IWM 2004 Tokyo, Japan Micropiles State of the Art Report Research and Practice Issues USA John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia
2
Results from ADSC/DFI Micropile Committee Research Initiative Funded by Industry Members
3
RequestActivity Requesting Party Proposed Funding StatusTask/Action 1 2001 LRFD AASHTO Specification D'Appolonia$25,000Approved by IAF COMPLETE TAA to contact T. Allen (WSDOT) and JW to contact Ohio DOT T-15 Committee member 2Buckling Paper MPIAF for Schnabel Engineering $2,000Approved by IAF COMPLETE 3 Coupled Joint Bending Load Test N.W. Cascade$0 Proposal not accepted by Steering Committee DEAD 4IWM LeadershipIWM$10,000 Supplemental funds previously committed to Al DiMillio. Al committed $25K for 2003 ON GOING 5 State D.O.T. Pooled Funds Research Tom Shantz (Coordinator) In KindOn Going Meet w/Tom to discuss details
4
RequestActivity Requesting Party Proposed Funding StatusTask/Action 6 WSU Research Project “Seismic Behavior” Adrian Rodriguez -Marek In KindOn Going Meet w/Adrian to discuss details 7FHWA MP Manual Chapter 6 D'Appolonia/Hayward Baker $9,000Approved by IAFCOMPLETE 8Practice UpdateGeotechnica, S.A.$0 Proposal not accepted due to limited funds and limited interest DEAD 9Strain Compatibility Fuller Mossbarger Scott & May $25,000Approved by IAF IN PROGRESS – Final test results presented to Task Force with Draft Report. Task Force to provide final comments to FMSM N.L.T. February 1 st. 10Grout Cubes v CylindersGeotechnical, S.A.$7,000 Buzek submitted database info to committee. Project pending Barry Newman(GAI) to review Buzek information and recommend direction to committee. Barry will give a report of his findings N.L.T. the spring meeting.
5
RequestActivity Requesting Party Proposed Funding StatusTask/Action 11Bending & Axial Load TestingMalcolm Drilling$0 Load test report placed in ADSC Technical Library COMPLETE 12 MICROFOR-Micropile CASE 1 & 2 Network Load Testing Brooklyn PolytechnicIn Kind 1) Task Force submitted concerns with research project and additional requests for more information 2) Task Force submitted cost estimates 3) Gary presented revised program and location Task Force reviewed revised research program with a revised location for the load testing. Task Force is in general agreement for the Spring Villa NGES site at Auburn University. Task Force to provide final comments to Gary and estimate costs. If satisfactory, will recommend for committee approval at spring meeting. 13 2005 Micropile Faculty Workshop ADSC$$$ and In Kind Task Force working w/Dan Brown(Auburn University) developing program and budget Moved to 2006. TAA to find a Champion to head this up. Jim H and John W will act in support roles. 14 Slope Stability/Earth Retention Design Procedure Golder AssociatesUnknown Gathering previous project instrumentation information No Action. Will be developed as part of NHI Course 132078 with Ryan Berg and Paul Sabbatini.
6
RequestActivity Requesting Party Proposed Funding StatusTask/Action 15 1995 Research Needs Assessment Report Micropile CommitteeUnknown Document provided to Task Force at Fall 2003 Committee meeting. Task force reviewed at GeoSupport 2004 meeting. Tom R. to provide a synthesis of the Task Force’s findings N.L.T. the spring committee meeting. 16Footing ConnectionsMicropile CommitteeUnknown Presented to Task Force at Fall 2003 Committee meeting. Victor Elias has potential FHWA funds with UC Davis to perform some research in this area. GAI to provide a proposal to perform a research project. 17Pile JointsMicropile CommitteeUnknown Presented to Task Force at Fall 2003 Committee meeting Jesus′ Gomez to Champion this investigation and possibly develop a white paper.
7
RequestActivity Requesting Party Proposed Funding StatusTask/Action 18Micropile RaftsMicropile CommitteeUnknown Presented to Task Force at Fall 2003 Committee meeting No action – Low Priority 19 Group vs. Florida Pier Design Analysis Comparison Study Micropile CommitteeUnknown Presented to Task Force at Fall 2003 Committee meeting Aomar Benslimane to submit a proposal comparing the two along with their applicability to micropiles. 20Malcolm Load Test Report White Paper Micropile CommitteeUnknownPresented to Task Force at Fall 2003 Committee meeting See comments from Item No. 17
8
Completed Research Publications Buckling of Micropiles – White Paper by Cadden & Gomez AASHTO LRFD Design and Construction Specifications Micropile Steel and Grout Strain Compatibility Study Available on CD or by Email
9
AASHTO LRFD Specification
10
New Developments - Titan Bars
11
Titan Drill Bit
12
Bulk Cement and Portable Batch Plant
13
Other Issues: Large 2 ½ inch Diameter GR 150 bars Large 3 ½ inch Diameter GR 75 bars Steel Pipe Shortage and High Prices! Lack of 5 ½, 7, and 9 5/8 inch Pipe
14
The End Questions?
15
Reques t Activity Requesting Party Proposed Funding StatusTask/Action 1 2001 LRFD AASHTO Specification D'Appolonia$25,000Approved by IAF COMPLETE TAA to contact T. Allen (WSDOT) and JW to contact Ohio DOT T-15 Committee member 2Buckling Paper MPIAF for Schnabel Engineering $2,000Approved by IAF COMPLETE 3 Coupled Joint Bending Load Test N.W. Cascade$0Proposal not accepted by Steering CommitteeDEAD 4IWM LeadershipIWM$10,000 Supplemental funds previously committed to Al DiMillio. Al committed $25K for 2003 ON GOING 5 State D.O.T. Pooled Funds Research Tom Shantz (Coordinator) In KindOn GoingMeet w/Tom to discuss details 6 WSU Research Project “Seismic Behavior” Adrian Rodriguez -Marek In KindOn GoingMeet w/Adrian to discuss details 7 FHWA MP Manual Chapter 6 D'Appolonia/Hay ward Baker $9,000Approved by IAFCOMPLETE 8Practice Update Geotechnica, S.A. $0 Proposal not accepted due to limited funds and limited interest DEAD 9Strain Compatibility Fuller Mossbarger Scott & May $25,000Approved by IAF IN PROGRESS – Final test results presented to Task Force with Draft Report. Task Force to provide final comments to FMSM N.L.T. February 1 st. 10 Grout Cubes v Cylinders Geotechnical, S.A. $7,000 Buzek submitted database info to committee. Project pending Barry Newman(GAI) to review Buzek information and recommend direction to committee. Barry will give a report of his findings N.L.T. the spring meeting. 11 Bending & Axial Load Testing Malcolm Drilling$0 Load test report placed in ADSC Technical Library COMPLETE 12 MICROFOR- Micropile CASE 1 & 2 Network Load Testing Brooklyn Polytechnic In Kind 1) Task Force submitted concerns with research project and additional requests for more information 2) Task Force submitted cost estimates 3) Gary presented revised program and location.Task Force reviewed revised research program with a revised location for the load testing. Task Force is in general agreement for the Spring Villa NGES site at Auburn University. Task Force to provide final comments to Gary and estimate costs. If satisfactory, will recommend for committee approval at spring meeting. 13 2005 Micropile Faculty Workshop ADSC$$$ and In Kind Task Force working w/Dan Brown(Auburn University) developing program and budget Moved to 2006. TAA to find a Champion to head this up. Jim H and John W will act in support roles. 14 Slope Stability/Earth Retention Design Procedure Golder Associates Unknown Gathering previous project instrumentation information No Action. Will be developed as part of NHI Course 132078 with Ryan Berg and Paul Sabbatini. 15 1995 Research Needs Assessment Report Micropile Committee Unknown Document provided to Task Force at Fall 2003 Committee meeting. Task force reviewed at GeoSupport 2004 meeting. Tom R. to provide a synthesis of the Task Force’s findings N.L.T. the spring committee meeting. 16Footing Connections Micropile Committee Unknown Presented to Task Force at Fall 2003 Committee meeting. Victor Elias has potential FHWA funds with UC Davis to perform some research in this area. GAI to provide a proposal to perform a research project. 17Pile Joints Micropile Committee Unknown Presented to Task Force at Fall 2003 Committee meeting Jesus′ Gomez to Champion this investigation and possibly develop a white paper. 18Micropile Rafts Micropile Committee Unknown Presented to Task Force at Fall 2003 Committee meeting No action – Low Priority 19 Group vs. Florida Pier Design Analysis Comparison Study Micropile Committee Unknown Presented to Task Force at Fall 2003 Committee meeting Aomar Benslimane to submit a proposal comparing the two along with their applicability to micropiles. 20 Malcolm Load Test Report White Paper Micropile Committee Unknown Presented to Task Force at Fall 2003 Committee meeting See comments from Item No. 17