Risk Assessment – It’s necessity Risk Assessment – It’s necessity 7 th August, 2014 Parag Gupta Executive Vice President Head – Commercial Line IFFCO Tokio.

Similar presentations


Presentation on theme: "Risk Assessment – It’s necessity Risk Assessment – It’s necessity 7 th August, 2014 Parag Gupta Executive Vice President Head – Commercial Line IFFCO Tokio."— Presentation transcript:

1 Risk Assessment – It’s necessity Risk Assessment – It’s necessity 7 th August, 2014 Parag Gupta Executive Vice President Head – Commercial Line IFFCO Tokio General Insurance

2 Risk Management The Identification, Evaluation and Economic control of those risks which can threaten the assets, human being or earning capacity of an enterprise.

3 Risk Assessment !!! Identification and Evaluation of Risks around us…

4 Risk Assessment If Identified and Evaluated at the earliest can prevent or diminish quantum of a future damage / loss. We are surrounded with potentially damaging physical event, phenomenon or human activity that may cause the loss of life or injury, property damage, social and economic disruption or environmental degradation.

5 Fire & Explosion!!!! Recent one??? Any guesses China Automobile part manufacturing unit explosion/ fire

6 Fire

7 Milford Haven August 1983 Loss: $30 Mn Boil-over

8 UVCE Sarawak December 1997 PD 282 M$ US Vapour cloud explosion

9 UVCE Norco, Louisiana May. 1988 FCC Unit PD 314 M$ US Vapour cloud explosion

10 BLEVE Feyzin, France Jan. 1966 LPG Sphere Tanks Operation Explosion (BLEVE)

11 BLEVE Mexico City Nov. 1984 LPG Tanks 500-600 died Explosion (BLEVE)

12 force of detonation was equivalent to 40 tones of TNT. Loss amount is roughly Euro 1.8 bn. 30 people were killed and 500 injured. Explosion

13 Fire Office building fire

14 Fire French bank building May, 1996

15 Oil Rig sank in Brazil 15 th March, 2001 Property loss - $496m Marine

16 The tanker broke into two because of heavy seas and sank at a dept of 3600m about 137 sea miles from Spanish coast. loss was about US$36m. Marine

17 Collision occurred between a car transporter Tricolor and a container ship kariba. The tricolor sank soon containing 2862 BMWs, Saabs and Volvos and 77 containers. Overall loss amount was euro 55 million. Marine

18 Risk Assessment There is a lot we can do to control these sources…

19 Oh. It’s a Snake Let me Kill it Oh. It was tail of a tiger

20 Risk Assessment Following are the basic elements we may consider for Risk Assessment: –Management –Construction –Occupancy –Protection –Exposure MCOPE

21 Risk Assessment Management policies to ensure safety and loss prevention.. MANAGEMENT Issues in layout for factory facilities, Construction Aspect, fire-resistance of buildings, fire separations etc. CONSTRUCTION Issues in fire load reduction (house keeping, stock control etc.), control of ignition sources, maintenance / Inspection of equipment, process hazards etc OCCUPANCY Issues in fire protection and special protection e.g. Pressure safety valves, Equipment protection, fire alarms, interlocking system etc PROTECTION

22 Toyota Motors Associate supplier – Aisin’s auto parts plant was razed to ground on 01.02.1997, Saturday Used to supply all but 1% of brake-fluid proportioning valves (P-valves) 20 Toyota plants were shut down Each day Toyota is down, Japan’s industrial output is cut by 0.1% point Within five days plants were started Good Risk Management

23 How had Toyota managed to do that? Mutual aid Specific responsibilities Top level commitment Crises management plan Good Risk Management

24 Bhopal disaster Leak of Methyl Isocyanate (MIC) from Union Carbide Bhopal plant Storage in 3 steel tanks, 171 M3 Three safeguards - refrigeration - scrubber - flare stack Bad Risk Management

25 Genesis of the disaster lies not in the failure of the safeguards but in the original design concept. Question is, was such a large inventory essential? Process of making Sevin (pesticide) without using MIC or Adopting a process which used up MIC as fast as it was made. Bad Risk Management

26 “ The real objective of Risk Management is to reduce fear of the unknown and unexpected events and to create confidence in future.” - Felix Kloman

27 We Know not what tomorrow holds Nor what the future will entail Yet we know, those who fail to prepare Must be prepared to fail !!

28 Thanks For Your Kind Attention !!!