Presentation is loading. Please wait.

Presentation is loading. Please wait.

Assembly instructions Part 1 PPE & Tools 19 January 2014 Sunrider II.

Similar presentations


Presentation on theme: "Assembly instructions Part 1 PPE & Tools 19 January 2014 Sunrider II."— Presentation transcript:

1 Assembly instructions Part 1 PPE & Tools 19 January 2014 Sunrider II

2 Contents part 1 SectionSubjestSlide part 1 – 1HSE4 part 1 – 2Tools5

3 1. Persoonlijke beschermings- middelen (PBM)

4 Use appropriate Personal Protective Equipment (PPE): Work gloves. Disposable gloves. Hearing protection. Dusk mask. Safety goggles.

5 2. Tools.

6 Hole saw. ‘Cats-tail’ file.

7 Multi saw. (battery) drill. Power file.

8 Blind rivet pliers. Locking pliers. Rivet insert nut plier.

9 Scale Mixing cups, large, small. Stir wood. Grain 150 sandpaper. Sanding block.

10 Vice.

11 Benzene. Clamps, jaw length ~ 90 mm and 140 mm.

12 Sharp knife. Mastic gun. Ballast, minimum 25 kg (2x).


Download ppt "Assembly instructions Part 1 PPE & Tools 19 January 2014 Sunrider II."

Similar presentations


Ads by Google