TRANSPORT AND HARBOURS DEPARTMENT PERFORMANCE REPORT FOR THE YEAR 2014
3
Transport and Harbours Department has a fleet of eight (8) Vessels inclusive of 2 Motor Barges. The 2 new Chinese vessels – M.V. Kanawan and M.V. Sabanto operated the Parika – Supenaam Ferry Service assisted by the M.V. Malali which also plied the Wakenaam Service. The Bartica Ferry Service was operated by the M.V. Makouria, while the M.B. Sandaka plied the Leguan Service. The M.V. Kimbia and M.V Lady Northcote operated the North West District services to Kumaka and Port Kaituma respectively, while the Berbice Ferry Service was serviced by the M.B. Bonasika.
4
PARTICULARS NUMBERS/TONS INCREASE PERCENTAGE % 20142013 PASSENGERS362,860331,35231,50810 VEHICLES 62,088 58,502 3,5867 CARGO (tons)145,307125,600 19,70716 COMPARISON OF TOTAL PASSENGERS,VEHICLES AND CARGO TRANSPORTED IN 2014 AND 2013
5
PARTICULARS REVENUE DIFFERENCE $ PERCENTAGE % 2014 ($M) 2013 ($M) PASSENGERS 103,975,606 89,540,080 14,435,526 17 VEHICLES 213,588,550 227,122,020 (13,533,470) (6) CARGO 305,396,238 283,304,112 22,092,126 8 MISCELLANEOUS 71,538,353 79,496,147 (7,957,794) (10) TOTAL 694,498,747 679,462,359 15,036,388 3 COMPARISON OF REVENUE FOR PASSENGERS, VEHICLES AND CARGO TRANSPORTED IN 2014 AND 2013
6
SERVICE PASSENGERS # VEHICLES # CARGO TONS SUPENAAM 205,993 43,284 108,532 BARTICA 19,429 7,118 12,445 LEGUAN 83,424 11,605 14,011 NORTHWEST 4,892 81 10,312 BERBICE 49,122 - 7 TOTAL 362,860 62,088 145,307 TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED PER SERVICE FOR 2014
7
REVENUE AND EXPENDITURE YEARSREVENUEEXPENDITUREDEFICIT 2014 694,498,747701,850,997 7,352,250 2013 679,462,359806,984,512127,522,153 DIFFERENCE 15,036,388 Increase 105,133,515 Decrease -
8
MONTHLY AVERAGE FINANCIAL BREAKDOWN
9
In the year 2014, the Department received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel to the tune of $33.3M per month. However, the total expenditure for fuel and lubricant is $46.0M. Therefore the shortfall of $13.0M was funded by the Departments current revenue and assistance from the Maritime Administration Department.
10
VESSELS AMOUNT CONSUMED Gallons EXPENDITURE $ M.V. SABANTO4,2423,452,988 M.V. KANAWAN4,1913,411,474 M.V. MALALI1,5741,281,236 M.V. KIMBIA1,3601,107,040 M.V. MAKOURIA1,050854,700 M.V. LADY N/COTE930757,020 M.B. SANDAKA659536,426 M.L. SETTER182148,148 TOTAL14,18811,549,032. WEEKLY AVERAGE FUEL CONSUMPTION PER VESSEL
11
As can be seen above the average fuel consumption per week is 14,188 gallons with a total cost of $11.5M, the average monthly fuel consumption is therefore 56,752 gallons (that is 14,188 * 4) with a corresponding expenditure of $46M (that is $11.5M * 4). During the year 2014, the total Capital allotment to Transport and Harbours Department was $483.0M. This amount had catered for the dry-docking of three (3) vessels, Acquisition of Spares and the Rehabilitation of a few Stellings as follows:-
12
M.V. Malali – Allotment $120.0M The M.V. Malali which plies the Parika/Supenaam/Wakenaam route was docked at E.C. Vieira Dockyard for the period September 1 to October 9, 2014 at a cost of $118.0M. Extensive works were carried out to the hull, superstructure, underwater fittings and machineries/equipment. VESSELS/SHIPS
13
M.V. Malali docked at E.C. Vieira Dockyard
14
M.V. Kanawan and M.V. Sabanto – Allotment $50.0M These two (2) vessels which ply the Parika/Supenaam route are scheduled to be docked this year to the tune of $25.0M each. Critical areas to be addressed include the hull, where anodes would be installed, doors to be serviced, under water fittings to be checked and serviced. These vessels will be docked at E.C. Vieira Dockyard.
15
M.V. Barima The M.V. Barima which was slated to be docked in 2013 was docked in year 2014 at a total cost of $103,771,450. Due to the deplorable dock gate at Mazaruni the docking could not have materialized in 2013. The Gate has since been rehabilitated and the M.V. Barima is currently ongoing dry-docking there. Upon completion of her docking exercise she is slated to replace the M.V. Lady Northcote on the Georgetown North West district service. This should take effect by the first quarter in 2015 since additional works need to be addressed such as the winch and generator. ROLL OVER DOCKING TO 2014
16
M.V. Barima docked at Mazaruni Dockyard
17
M.V. Makouria The M.V. Makouria underwent dry-docking at the E.C.Vieira Dockyard during the period February 20 to March 21, 2014 at a cost of $135.0M. Works were carried out to the hull and underwater fittings, superstructure, machineries and equipment.
18
M.V. Makouria docked at E.C. Vieira Dockyard
19
Storage Bond – Allotment $15 million. The construction of a Storage Bond to store spares for the vessels and ships. Presently the spares are stored in two (2) containers. Acquisition of Spares – Allotment $200 million. The spares were acquired for maintenance repairs of vessels and ships totalling $204 million.
20
Storage Bond – Allotment $15.0M A total of $15,000,000 was allotted for the construction of a Storage Bond to house spares for the vessels and ships. The spares are presently being stored in 2 – 20ft containers and this usually pose difficulties when trying to retrieve parts/components.
21
Rehabilitation of the Transport and Harbours Department Head Office at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved. In addition, the building was enhanced with cubicles, new desks and other office furniture. Other Achievements for the year 2014
22
1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo river making it possible for the vessels to traverse freely. The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction. Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., 11.00 a.m. and 4.00 p.m. 2.The Mazaruni Dock gate was rehabilitated for $17.0M Improved Ferry Service in 2014
23
YEARSREVENUEEXPENDITUREDEFICIT 2014 679,394,114701,850,997 22,456,883 2013 679,462,359806,984,512127,522,153 DIFFERENCE 68,245 Decrease 105,133,515 Decrease - Revenue and Expenditure
24
PARTICULARS YEAR INCREASE PERCENTAGE % 20142013 PASSENGERS 351,023331,35219,6716 VEHICLES 58,138 58,502 -364(1) CARGO 138,573125,600 12,97310 TOTAL PASSENGERS, VEHICLES AND CARGO TRANSPORTED FOR 2014 AND 2013
25
PARTICULARS REVENUE INCREASE ($) PERCENTAGE % 2014 ($M) 2013 ($M) PASSENGERS 98,427,352 89,540,080 8,887,272 10 VEHICLES 208,948,334 227,122,020 -18,173,686 (8) CARGO 301,121,679 283,304,112 17,817,567 6 MISCELLANEOUS 79,466,148 79,496,147 29,999 0.04 TOTAL 687,963,513 679,462,359 8,501,154 1 COMPARISON OF TOTAL REVENUE FOR 2013 AND 2014
26
PARIKA LEGUAN WAKENAAM SUPENAAM STELLINGS –ALLOTTMENT $62.0M
27
Parika Rehabilitation works are ongoing at Parika Stelling at a total cost of $31.6M. Works slated to be effected include repairs to the fender/mooring system, cluster piles, changing of dilapidated
28
Leguan Works to the tune of $10,000,000 were executed at Leguan Stelling where fender/mooring systems were put in place, replacing of dilapidated decking, beams and piles.
29
Wakenaam A total of $6,000,000 was spent on Wakenaam Stelling where fender/mooring system was being put in place. Changing of decking and beams also the passenger accommodation was addressed.
30
Supenaam Repairs were effected to the mooring system and catwalk at the roll on / roll off facility, the fender/mooring system for the side loading and rails along the driveway. These works were done at a cost of $10,000,000.
31
HEAD OFFICE – INTERIOR The Transport and Harbours Department Head Office was renovated at a cost of $12.0M funded by MARAD where the working condition/environment has been greatly improved. In addition, the building was enhanced with cubicles, new desks and other office furniture. OTHER ACHIEVEMENTS
32
1.The Maritime Administration Department had dredged the Chalmers and Sting Ray crossing in the Essequibo River making it possible for the vessels to traverse freely. The vessels plying the Parika/Supenaam and Parika/Wakenaam services that were restricted to operate on tidal condition are no longer operating under such restriction. Instead of a boat every twelve (12) hours there will be a boat every five (5) hours three (3) trips per day that is 6 a.m., 11.00 a.m. and 4.00 p.m. IMPROVED FERRY SERVICES
33
2.The Mazaruni Dock Gate was rehabilitated at a cost of $17.0M. 3.The Department also received a subsidy of $400.0M from the Ministry of Finance, which assisted with the payment for Fuel.
34
There were two (2) major incidents in 2014 as listed hereunder: 1. On April 9, 2014 while lorry # GKK 9159 was disembarking the M.V. Kanawan which was berth alongside the Supenaam Stelling, the vessel sheared away about 6-8 feet from the stelling causing both chains and wire ropes to snap resulting in the said lorry falling overboard. This matter is presently engaging the attention of the Ministry of Legal Affairs; hence we are awaiting advice on the way forward. 2.On November 17, 2014 while the M.V. Sabanto was en route to Supenaam Stelling there was restricted visibility, hence the Captain and look outs lost all sense of direction and position, INCIDENTS
35
but the Captain failed to drop anchor and wait for the weather to improve. Nevertheless, the vessel continued to travel at an unsafe speed, relative to the condition of restricted visibility, the Captain then gave the wrong helm order thereby causing the vessel to run hard aground onto the south-western side of the Wakenaam Island in the Essequibo River. As a consequence, the Captain has since been dismissed from the Department’s service and the Helmsman and all the look outs were suspended from duty, without pay, for one month each.
36
MV Kanawan A Laden Truck fell off the rear Gangway door at Supenaam Stelling.
37
The ferry ran aground on Wakenaam Island MV Sabanto
38
Shortage of marine officers Limited human resources to conduct maintenance works. Inadequate Equipment, vehicles and machines for maintenance operation. Container used as storage facility for spare parts. Limited funds for Dry Docking of Vessels/Ships and rehabilitation works of buildings/facilities. An aging fleet of vessel with obsolete machineries. CHALLENGES FACED IN 2014
39
Docking and Rehabilitation of the M.V. Kimbia and M.B. Sandaka Acquisition of Spares for Vessels and Ships General rehabilitation to the Goods Wharf Additional rehabilitation of Bartica Stelling Construction of Passenger accommodation at Parika Stelling Rehabilitation of the Central Workshop and Construction of Living Quarters at Supenaam The department plans to acquire a new Ocean going ferry to operate the Georgetown/North West route and To restore the Berbice River Service PLANS FOR THE YEAR 2015
40
THANK YOU