1 Network and Operational Planning
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.

2 Overview of network and operational planning
Planning methodology Phase 1: Problem definition and planning Phase 2: Data collection and analysis Phase 3: Recommendations and implementation Supply chain analysis methods and techniques

3 Decisions often require complex and data-intensive analysis
Planning methodologies enable evaluation of options in response to customer behavior Decisions often require complex and data-intensive analysis Complexity is due to Large number of factors impacting total cost Range of alternative solutions available Data-intensiveness is due to Large amount of information required to evaluate each alternative E.g., range of service alternatives, range of cost assumptions, range of operating technologies

4 Generalized planning methodology showing major phases of work
Problem definition and planning Data collection and analysis Recommendations and implementation Figure 14.1 Research Process

5 Problem definition and planning provides the foundation for the overall analysis
Feasibility assessment Analyze the current situation Develop supporting logic Estimate the cost-benefit to proceed Project planning State objectives of proposed changes State constraints to scope of study Establish measurement standards Select analysis techniques Create a project work plan

6 Feasibility assessment begins with analysis of the current situation
Requires an Internal operational review Market assessment Technology assessment Tables in text illustrate topics of inquiry for this work See Tables 14.1, 14.2 and 14.3 Situational analysis should determine existing capabilities and help define improvement potential

7 Develop a supporting logic to integrate the findings from the current state analysis
Identify the value proposition to justify investment in detailed research and analysis Critical fact-based evaluation of current procedures and practices What is working well? What areas can we improve? Identify potential alternatives Define current operations Identify likely design alternatives Suggest innovative approaches

8 Estimate the project’s potential benefits and risks
Benefits should be estimated for Service improvements Cost reductions Cost prevention “Low hanging fruit” opportunities Illustration of sample risks defined for each alternative

9 Project planning involves these specific tasks
State objectives of proposed changes State constraints to scope of study Establish measurement standards Assumptive logic Select analysis techniques Create a project work plan

10 Statement of objectives should be stated specifically and in measurable terms
Should define market segment, the time frame for change and specific performance expectations Example objectives Provide 100 most profitable customers with perfect order performance on all orders All other customers receive 99% inventory availability for category A products 95% inventory availability for category B products Delivery of 98% of all orders within 48 hours of placement

11 Statement of constraints should identify restrictions placed by senior management
Defines the specific organizational elements to be retained in current system Facility, alliance, resource, system, procedural or channel constraints Common examples Hold existing manufacturing facilities and product mix constant Omit some divisions from a centralized logistics system “Why study things we don’t plan to do anything about?”

12 Measurement standards direct the analysis by listing assumptions about cost and performance
Standards should adequately reflect a total system performance view Avoid a suboptimal focus on logistics functions List assumptions that support standards How is each cost component to be quantified?

13 Develop a project work plan for the remaining phases of the study
Schedule of tasks Resource requirements Personnel Data collection and analysis Analysis tools Meeting schedules Updates to share progress with executives Illustration of sample project work plan with meeting schedule

14 Data collection and analysis activities
Assumptions and data collection Define analysis approach and select techniques Define and review assumptions Identify data sources Collect data Collect validation data Analysis Develop questions for analysis Validate the baseline analysis Analyze each alternative Complete sensitivity analysis

15 Analytical approach uses numerical tools to evaluate each alternative
Spreadsheet and statistical software availability have increased use of these techniques Examples Determine the inventory/service trade-offs using safety stock and fill rate formulae Determine the order cycle time that is required to deliver 95% of customer orders Determine the transportation dollar benefits for consolidating LTL orders into TL orders

16 Simulation is widely used, particularly when significant uncertainty is involved
Conduct experiments using a physical or numerical model of the real system Understand overall system behavior over time Use to evaluate operations under different strategies Appropriate when Limited number of variables are evaluated Need a more realistic representation of the process Need customer order or SKU level of detail

17 Optimization uses linear programming to evaluate and select best alternative
Appropriate for Problems where objectives and constraints can be expressed in mathematical terms Alternatives involving sweeping changes to the logistics systems Limitations include Demand on computing resources Models are smaller in scope than simulations Example Determine the best location for distribution facilities subject to meeting supply, demand, and delivery time constraints

18 Define and review assumptions
Business E.g., relevant market, consumer and product trends, resource availability, and competitive actions Management E.g., alternative warehouse locations, transport modes, ownership arrangements, logistics processes, fixed and variable costs Analysis Define constraints and limitations to fit the problem to the technique selected

19 Detailed description of assumptions by category
Table 14.4 Assumption Categories Elements

20 Identify data sources to fit the analytical technique
What are the sources for Sales and customer orders? Specific customer data that includes a spatial dimension? Manufacturing and purchasing costs? Transportation data? Benchmarking data on competitive capabilities and flow?

21 Analysis involves use of technique and data to evaluate logistics alternatives
First, develop questions about alternatives and the range of acceptable uncertainty Second, validate the technique and model using validation data Third, repeat the analysis for each alternative to be evaluated Finally, the best-performing alternatives can be evaluated for sensitivity to other factors or scenarios

22 Recommendations and implementation
Development of recommendations Identify best alternative Estimate costs and benefits Develop risk appraisal Develop presentation Implementation Define implementation plan Schedule implementation Define acceptance criteria Implementing the plan

23 Sample presentation visual showing best alternative
Recommendations to management are developed through critical review of the analysis results Identify best alternative Estimate costs and benefits Develop risk appraisal Develop presentation Sample presentation visual showing best alternative

24 Implementation is necessary to realize any business benefits from the recommendations
Define implementation plan Events, activities and decisions with dependent relationships Schedule implementation Timeline of plan details E.g., acquire facilities, negotiate agreements, mobilize teams, and conduct training Define acceptance criteria How will we measure success? Implement the recommendation Establish controls to monitor plan and acceptance criteria

25 Methods and techniques of analysis for supply chain decisions
Design decisions Design logic Inventory decisions Transportation decisions Freight lane analysis Inventory analysis

26 Design decisions focus on selecting number and location of plants, warehouses and other nodes
Determine total costs and trade-offs for alternative channel strategies, activity outsourcing or offshoring decisions Typical questions include Where should plants and distribution centers be located? Which market areas should be served by each distribution center? Which product line should be stocked at each warehouse? What marketing channels should be used to serve international markets? Which service providers should be used for long-term contracts?

27 Design logic defines the method used to select from a number of available options
Optimization models consider a range of complex data to evaluate alternatives Aggregate customer demand Aggregate supply availability Product and information flows at each stage Transportation alternatives and costs Other variable costs Major problems with linear programming Need explicit functional relationships for full range of design options Only as valid as the design problem definition Often limited by number of stages in the supply chain and problem size

28 Illustration of scope of typical supply chain analysis
Figure 14.2 Total Cost Analysis Approach

29 Data requirements for supply chain analysis include the following key elements
Markets defined by geographic segments Products defined by the number of stock keeping units required Network defines channel members and locations including current and proposed Customer demand as shipment volume by market geography Transportation rates for inbound and outbound volume For each shipment size For each potential transportation link Variable and fixed costs Tax incentives

30 Illustration of how US might be segmented in market areas
Figure 14.3 Supply Chain Network

31 Figure 14.4 Channel Network Example
Illustration of a network definition for channel of industrial and retail customers Figure 14.4 Channel Network Example

32 Evaluation of alternatives
Baseline analysis is done first to validate cost and establish credibility of the analysis Other alternatives are modeled and analyzed Results can be compared to baseline to identify performance improvements Baseline Model Alternative Models

33 Illustration of baseline network with two plants and two warehouses
Figure 14.5 Base Supply Chain Network

34 Illustrates an alternative supply chain with 3 plants and 4 warehouses
Figure 14.6 Alternative Supply Chain Network

35 Concerns of supply chain design tools
Treatment of inventory carrying cost Assumptions of shipment sizes over range of alternatives Constant or varies with change in number of warehouses Focus of analyses Expanding boundaries of supply chain members Minimize total cost vs. maximize profit Periodic vs. ongoing

36 Figure 14.7 Analytic Inventory Overview
Illustration of the analytic inventory concept to make inventory decisions Results of analysis Figure 14.7 Analytic Inventory Overview

37 Illustration of the simulation approach to inventory analysis
Results of analysis Figure 14.8 Inventory Simulation Overview

38 Transportation decisions range from strategic to tactical in scope
Strategic routing decisions Identify long-term fixed transport modes Monthly or yearly routes Tactical routing decisions Allocate resources for the short-term Daily or weekly routes Objective is to minimize the combination of vehicles, hours and miles required to deliver product

39 Illustration of typical transportation problem
Figure 14.9 Typical Routing or Delivery Problem

40 Transportation analysis techniques
Heuristic approaches Use rule-of-thumb techniques to sequentially add and delete stops Exact approaches Use linear programming to identify best routes Interactive approaches Use simulation, cost calculator or graphics capability to support interactive decision process Combination approaches Blend of the three approaches is very effective Criteria for evaluating approaches How general is the approach? E.g., special situations, multiple depots, time windows, vehicle capacities How accurate is the approach? Is it a close approximation of performance characteristics?

41 Data requirements for transportation analysis
Network defines all possible routes Demand data defines periodic customer pickup and delivery requirements Operating characteristics define Number of vehicles Vehicle limitations Driver constraints Operating costs

42 Figure 14.10 Example of Triangular Freight Lane
Freight lane analysis seeks to balance volume between origin and destination points Results of analysis Develop additional volume between Cincinnati and Chicago Move product sources to Chicago Alliance with shipper with no back-haul Figure Example of Triangular Freight Lane Table 14.6 Freight Lane Analysis of Monthly Movements

43 Illustration of inventory analysis showing key results for management review
Table 14.7 Typical Inventory Analysis Report


Download ppt "Network and Operational Planning"