1
TRAM Power Ltd and USP’s of its products web : Presentation to Baker Tilley 18th Dec. 2007 Manchester
2
TRAM Power Ltd.USP’s City Class tram Passenger friendly and flexible
Low power consumption Low maintenance costs Low cost of ownership LR55 track Strong and durable Low installation costs Flexible and wide rail use Minimum disruption OHL power High performance Low cost Light weight and aesthetic Turnkey Opens commercial projects More schemes and so more sales Faster start to opening, no need for grants ?
3
Competitors Tramcars Track OHL Whole systems
Alstom, Bombardier, Siemens, Skoda Track Balfour Beatty, Grant Rail OHL Balfour Beatty, Brecknell Willis Whole systems No commercial for 100years
4
The Team Lewis Lesley, (Technical) Director
Lincoln Shields, Business Development Mike Kilroy, Production Manager David Bostock, Finance
5
UK (public) transport market
Buses about 7% of passenger km Trains about 7% of passenger km Motor cars about 80% of Pass. km Urban transport market Buses about 15% of passenger km Trains about 5% of passenger km Motor Cars about 70% of pass. km Walking and cycling about 5% 75% of car trips under 8km.
6
Role of urban tramways Proven to attract motor car users
Manchester 25% of patronage Sheffield 20% of patronage Better energy efficiency Lower or nil (carbon) emissions Reduce dependency on oil BUT low priority of Government
7
Reducing tramway costs
TRAM Power Ltd. aims To lower capital costs To lower operating costs To make some tramways commercial Private funds could build new systems without subsidies Busy bus routes more economical as tramways
8
TRAM Power Products City Class tramcar (Patented)
LR55 Street track (Patented) Overhead power supply (Patent pending) The package = affordable tramways
9
City Class tram 200 passenger prototype on test in Birkenhead
10
City Class v Metrolink City Class COTS 200 pass 22tonnes State of Art
controls 1kWh/km c£1m new Metrolink Bespoke 200 pass 46tonnes 20years old controls 4kWh/km £2.25m + new COTS = Components Off The Shelf
11
Design Principles: Less cost without mass production
Proven design concept The City Class tram from TRAM Power Ltd. Has world wide application. Innovative design Less costs COTS = “components off the shelf”.
12
Mock up 4 tonne Low/High floor - 25% length full size
Exhibited and market research in Birmingham, Blackpool, Chatham, Dublin, Edinburgh, Gloucester, Liverpool, London & Sheffield
13
Slave Tram Redundant 1930’s tram for scrapping
One original bogie and drive removed TRAM Power bogie 90kW 3phase industrial motor and Inverter drive fitted Tested on Blackpool Tramway
14
Prototype Tram 29m long single articulation
bogie, motor and inverter from Slave tram with second identical set added tested with HMRI approval
15
The City Class Family 15 m horizontal track radius
200 m vertical curve capable Magnetic track brakes for emergency braking Multiple Unit compatible passenger capacity
16
Preliminary Energy Results
Blackpool old tram = kWh/km Manchester Metrolink = kWh/km Sheffield Supertram = kWh/km TRAM Power City Class = 1.0kWh/km Why ? Lower weight High efficiency drive
17
Tram sales, progress: Approach from Iran (60) Commercial schemes
Trafford Centre (12) Middlesbrough (19) Liverpool (20) Invitations to bid Toronto (200) Melbourne (100) Amman (turnkey project) Discussions with Blackpool (16) Galway (15)
18
LR55 & why old tracks have high costs ?
Manchester relocation of utilities massive track slab expensive reconstruction long possession traffic disruption business inconvenience replacement of failed tracks Sheffield
19
LR55 Components *The LR55 Rail *rail grade steel *weldable
*delivered in 18m lengths *12m radius curve *S & C to match *transitions etc.
20
LR55 Installation Rail bonded into Trough with PU grout Pre cast
Concrete trough
21
LR55 & Network Rail Tunnel enlargement
Extra headroom Without Rebuilding tunnel
22
LR55 delivers: Robust (up to 80 tonne axles)
Durable (since 1996 in Sheffield) Small footprint (400mm wide/rail) Shallow (200mm depth) Utilities undisturbed & accessible Rapid installation (500m/week) About 50% of cost of other systems
23
LR55 Sales: Discussions opened with Network Rail
Product Approval Loading Gauge enhancement All Commercial schemes Trafford Centre Middlesbrough Liverpool Need to get Steel Mill to Roll
24
New Overhead Power Supply at Carnforth
25
New and Old : installation
26
OHL PROTOTYPE RESULTS OHL installed Nov 2004, simplified
OHL costs reduced (£50k v £160k) Elastic supported single wire good for speeds up to 150km/hr Low electric resistivity Jan.2005 severe storms – no damage branch lines to be electrified reduce cost of new (light) rail & tram projects ?
27
Putting all 3 products together
Commercial Projects Privately funded, less Grants Projects on table Manchester - Trafford Centre Middlesbrough Liverpool Galway Limerick
28
TRAM Power - next stage funding
Pre-production City Class Tram (£0.7m) Staff for marketing, bids & fees (£0.25m pa) Promote one of the schemes (£0.5m) 2 years = £2m total Set up factory to build trams (£4.0m)
29
Winning Contracts: Set up time Advance contract payment
Contract completion Retention payment