Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Similar presentations


Presentation on theme: "Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved."— Presentation transcript:

1 Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved

2 / Schedule PROG. & CONCEPT. PHASE Estimate & review Board Meeting SCHEMATIC DESIGN Estimate & review Board Meeting PAUSE for funding Oct Nov Dec Jan Feb Mar April May 20152014

3 PAUSE Complete DESIGN DEVELOPMENT Estimate & review CONSTRUCTION DOCS BID & NEGOTIATE CONSTRUCTION May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May 20172016 / Schedule

4 Support integrated science education: - experience the connections Support student-faculty research: - increase ability to involve more students - incorporate meaningful research opportunities into the science curriculum Enhance the strengths of facilities and programs: - reflect leadership in educating scientists Articulate the (compelling) vision in a robust way: - synergies across departments - continue to provide high standard of education - greater than the sum of its parts GOALS Carleton College Science Building Addition & Renovation January 26-29, 2015

5 “Carleton is renowned for its rigorous liberal arts curriculum and excellence in undergraduate teaching.”

6 “intentional contiguities”

7 Teaching & Research @ Carleton

8 Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf Modular Planning & Flexibility Classroom and Pre-Lab & Data Analysis S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis

9 Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis

10 Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf 40’ 30’ 40 + 30 + 40 = 110’ Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis 30 + 30 = 60’

11 Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf 40 + 30 + 40 = 110’ Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis 30 + 30 = 60’ 6’

12 Teaching & Research Suite 6,600 sf Modular Planning & Flexibility Offices Hulings Olin Commons

13 Modular Planning & Flexibility Commons

14 Mudd Exchange

15

16

17 El. -2’-6”. El. 0.

18

19

20

21

22 Modified Master Plan (MoMa)

23

24

25 E E E El. – 2’-6”’. El. 0’. El. - 3’.

26

27

28

29

30

31 Cost

32 Estimate of Total Project Cost: Budget: $70,000,000 MoMa: $79,750,000 MuddEx: $95,800,000

33 MoMa:MuddEx