Download presentation
Presentation is loading. Please wait.
Published byEleanore Claribel Simpson Modified over 9 years ago
1
Leadership Summit Cheiko High, Deputy Commissioner, CDOT
2
Presentation Topics Chicago Department of Transportation Mission New Initiative Upcoming Opportunities
3
CDOT MISSION STATEMENT The Chicago Department of Transportation’s mission is to keep the city’s surface transportation networks and public way safe for users, environmentally sustainable, in a state of good repair and attractive, so that its diverse residents, businesses and guests all enjoy a variety of quality transportation options, regardless of ability or destination.
4
CDOT Electronic Invoice Document Management Issues check to the vendor
5
UPCOMING OPPORTUNITIES Construction Management - 41 st Street Pedestrian Bridge Construction Management - 43 rd Street Pedestrian Bridge Construction Management - Oakwood Blvd Bridge over Metra and Canadian National RR Construction Management - Irving Park Road Bridge over North Branch of Chicago River Program Manager Consultant Surface Transportation Studies CDOT Quality Assurance / Quality Control
9
Oakwood Blvd Bridge over Metra and CN RR Project Scope of Work The Oakwood Boulevard Bridge over the Metra and Canadian National Railroad is located within the historic Burnham Park. Originally built in 1926, both the superstructure and substructure will be replaced due to the deteriorated condition. The scope of work will include complete structure replacement, increasing the deck width and replicating the architectural façade. A new sidewalk, lighting and drainage will be installed to current standards. RFQ for Construction Management Due: June 9, 2015 Construction Start:Spring 2016 Funding Source:Federal / State Current Project Status: Phase II Design
12
Program Manager Consultant PMC: will provide engineering services to CDOT in support of its city- funded infrastructure improvement projects. This one contract will replace the eight (8) expiring construction management contracts for the CIC Program (Formally RCMA) and CCE Program. RFQ for Advertisement: TBD
13
Surface Transportation Planning Studies CDOT is responsible for conducting planning studies for all forms of surface transportation Consultants responding to the RFQ will perform tasks in one or more of the following categories: 1) public & intercity passenger planning, 2) roadway, traffic and parking planning and data collection, 3) bicycle and pedestrian planning, 4) freight and maritime planning, and 5) legislative and policy planning RFQ for Advertisement: TBD
14
CDOT Quality Assurance/Quality Control Scope: The management of the QA/QC Program for the Department includes managing and scheduling the physical material inspection on concrete, asphalt, structural steel, precast/prestressed concrete; monitoring and Independent Assurance program; developing and implementing training as needed; and the development of new specifications and forensic testing and investigation as required. RFQ for Advertisement: TBD
15
Stay In Touch Website www.chicagodot.org Twitter @CDOTNews Facebook facebook.com/CDOTNews
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.