Presentation is loading. Please wait.

Presentation is loading. Please wait.

MINES SAFETY IN INDIA CONTROL OF ACCIDENTS AND DISASTERS IN 21 ST CENTURY S. N. PADHI FORMER DIRECTOR GENERAL OF MINES SAFETY GOVERNMENT OF INDIA.

Similar presentations


Presentation on theme: "MINES SAFETY IN INDIA CONTROL OF ACCIDENTS AND DISASTERS IN 21 ST CENTURY S. N. PADHI FORMER DIRECTOR GENERAL OF MINES SAFETY GOVERNMENT OF INDIA."— Presentation transcript:

1

2 MINES SAFETY IN INDIA CONTROL OF ACCIDENTS AND DISASTERS IN 21 ST CENTURY S. N. PADHI FORMER DIRECTOR GENERAL OF MINES SAFETY GOVERNMENT OF INDIA

3 MINING IN INDIA 4600 COAL MINES 435 OIL PROJECTS 46000 METALI EROUS MINES 4PRIMARY LABOUR INTENSIVE 4ONE MILLION PERSONS EMPLOYED 4OPENACAST COAL MINING ON INCREASE 426% IN 1972 AND 75% IN 2000

4 ACCIDENT EXPERIENCE OVER A CENTURY - COAL AND NON COAL MINES

5 ACCIDENT EXPERIENCE LAST DECADE - COAL MINES

6 ACCIDENT EXPERIENCE LAST DECADE - METALI FEROUS MINES

7 ACCIDENT EXPERIENCE CAUSE WISE - COAL MINES

8 ACCIDENT EXPERIENCE CAUSE WISE - METALLIFEROUS MINES

9 ROOF FALL - MAJOR KILLER IN COAL MINES INITIATIVES FOR REDUCTION -PIACT MISSION (ILO) - FRESHLY EXPOSED ROOF -DGMS / CMRS - EXPERIMENT : NEW SUPPORTS -EXPERT GROUP GUIDE LINES -R.M.R. AND SUPPORT SYSTEMS -REGULATIONS AMMENDED - SUPPORT PLANS -STEEL SUPPORTS AND ROOF BOLTING -FOREIGN EXPERTISE : DGMS GUIDE LINES

10 DUMPERS TRANSPORT MACHINERY MAJOR KILLERS IN OPENCAST MINES MAJOR INITIATIVESMAJOR INITIATIVES SAETY CONFERENCE RECOMMENDATIONSSAETY CONFERENCE RECOMMENDATIONS CODE OF PRACTICE FOR DUMPING ETCCODE OF PRACTICE FOR DUMPING ETC MAINTENANCE OF HAUL ROADSMAINTENANCE OF HAUL ROADS REPAIR AND OVER HAUL OF HEMMREPAIR AND OVER HAUL OF HEMM TRAINING OF OPERATORSTRAINING OF OPERATORS

11 CONTROL OF ACCIDENTS (A) NEW INITIATIVES - MANAGEMENT NINTH SAFETY CONFERENCE RISK ASSESSMENT : SAFETY MANAGEMENT PLAN EMBRACE ORGANISATIONAL, BEHAVIOURIAL AND CULTURAL SYSTEMS OVER ENGINEERING INITIATIVES ROLE OF MANAGER AS PROMOTOR AND FACILITATOR TEAM BUILDING AND COMMUNICATION SAFETY PERFORMANCE APPRAISAL IN BOARD MEETINGS

12 CONTROL OF ACCIDENTS (B) NEW INITIATIVES : WORKERS TOTAL INVOLVEMENT OF ALL EMMPLOYEES IN SAFETY MANAGEMENT PHYSICAL, EMOTIONAL AND PSYCHOLOGICAL EFFECTIVE SAFETY COMMITTEES SECTIONAL / DEPARTMENTAL FOR SPECIFIC AREAS OF OPERATION

13 CONTROL OF ACCIDENTS (C) NEW INITIATIVES : ENGINEERINGS QUALITY CONTROL OF MATERIALS BY USER BY MANUFACTURER BY SUPPLIER CONFIRM STANDARDS QUALITY CONTROL / TESTING CELLS

14 DISASTERS IN COAL MINES CAUSE WISE - OVER LAST CENTURY

15 DISASTER IN COAL MINES CAUSE WISE - SPECIFIC PERIODS - PERCENTAGE

16 FATALITIES DUE TO EXPLOSIONS REDUCED MAJOR CAUSES WITHDRAWAL OF MUGGBATTIS (OPEN FLAME) INTRODUCTION OF CAP LAMPS STONE DUST BARRIERS ALL U.G. COAL MINES TREATED GASSY IMPROVED VENTILATION STANDARDS ADOPTION OF IMPROVED TECHNOLOGY MANDATORY EMERGENCY PLANS

17 DISASTERS DUE TO INUNDATION MAJOR CAUSES CRISS CROSSED RIVER VALLEY’S ABANDONED WORKINGS NEAR WATER BODIES LOWERING OF GROUND PROFILE DUE TO MINING MULTIPLE SEAMS - WATER LOGGED WORKING FRAGMENTED AND THIN MINE BOUNDARIES UNSTABLE WORKINGS BELOW WATER BODIES UNDERLIABLE PROTECTIVE MEASURES

18 DISASTERS DUE TO INUNDATION MAJOR CAUSES - CONTINUED HEAVY RAINFALL CHANGE OF WATER COURSE CONSTRICTION ON WATER COURSES IN ACCURATE SURVEY INCORRECT MINE PLANS INEFFECTIVE EVACUATION SYSTEM GEOLOGICAL DISTURBANCES WATER CHARGED STRATA

19 DISASTERS DUE TO INUNDATION PREVENTIVE MEASURES RECOMMENDATIONS OF COURTS OF ENQUIRY RECOMMENDATIONS OF NINETH SAFETY CONFERENCE DELINATION OF WATER BODIES AWARENESS PROGRAMMES INVOLVEMENT OF ALL CONCERNED DISEMINATION OF INFORMATIONS PROPER COMMUNICATION SYSTEM RAINFALL WARNING AND METEOROGICAL DATA IDENTIFY SIGNALS AND TAKE MEASURES

20 DISASTERS DUE TO INUNDATION PREVENTIVE MEASURES - CONTINUED BETTER DESIGN OF PROTECTIVE MEASURES ON ENGINEERING CONSIDERATIONS ADJUSTMENT OF HFL AS PER CHARGED RIVER CHANNEL R & D EFFORTS GEOPHISICAL METHODS FOR LOCATING U.G. WATER BODIES INFRASTRUCTURE FOR DRILLING OF ADVANCE BOREHOLES RISK ASSESSMENT & RISK MANAGEMENT RESPONSIBILITIES AT EACH STAGE DEFINED DYNAMIC AND VIBRANT MANAGEMENT

21 Thank You.. !


Download ppt "MINES SAFETY IN INDIA CONTROL OF ACCIDENTS AND DISASTERS IN 21 ST CENTURY S. N. PADHI FORMER DIRECTOR GENERAL OF MINES SAFETY GOVERNMENT OF INDIA."

Similar presentations


Ads by Google