1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug.

Similar presentations


Presentation on theme: "1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug."— Presentation transcript:

1 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE) Participants ITER-PPE training management board EFDA: Malaquias Artur CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie FZJ : Neubauer Olaf KIT : Neuberger Heiko (remote), Scherer Theo (remote) HAS : Bede Otto PPE euro-trainees CEA:Miguel Dapena, Julien Wagrez FZJ : Romaric Voinchet KIT : Gaetano Aiello, Zeile Christian HAS : Nemeth Joszef Observers CEA:Commin Lorelei, Madeleine Sylvain FZJ: Krimmer Andreas

2 2Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea 9h welcome coffee 9h30 Status of the PPE program (L. Doceul) 10h00 Work performed in the frame of WP1 (M. Dapena) 10h30 Work performed in the frame of WP2 (J. Wagrez) 11h00 Work performed in the frame of WP3 (G. Aiello) 11h30 Work performed in the frame of WP4 (C. Zeile) 12h Lunch 13h Work performed in the frame of WP5 (J. Németh) 13h30 Work performed in the frame of WP6 (R. Voinchet) 14h Work performed in the frame of EUROBREED program (L. Commin) 14h30 Open discussion on PPE program (sharing, conference, training session,….) (All participants, coffee at 15h included ) 15h15 Presentation of Tore-Supra (L. Doceul) 15h30 Visit of Tore-Supra 17h End of Monday meeting Agenda

3 3Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Brief recall of the PPE Work Programme: The thematic of the PPE WP is in the field of Engineering Design and Construction, this training program is associated to the procurement of the ITER Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement, safety, manufacturing aspect, assembly aspect, maintainability. The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years the first year being devoted to the recruitment of the trainees. Six work packages of three years duration are identified: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS The starting date of each work package being the official date of each euro-trainee recruitment.

4 4Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Work programmes description: WP1 (CEA) Tutor: Sophie Salasca Trainee: Miguel Dapena Nuclear Requirements in different phases from the engineering design to decommissioning (particular application on ITER diagnostic port plug equatorial 1) Starting date: 05/01/09 WP2 (CEA) Tutor: Jean Pierre Martins and Delphine Keller Trainee: Julien Wagrez Maintainability associated to ITER Component Lifecycle (particular application on ITER diagnostic port plug equatorial 1) Starting date: 03/06/09 WP3 (KIT) Tutor: Theo Scherer Trainee:Gaetano Aiello Materials, manufacturing and assembly of upper port plug structures (particular application on ITER ECRH upper port plug) Starting date: 01/09/08 WP4 (KIT) Tutor: Heiko Neuberger Trainee: Christian Zeile Design, manufacturing and integration of ITER relevant structural components (particular application on ITER TBM equatorial port plug) Starting date: 05/06/09 WP5 (HAS) Tutor: Otto Bede Trainee: Jozsef Németh Thermo mechanical Engineering of In-Vessel Components (particular application on ITER diagnostics) Starting date: 06/07/09 WP6 (FZJ) Tutor: Olaf Neubauer Trainee: Romaric Voinchet Feasibility of manufacturing in the design of ITER in- vessel components (particular application on ITER CXRS diagnostic port plug) Starting date: 05/01/09 ITER GOT PPE WEBSITE

5 5Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Trainee sharing: Sharing between association To be consolidated at the end of the meeting Sharing with industrial partner To be consolidated at the end of the meeting Course and events : Table to be discussed To be consolidated at the end of the meeting

6 6Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Deliverable Deliverables description for 2009 : All Contract have already started and all the trainees have been recruited during the first year, the ITER GOT PPE training program will run from the 01 September of 2008 to the 07 july of 2012 First deliverable (3 month) ‘’Personal Career Development Plan’’ (EFDA form to be filled). Completed for each wp At the end of 2009, progress report are required (progress made, activity status, skill obtained, corrective action if any, …) See EFDA recommendations EFDA recommendations: For this meeting one shall discuss the deliverables on the Task Agreement and produce the minutes (this is responsibility of the leading Association). For later a detailed report is due (by January or beginning of February 2010) which is a gathering of the individual reports from the associations and a summary report from the leading association mentioning the activities performed and the relation between the due deliverables and expenditures at date. A template will be sent later as EFDA is preparing one possible format at the moment. TASK AGREEMENT WP08-GOT-ITER_PPE

7 7Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Training on Nuclear engineering Dates: From Tuesday 8/12/09 to Friday 11/12/09 Location: Cadarache Training Building n°143 Training organisation: AREVA TA Objectives: Understanding the basic nuclear phenomena, radiation protection, safety and approach the specificities of a basic nuclear installation. Program: Tuesday Presentation of the training on nuclear engineering and its objectives Nuclear physics: (Neutronics, Fission/fusion reaction, particle, matter interaction) Wednesday Radiological risk General rules on radiation protection Risk prevention and protection rules The ALARA principle: design and operating applications Thursday Review of the french approach to nuclear safety Visit of nuclear installations on the AREVA TA site: RNG reactor and associated installations Friday Review of safety objectives of ITER Visit of nuclear installations on the CEA/Cadarache site: BNI LECA/STAR Course overview and debriefing


Download ppt "1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug."