation
17
17 NM has incorporated into it’s rules notification Construction Permits (within 10 miles) Operating Permits (within 50 miles) Prevention of Significant Deterioration (PSD) Nonattainment Areas Contact air program and get on a mailing list NM Tribal Notification is Required for Permits
18
18 New Mexico Air Quality Bureau proposes General Construction Permits (GCP) Volunteered to be a member Attended several meetings Exposed to several new terms Gained valuable experience on how state develops general permit Tribal Participation Example (non- SIP)
19
19 Attended administrative hearing (non EIB) Concerned about language in permit application Testified at hearing my concerns Hearing officer did not object, so change was made Tribal Participation Example (non- SIP)
20
20 Amended Permit Language 3
21
21 Amended Language (cont.)
22
22 Amended Language (cont.)
23
23 Air issues becoming increasingly complex – ozone, PM2.5 formed by precursor emissions that travel significant distances Increasing need for national coordination, interstate and tribal cooperation (Regional Haze Rule 40 CFR Part 51.308 and 51.309) Need for more tribal comments Summary/Conclusion
24
24 Rosanne Sanchez Environmental Analyst Air Quality Bureau New Mexico Environment Department 5500 San Antonio Dr. NE Albuquerque, NM 87109 (505) 222-9583 rosanne.sanchez@state.nm.us http://www.nmenv.state.nm.us/aqb Contact Information
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.