Download presentation
Presentation is loading. Please wait.
Published byMiranda Campbell Modified over 9 years ago
1
BUSINESS ECONOMICS Class 1 12 November, 2009
2
Market Structures Monopoly – One price offer Duopoly – Two price offers Oligopoly – Few price offers Perfect Competition – Many price offers
3
Monopoly Monopoly (single seller) - exists when a specific individual or an enterprise has sufficient control over a particular product/service to determine significantly the terms on which other individuals shall have access to it. Lack of economic competition Monopsony – single buyer Formed by force, by law, naturally, integration Regulated in India by MRTP Act Examples: Indian Railways, Armed Forces
4
Imperfect Competition More than one seller or buyer Control of price is not determined by the market Duopoly, Oligopoly, Cartel Examples: Oil companies The Rule of Three (Sheth & Sisodia) Game Theory and Prisoner’s dilemma
5
Perfect Competition Infinite Buyers/Infinite Sellers – Infinite consumers with the willingness and ability to buy the product at a certain price, Infinite producers with the willingness and ability to supply the product at a certain price. Zero Entry/Exit Barriers – It is relatively easy to enter or exit as a business in a perfectly competitive market. Perfect Information - Prices and quality of products are assumed to be known to all consumers and producers. Transactions are Costless - Buyers and sellers incur no costs in making an exchange. Firms Aim to Maximize Profits - Firms aim to sell where marginal costs meet marginal revenue, where they generate the most profit. Homogeneous Products – The characteristics of any given market good or service do not vary across suppliers.
6
BUSINESS ECONOMICS Project Work 12 November, 2009
7
Force Projection * Assumption: All 3 Air Forces retire their pre-1980 aircrafts by 2015
8
MoD Initiatives EquipmentAgencyStatus Airframe design (CF-C) ADA, Bangalore Completed Turbofan Engine GTRE, Bangalore ‘Kaveri’ failed to meet thrust requirements; imports from GE or EuroJet considered RadarLRDE, Bangalore Co-developed with Elta, Israel Fly-by-wire FCS NAL, Bangalore Completed with help from Infosys and Airbus Electronic Warfare DARE, Bangalore ‘Mayavi’ EW co-developed with Elisra, Israel WeaponsDRDO, Bangalore Astra BVR, Russian missiles 7 aircrafts built Over 1000 test flights completed 40 aircrafts ordered by IAF, 6 by IN Mk1 of ‘Tejas’ to be inducted by 2010 Mk2 development to continue Indigenous development - LCA
9
IAF initiatives Upgrade existing aircrafts MiG-27 upgrade by HAL completed MiG-29 being upgraded by UAC, Russia with Zhuk PESA radar Mirage 2000 being upgraded by Thales & Dassault, France Sukhoi 30MKI to be fitted with BrahMos CM, Novator missile and AESA radar
10
Planning ahead for 2020 and Beyond 5 th Gen Fighter Aircraft Joint development with UAC, Russia (50% share) Based on Russia’s T-50 project (twin- engine heavy fighter) Stealth features (internal weapons, RAM-coated composite skin, S-duct inlet, reduced RCS) First test flight of Russian version in 2010 Medium MRCA Tender Global Competition – 6 Bids $12bn budget for 126 aircrafts Technology transfer/ Offset AESA radar, modern weapons RFP released in August 2007 Technical evaluation completed in May 2009. Field trials in progress
11
M-MRCA Technical Bid MakerEngineRadarTWRSpeedCostWeapons Eurofighter, UK, Germany, Italy, Spain 2x EJ200 (90 kN) Captor-E (new) 1.18Mach 2.3$120mn7tn Dassault, France 2x M88 (75 kN) RBE-2AA (u/d) 1.13Mach 1.8$80mn9.5tn Boeing, USA 2x GE414 (98 kN) APG-79 (mature) 0.93Mach 1.8$60mn8tn UAC, Russia 2x RD33MK (88 kN) Zhuk-AE (u/d) 1.10Mach 2.2$40mn7tn Lockheed- Martin, USA 1x GE110 (144 kN) APG-80 (mature) 1.09Mach 2.0$50mn6.5tn Saab, Sweden 1x GE414 (98 kN) Raven (u/d) 1.06Mach 2.0$50mn6tn
12
Competitive Offers Year TestedUsersValue-addition 1994-20034 partners, Austria, Saudi Arabia Closest to 5G aircraft. Invitation to India for a partnership in the EF program. 1986-2000FranceFull ToT and help with ‘Kaveri’ engine. Involved in the Mirage upgrades. 1996-2001USA, AustraliaMost advanced radar and weapons. Only offers partial ToT. Local partnership with HAL, Tata, L&T, BEL established. 2007-presentNone.Built on the MiG-29 platform. Offers full ToT and co-development of AESA radar. Strategic partner. 1990sUAEPartial ToT. Last version of the F-16. Opportunity for MRO facilities for largest operating fighter aircraft. 1990sSweden, Czech, RSA, Hungary, Thailand Similar to India’s own LCA. Dependency on foreign suppliers for engine and radar.
13
Political Decision Strategic relationship Help in indigenous LCA project Reliability of imported supplies Benefits to local industry Transparency in the award of contract Opposition in the Parliament War and defense planning Total Cost of Operation
14
International relations Russia – old and reliable ally since the Soviet era, has supplied majority of India’s aircrafts, warships, submarines, tanks and small arms. A former super- power, now an emerging economy with veto power. USA – Strategic partnership with India post 9/11, has supplied transport aircrafts, civilian nuclear reactor and helicopters. Global power with allies in Europe and Asia. Europe – Increasing trade relations; has supplied trainer and fighter aircrafts. Neutral stand on world affairs.
15
Group Work IAF Team (2 Groups) Conduct technical & financial evaluation. Recommend best-suited aircraft for the Air Force. Qualify and short-list 2 winners. Ministry of Defense (2 Groups) Evaluate the political and diplomatic relations with vendor countries. Select the contractor best suited to meet long-term strategic needs. Critical Creative Thinking Inquiry/ investigation Analysis Environment Stakeholder Solution Evaluation of Alternative Parameters Execution Recommendation Justification of Choice
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.