The History of Base Realignments and Closures (BRAC)
2
2 History of Base Closures 1977 Legislation, 10 U.S.C. 2687 –Stopped closures for a decade 1988 Legislation, Public Law 100-526 –Congress codified commission charted by SECDEF –86 closures and 13 realignments –Successful process but had deficiencies 1990—SECDEF Announce Intent To Close Additional Bases –Congress enacted new legislation 1990 Legislation: Defense Base Closure and Realignment Act of 1990 –Created Commissions in 1991, 1993, and 1995
3
3 Defense Base Closure and Realignment Act of 1990 “To provide a fair process that will result in the timely closure and realignment of military installations inside the United States.” [Section 2901(b), Public Law 101-510]
4
4 Defense Base Closure and Realignment Act of 1990 The Players –Eight members, appointed by President, confirm by senate –GAO: Provide direct audit assistance to commission Report on process and recommendations by April 15
5
5 Defense Base Closure and Realignment Act of 1990 The Method –SECDEF publishes criteria and force structure plan used in developing base closure and realignment recommendations –Commission reviews SECDEF recommendations to ensure consistency with criteria and force structure plan –Certification of data –Testimony before commission under oath –Commission can change DoD recommendations if it finds secretary of defense “Deviated Substantially” from selection criteria or force structure plan
6
6 The Process Secretary of Defense Publishes Selection Criteria and Force Structure Plan (December) President Nominates and Senate Confirms Commissioners (January-February) Secretary of Defense Delivers Recommendations to the Commission (March 1) Commission Conducts Hearings and Deliberations (March 1 – June 30) Commission Delivers Recommendations to President (July 1) President Considers and Forwards Recommendations to Congress or Returns Recommendations to Commission (July 1 – July 15) Congress Has 45 Days (Excluding Recesses) to Enact a Resolution of Disapproval
7
7 Commission Responsibilities Ensure Fairness: –“IN CONSIDERING INSTALLATIONS FOR CLOSURE OR REALIGNMENT, THE SECRETARY SHALL CONSIDER ALL MILITARY INSTALLATIONS INSIDE THE UNITED STATES EQUALLY WITHOUT REGARD TO WHETHER THE INSTALLATION HAS BEEN PREVIOUSLY CONSIDERED OR PROPOSED FOR CLOSURE OR REALIGNMENT BY THE DEPARTMENT.” [Section 2903(c)(3), Public Law 101-510] Ensure Openness: –“EACH MEETING OF THE COMMISSION, OTHER THAN MEETINGS IN WHICH CLASSIFIED INFORMATION IS TO BE DISCUSSED, SHALL BE OPEN TO THE PUBLIC.” [Section 2902 (e)(2)(A), Public Law 101-510]
8
8 Final Selection Criteria Military Value 1.The current and future mission requirements and the impact on operational readiness on the department of defense’s total force. 2.The availability and condition of land, facilities and associated airspace at both the existing and potential receiving locations. 3.The availability to accommodate contingency mobilization and future total force requirements at both the existing and potential receiving locations. 4.The Cost and manpower implications. Return on Investment 5. The extent and timing of potential costs and savings, including the number of years, beginning with the date of completion of the closure or realignment, for the savings to exceed the costs. Impacts 6. The economic impact on communities. 7.The ability of both the existing and potential receiving communities’ infrastructure to support forces, missions and personnel. 8.The environmental impact
9
9 Cost of Base Realignment Actions “Cobra” Calculates costs and savings of user defined scenarios A comparative tool, not an optimizer No costs or savings from force-structure changes Construction supports realigning activities only Environmental clean-up costs not capture
10
10 1995 Commission Policies Every major base under consideration visited by at least one commissioner Regional hearings gave communities a chance to testify All documentation used in deliberations available to anyone All commission activities open to the press and the public Every affected community had a seat at the table
11
11 1995 Commission Activities 13 Investigate Hearing in Washington, DC –2 Hearings on “Life After Base Closure” – Federal efforts to help local communities develop reuse plans for closing bases 16 Regional hearings around the country including Guam and Alaska Commission and Commission Staff visited 167 separate military activities 2 Full days of open, public deliberations on all closure and realignment recommendations
12
12 Base Closure and Realignment Recommendations 199171 59(83 %)1 1993181152(84 %)18 1995146123(84 %)9 DoD Submittal Accepts Adds
13
13 Economic Impact California and Texas experience the largest number of jobs lost Guam has the largest percentage of jobs lost – approximately 7.9% Alaska loses approximately 0.4% of job base Texas, Alabama, Connecticut, North Dakota, and California all lose approximately 0.3% of job base
14
Back-up
15
15 Force Structure FY1990FY1995FY 1997 GOAL Army Divisions28(18)18(12)18(12)15+(10) (Active) Aircraft Carriers16 (1)13 (1)13 (1)12 (1) (Reserve/Training) Carrier Air Wings15(13)13(11)13(11)11(10) (Active) Battle Force Ships545451425346 Marine Corps4 (3)4 (3)4 (3)4 (3) Divisions (Active) Tactical Fighter36(24)26(15)26(15)20(13) Wings (Active) 1991 Commission 1993 Commission 1995 Commission
16
16 1995 Commission Results Recommended closure or realignment of 132 military installations in the United States and Guam –Approved 123 of the 146 closure or realignment recommendations proposed by the secretary of defense –Recommended closure or realignment of 9 of 32 additional military installations identified by the commission during its deliberations Commission recommendations will result in one-time costs of $3.6 Billion; Annual savings of $1.6 Billion once implemented; and 20-year savings of $19.3 Billion Recommendation for another base closure round in 2001 Recommendations for executive branch, congress and local communities to improve reuse process
17
17 1995 Closure and Realignment Recommendations ($ Millions) DoD Submission (28 February 1995)3,7431,76821,026 DoD Revised Baseline*3,5211,56918,994 Final Deliberation Results 3,5611,60619,317 Change from DoD+40+37+323 One-Time Costs Annual Savings 20-Year Savings (Net Present Value) *Reflects revisions in costs and savings estimates submitted to the Commission by the Defense Department, as well as the removal of the following installations from the list as requested by the Secretary of Defense: Kirtland AFB, NM: Dugway Proving Ground, UT; Caven Point US Army Reserve Center, NJ; and Valley Grove Area Maintenance Support Activity, WV.
18
18 Defense Base Closure and Realignment Commission Annual Savings Achieved from Final Recommendations ($ Millions) Annual Savings Proposed by DoD1,6193,0831,026* Annual Savings Achieved by 1,4882,1971,606 Commission Difference-141-886+35 One-Time Costs Annual Savings 20-Year Savings (Net Present Value) *Original March 1 estimate was $1,768M. Current estimate of $1,569M reflects revisions in savings estimates submitted to the Commission by DoD, as well as the removal of the following installations from the list of closures and realignments as requested by the Secretary of Defense: Kirtland AFB, NM; Dugway Proving Ground UT; Caven Point US Army Reserve Center, NJ; and Valley Grove Area Support Maintenance Activity, WV.
19
19 Economic Impact Emphasis, by law, is on first four criteria Economic impact was considered Commission Recommendations –1,689 fewer direct jobs lost than DoD recommendations –6,029 more total jobs (Direct + Indirect) lost than DoD recommendations
20
20 Depot/Shipyard Closure History (Prior to BRAC 95) Anniston Corpus Christi Tobyhanna xRed River xLetterkenny oLexington – Bluegrass oPueblo oSacramento oTooele Pearl Harbor Cherry Point Jacksonville North Island Portsmouth Crane Norfolk (NSY) Puget Sound Keyport xLouisville xLong Beach xGuam oPensacola oPhiladelphia oNorfolk oCharleston oMare Island oAlameda Oklahoma City Ogden Warner Robins Sacramento San Antonio Albany Barstow ArmyNavyAir ForceMarines Open xProposed oClosed
21
21 FY 99 Depot Capacity Utilization – Single Shift Based on Dod Certification Data Ogden ALC9,0054,89554 Oklahoma City ALC12,8636,65852 Warner Robins ALC9,9136,76368 San Antonio ALC15,2204,46329 Sacramento ALC10,2914,23141 Maximum Potential Capactity (000 Hours) Core (000 Hours) % Capacity Utilization
22
22 Summary of Cost Information Air Force Depots One-time Costs5754105824219257621,3321,1411,2931,106 Annual Savings8716076182621627316471153 Net Present Value3931,6072831,8882491,3084721,141442875 Return on Investment7191224226277 (Years) USAF Ratings 33 Point Maximum 11 15 26 29 33 Cobra ($ M) DoD DBCRC DoD DBCRC DoD DBCRC DoD DBCRC DoD DBCRC McClellan AFB Kelly AFB Robins AFB Tinker AFB Hill AFB
23
23
24
24