Presentation is loading. Please wait.

Presentation is loading. Please wait.

ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field.

Similar presentations


Presentation on theme: "ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field."— Presentation transcript:

1 ExxonMobil BBS web tool Version June 2011

2 What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field verification and validation process Reports – Selection criteria – Stewardship reports for AO Validated, active users, AO’s and Questionable items AO DTR – Layout – Job description added as quality criteria Near miss – Layout – Actual versus planned closing date – OIMS system reference (ExxonMobil only) JSA DTR – Button added on 1 st level

3 What has changed – Alert Observations Project #: – Field added to cluster AO’s per project – Convention the apro number is to be used for Coteba/Artelia projects TBD for ABB programs

4 What has changed – Alert Observations Time: – Time plus AM/PM indication changed into 24 Hrs clock – Convention HH:MM format to be used

5 What has changed – Alert Observations Unannounced AO: – Field ( Yes/No) added to indicate if the AO was announced or not Unannounced means that the observer appears on site without giving a heads up or pre-notice to the persons observed – One should strive to maximize the number of unannounced visits

6 What has changed – Alert Observations Description of Task & Background Information / Work Conditions: – Importance of this field is raised and it is added on the AO DTR template as a separate item

7 What has changed – Alert Observations Questionable Item #: – Field protected from direct input – QI are picked up by the system from Page 2 of the AO Signature field has been eliminated

8 What has changed – Alert Observations Field verification and validation: – In the field follow up and Quality review of the recommendation that were implemented to confirm: Effectiveness and Sustainability over time – Should be performed 1-3 months after the confirmed implementation date Field Verification and Validation new

9 What has changed – Alert Observation DTR Page 2 Positive comments / Questionable items – Split into 2 sections Page 1 Job description – Added new Split

10 What has changed – Alert Observation DTR Field Verification and Validation process – No longer obsolete new Split

11 What has changed - Reports new

12 What has changed - Reports AO Count Report - Vendors working for >1 OSP – Selection of AO’s is now based on the OSP selected in the AO form when completing the AO – In the past the selection was based on default OSP, resulting in incorrect counts Test vendor has performed 124 AO’s for work ordered by OSP 1 and 6 for work ordered by OSP 2 Test Vendor Test Vendor OSP1 selected Test Vendor OSP2 selected

13 What has changed - Reports LPO Validated – Stewardship report to monitor the completion of the field verification and validation (V&V) Verification and validation takes place 1-3 months after the implementation Report is general indicator if verification is still required The AO list gives detail which AO’s need V&V

14 What has changed - Reports LPO Validated – continued The AO list gives detail which AO’s need V&V Vendors can order by clicking on the “Field Validation completed? “ column in the header

15 What has changed - Reports Questionable items per month and YTD – Stewardship report to monitor quality of AO process and indirect also the application of the deeper dive tools Test Vendor

16 What has changed - Reports Active users – Stewardship report to manage the User Base – Every vendor should have at least one user that has admin rights, if not, contact ABB or Coteba/Artelia enables that user to create new users and to change the status to inactive of users that are not longer participating

17 What has changed – JSA DTR “Add Default JSA DTR” button – Button added on first JSA DTR level to open blank JSA DTR template new

18 What has changed – Near Miss New layout of the Near miss / hazard identification form – more logical flow

19 What has changed – Near Miss Added reference to OIMS system (ExxonMobil only) Added “Actual Completion Date” versus “Expected Completion Date” new


Download ppt "ExxonMobil BBS web tool Version June 2011. What has changed Alert Observations – Project number – Observation time – Unannounced Observations – Field."

Similar presentations


Ads by Google