Download presentation
Presentation is loading. Please wait.
Published byHelena Mason Modified over 9 years ago
1
f Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev
2
f 2007 APC & Y2K – Shiltsev 2 Fermilab’s Accelerator Physics Center Accelerator Physics Center Technical Division Associate Director for Accelerators Accelerator Division Director
3
f 2007 APC & Y2K – Shiltsev 3 Coordinate and conduct accelerator R&D aimed at next-generation and beyond accelerator facilities Provide accelerator physics support for existing operational programs and the evolution thereof Train accelerator scientists and engineers Provide leadership and coordination in establishing the necessary facilities for a broad range of accelerator R&D that can be accessed by both Fermilab staff and the world HEP community Accelerator Physics Center: Mission
4
f 2007 APC & Y2K – Shiltsev 4 APC: Organization Structure Experimental Beam Research Beam Physics Education & Training APC Head Admin.Support Theory, Design & Modeling
5
f 2007 APC & Y2K – Shiltsev 5 APC: Components Experimental AARD US Particle Accel.School Accelerator PhD Program Peoples Fellows HINS Group Muon Collider R&D Group APC Head Admin Support Summer Student AccPhysProgram Energy Deposition LHC Accel.Syst. ILC Beam Physics Theory & Modeling
6
f 2007 APC & Y2K – Shiltsev 6 APC Status: Org Chart, Dates, etc
7
f 2007 APC & Y2K – Shiltsev 7 APC Status: Org Chart, Dates, Space, etc People: 35 Directly assigned 8 guests 8 grad students 4 joint appts. 26 in (…) Target date: June 1 st, 2007 Budget in work APC offices will be at : WH13 HQ (South X-over) Muon R&D (WH13E) Theory & Run II (WH13E) ILC (X-over and WH13W) CD CPA group (moved from WH9 to WH13W) US PAS (WH13W) Grad students/visitors (WH13E) WH12E ED group LARP Mike Kriss ILC Transf, linac, X-glry, BTW: HINS (Trsf Glry, X-, BTW) Muon R&D (Linac Glry, BTW) Theory/Run II (BTW) TD HINS, ILC, Muon magnets
8
f 2007 APC & Y2K – Shiltsev 8 FNAL Steering Group: Charge “…The group should develop a strategic roadmap of accelerator-based HEP that: supports the international R&D and engineering design for as early a start of the ILC as possible and supports the development of Fermilab as a potential host site for the ILC; develops options for an accelerator-based high energy physics program in the event the start of the ILC construction is slower than the technically-limited schedule; and includes the steps necessary to explore higher energy colliders that might follow the ILC or be needed should the results from LHC point toward a higher energy than that planned for the ILC. “ Y.K.Kim to chair the Steering Group. SG's report should be delivered to P.Oddone by Aug.1, ‘07
9
f 2007 APC & Y2K – Shiltsev 9 FNAL Steering Group: Membership Consultants: Neutrino physics group (8) + Flavor physics group (9) + Guests (11) = DoE, ILC, etc
10
f 2007 APC & Y2K – Shiltsev 10 SG work: http://www.fnal.gov/directorate/Longrange/Steering_ Public/index.html http://www.fnal.gov/directorate/Longrange/Steering_ Public/index.html Weekly meetings (5 so far), satellite meetings, etc - Webex Two “in person” meetings – in June and July Long list of possible facilities was pulled together at the very first meeting (16), started to sort things out At the last meeting, 4 sub-groups were formed: #1 and #2: Neutrino and Flavor Physics #3 Accelerator Facilities (S.H. and all accel fellas) #4 HEP colliders beyond ILC (Helen, Maury, VS) Besides that – off-the-box discussions encouraged (YKK lunches, DM, VS, SN among AD and TD, etc) – please speak up!
11
f 2007 APC & Y2K – Shiltsev 11 Status: we’ve discussed ILC and ILC test facilities T.Himel (SLAC), S.Ozaki (BNL), S.Nagaitsev (FNAL) sure – need NML like facility under discussion – 2% demonstration facility (5GeV SC RF linac) How to recycle existing facilities D.McGinnis (FNAL) Most you have heard of (>1MW neutrino, m2e, Recycler boomerang) New (Syphers): Tevatron as stretcher ring +SC RF separation = factor of 100 best koan physics facility LHC and LHC upgrades: S.Peggs (BNL) – lumi upgrades and LARP and IRUP V.Shiltsev (FNAL) – DLHC (double energy upgrade) Muon Collider and neutrino factory: S.Geer (FNAL) on current activities and short term plans of MCTF and NFMCC V.Shiltsev (FNAL) on large scale muon complex vision VLHC-I and VLHC-II: V.Shiltsev (FNAL) on design work, R&D needed SF machine in Tev tunnel - ?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.