Download presentation
Presentation is loading. Please wait.
Published byCarol Ellis Modified over 9 years ago
1
Commissioning for Sustained Building Performance Building Performance Heifer Village Little Rock, AR 09/17/10 Retrocommissioning | RCx (Existing Building Commissioning | EBCx) University of Illinois Champaign, IL Damon McFall, PE, LEED AP www.fs.illinois.edu/retro
2
State Budget Gaps as of 7/15/10 Images thanks to : wwp.greenwichmeantime.com/time-zone/usa http://www.cbpp.org/cms/?fa=view&id=711 2 Commissioning for Sustained Building Performance
3
State Troubles = Public University Troubles 3 Commissioning for Sustained Building Performance
4
Current Financial Woes @ Universities 10% How Are Public Institutions to React? (Logos copyrighted by Universities) 4 Commissioning for Sustained Building Performance
5
Current Financial Woes @ Universities 16% How Are Public Institutions to React? (Logos copyrighted by Universities) 5 Commissioning for Sustained Building Performance
6
Current Financial Woes @ Universities 32% How Are Public Institutions to React? (Logos copyrighted by Universities) 6 Commissioning for Sustained Building Performance
7
Current Financial Woes @ Universities “I have never seen such a difficult time for colleges and universities in my 40 years as an educator.” - SIU Pres. Mr. Glenn Poshard http://www.universitybusiness.com/newssummary.aspx?news_date=2009-09-25&news_id=20490 http://www.universitybusiness.com/newssummary.aspx?news_date=2009-09-25&news_id=20490 How Are Public Institutions to React? (Logos copyrighted by Universities) 7 Commissioning for Sustained Building Performance
8
Institutional Commitments to Fulfill “…achieving energy independence for the U.S. as quickly as possible.” http://www2.presidentsclimatecommitment.org/html/commitment.pdf Image thanks to http://www.presidentsclimatecommitment.org/ 8 Commissioning for Sustained Building Performance
9
Reduce Energy Use Chilled Water and Steam Meter Projects Steam Trap Replacements LEED NC Silver Rating (NEW & REMODELS) Lighting Retrofits Energy Retrofits Thermal Storage Energy Service Companies (ESCO) Retrocommissioning (RCx) Existing Building Commissioning (EBCx) 9 Commissioning for Sustained Building Performance
10
Retrocommissioning @ Illinois HV AC 10 Commissioning for Sustained Building Performance
11
Retrocommissioning @ Illinois H “40% to 60%” - U.S. D.O.E. V AC 11 Commissioning for Sustained Building Performance
12
Effective Institutional RCx Teams Optimal Solution – HVAC & Controls Expertise as Leaders – Experienced Control Programmers Helmink McFall O’Brien Niebuhr Messman 12 Commissioning for Sustained Building Performance
13
Effective Institutional RCx Teams Optimal Solution – HVAC & Controls Expertise as Leaders – Experienced Control Programmers – Dedicated & Skilled Composite Crews Helmink McFall 13 Commissioning for Sustained Building Performance
14
Funding in a Deficit Environment Students Energy Cost Avoidance State of Illinois Grants (Logos copyrighted by companies) http://developers.face.com/examples/tagger-widget/ 14 Commissioning for Sustained Building Performance
15
Creating Synergy: Essential Encouraging Positive Working Relationships – Friendly staff – Weekly meetings – Immediate response Develop Team Environment – Team Responsibility – Team Decisions – Team Benefits 15 Commissioning for Sustained Building Performance
16
Succeeding One Building at a Time “A great team to work with…” – Elizabeth Dennison, Coordinated Sciences Lab “An excellent team to work with…” – Janet Kane, Physics “One of the few areas of good news…” – Terry Ruprecht, Director of Energy Campus Energy Use Index reduced 17.3% in part due to Retrocommissioning Efforts 16 Commissioning for Sustained Building Performance
17
RCx @ Illinois: History 101 3 years 18 people 27 buildings $2,600,000 spent $3,100,000 saved 378,821,000,000 BTUs avoided 17 Commissioning for Sustained Building Performance
18
The Journey Krannert Center for the Performing ArtsACES Library and Alumni CenterAnimal Sciences LaboratorySiebel Center for Computer Science 18 Commissioning for Sustained Building Performance
19
Shared Commonalities 19 of Chilled WaterElectricalSteam 19 Commissioning for Sustained Building Performance
20
Krannert Center for the Performing Arts 1967 20 of 20 Commissioning for Sustained Building Performance
21
Krannert Center for the Performing Arts Pneumatic Controls 21 Commissioning for Sustained Building Performance
22
Krannert Center for the Performing Arts 22 Commissioning for Sustained Building Performance
23
Krannert Center for the Performing Arts 24/7 $1,200,000 23 Commissioning for Sustained Building Performance
24
Krannert Center for the Performing Arts Strategy: Occupancy Schedules 50% 100% OFF 5 pm 11 pm 7 am 24 Commissioning for Sustained Building Performance
25
Krannert Center for the Performing Arts Strategy: Control System Upgrades 25 Commissioning for Sustained Building Performance
26
Krannert Center for the Performing Arts 35% $300,000 hansenhomesaventura.com $190,000 26 Commissioning for Sustained Building Performance
27
ACES Library & Alumni Center 27 Commissioning for Sustained Building Performance
28
ACES Library & Alumni Center 14,000 CFM 28 Commissioning for Sustained Building Performance
29
ACES Library & Alumni Center 24/7 $475,000 29 Commissioning for Sustained Building Performance
30
ACES Library & Alumni Center Strategy: Occupancy Schedules – (3) Distinct Calendar Periods Spring / Fall Semesters: 8am to 11pm Summer Semester: 8am to 9pm Summer, Winter, Spring, Thanks Breaks: 8am to 5pm – What Happens? Exhaust Fans Stop OA Dampers Close Static Pressure Reduced 100% 30 Commissioning for Sustained Building Performance
31
ACES Library & Alumni Center Strategy: Control System Analysis – Pneumatic Review – Confidence in thermostats – Faulty Humidity Sensor – Reheat System Schedule – Reduced the minimum VAV CFM 31 Commissioning for Sustained Building Performance
32
ACES Library & Alumni Center 42% $110,000 hansenhomesaventura.com $70,000 32 Commissioning for Sustained Building Performance
33
Animal Science Laboratory 33 Commissioning for Sustained Building Performance
34
Animal Science Laboratory 34 Commissioning for Sustained Building Performance
35
Animal Sciences Laboratory 24/7 $571,000 35 Commissioning for Sustained Building Performance
36
Animal Sciences Laboratory Strategy: Occupancy Schedules Where PossibleStrategy: Review Lab Exhaust System 36 Commissioning for Sustained Building Performance
37
Animal Sciences Laboratory 25% $60,000 hansenhomesaventura.com $102,000 37 Commissioning for Sustained Building Performance
38
Siebel Center for Computer Science 38 Commissioning for Sustained Building Performance
39
Reheat Coil Issues Control Sequences –Occupancy Sensor –“Night Setback” / Unoccupied –Lack of dead band Siebel Center for Computer Science 39 Commissioning for Sustained Building Performance
40
Siebel Center for Computer Science 24/7 $1,300,000 40 Commissioning for Sustained Building Performance
41
Connected occupancy sensors to HVAC Modified DDC programming Night Setback Sequence Increased dead band ranges on thermostats Recommended system cleanup Recommended 100+ HW reheat valves Siebel Center for Computer Science 41 Commissioning for Sustained Building Performance
42
Re-balanced entire building Minimum VAV CFMs Maximum VAV CFMs Siebel Center for Computer Science Lecture Hall Zone VFDs CO2 Monitoring Scheduling 42 Commissioning for Sustained Building Performance
43
Siebel Center for Computer Science 42% $290,000 hansenhomesaventura.com $277,000 43 Commissioning for Sustained Building Performance
44
Install required DDC Controls Implement Occupancy Schedules Reduce / Eliminate EA & OA CO 2 and RH feedback Improve Sequences of Operation Continuous commissioning by temperature control graphics Support & Encourage Occupant & Mechanic Behavioral Change Strategies Frequently Used 44 Commissioning for Sustained Building Performance
45
Commissioning for Sustained Building Performance Building Performance Heifer Village Little Rock, AR 09/17/10 Thank you! University of Illinois Champaign, IL Damon McFall, PE, LEED AP dmcfall@illinois.edu www.fs.illinois.edu/retro © Damon McFall, PE, LEED AP – August 2010 Copy or distribution of this presentation is strictly permitted without direct written consent.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.