Download presentation
Presentation is loading. Please wait.
Published byLindsay Byrd Modified over 9 years ago
1
Maintenance Demonstration Module 12: In Field Training Dennis Chestnut
2
Sponsors 2 District Department of Transportation U.S. Department of Transportation Federal Highway Administration The Low Impact Development Center, Inc. University of the District of Columbia Funding for this project was provided through a grant from the Federal Highway Administration, U.S. Department of Transportation
3
Contributors 3 The Low Impact Development Center, Inc. John Shorb Landscaping, Inc. Logo Groundwork Anacostia River, D.C.
4
Copyright 4 Unless otherwise noted, Low Impact Development Training, funded by DDOT & DDOE, is licensed under a Creative Commons Attribution-NonCommerical- ShareAlike 3.0 Unported License. Content provided by cited entities remains the property of those entities and may not be used without their explicit permission.
5
Overview Observe and participate in the maintenance of an actual rain garden 5 Photo Courtesy of Rasma Plato
6
Expected Outcomes Students will participate in routine maintenance of a bioretention cell. Maintenance will include: – Check berm – Check/clear drain – Check stone/overflow – Cut back perennials – Prune shrubs – Replace mulch 6
7
Activities Fill out paperwork and documentation for compliance Get utilities identified Attend a safety briefing Identify materials and maintenance needs Conduct maintenance Participate in disposal and closeout 7
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.