Download presentation
Presentation is loading. Please wait.
Published bySherilyn Morton Modified over 9 years ago
1
Progress Energy Load Revision and Update for 2012 RA Plan Scott M. Deitche Project Engineer
2
Background Bartow plant is decommissioning on-site detention ponds and diverting process water to cooling water intake. Ultimately discharge to Old Tampa Bay. Summer 2013 Not a “new” discharge. Both atmospheric and unknown groundwater contributions.
3
former To be decommissioned
4
Allocation Request Progress Energy is requesting a surface discharge allocation of 3 tons/year
7
Reductions from repowering facility Repowering of the plant (online in 2009): average atmospheric reduction of 2,726 tons NOx from 2010-2011 For every 100 tons NOx in atmospheric discharge, 0.19% is deposited to the Bay as direct nitrogen loadings (ECT, TECO) Progress Energy reduced their direct Bay loadings by 5.18 tons from 2010-2011
8
Algae sampling - FWRI
9
Requesting concurrence from Consortium on allocating 3 tons/yr surface discharge in Old Tampa Bay for Progress Energy
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.