Download presentation
Presentation is loading. Please wait.
Published byVictoria Hutchinson Modified over 9 years ago
1
OMA and Interoperability Testing Gilbert Buty Chairman, Interoperability Working Group, OMA www.openmobilealliance.org iMobicon, Seoul, Korea, August 22, 2007
2
2 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Agenda OMA and Interoperability (IOP) IOP Working Group Activities IOP Process OMA TestFest Benefits OMA Enablers (Current and Approved) OMA Test Tools OMA TestFests in Detail TestFest Achievements
3
3 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA and Interoperability Fast paced innovation and development have resulted in increased demand for interoperability and inter-working in a multi-party environment OMA has a commitment to increase the number of Enabler specifications in which implementations are tested OMA TestFests - Verification of specification interoperability, stability and quality OMA is committed to reducing the time to market with open specifications which are tested for quality through its IOP program
4
4 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. IOP Working Group Activities The IOP Working Group objectives are to ensure the quality and interoperability of OMA specifications and the resulting implementations Main activities: Maintenance of the required processes, policies and test programs Development and Approval of Test Specifications Enabler Test Specification (ETS) Enabler Validation Plan (EVP) Enabler Implementation Conformance Statement (EICS) Organization of OMA test events (TestFests) Review and Analyze TestFest results reported
5
5 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No
6
6 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No TWG prepares the Test requirements To be validated by IOP
7
7 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No IOP starts to work on test specifications ASAP to foster the process
8
8 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When ETS/EVP sufficiently developed, IOP may decide to start prototype testing
9
9 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When ETS/EVP approved by TP, enabler goes to TestFests or Bilateral Testing events
10
10 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No Results from testing are fed back to IOP to improve quality of specifications
11
11 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When enough test Results are collected, IOP recommends “Approved” status
12
12 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFest Benefit to Members By participating in an OMA TestFest, companies can: Expand their market opportunities by ensuring that their products are interoperable with other industry implementations of OMA specifications Avoid costs and delays in product deployments by resolving specification issues before deployment Participate in the identification and resolution of technical issues to help bring new products and services to market much quicker
13
13 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Status of Current Enablers in IOP On the road towards the “Approved” Status IMPS 1.1 IMPS 1.2.1 IMPS 1.3 MMS 1.1 MMS 1.2 OCSP 1.0 PoC 1.0 Presence 1.0 STI 1.0 SUPL 1.0 XDM 1.0 “Approved” Status Enablers Browsing 2.1 Browsing 2.2 Charging 1.0 CSCSF 1.0 DS 1.1.2 DS 1.2 DM 1.1.2 DM 1.2 DRM 1.0 DRM 2.0 DL 1.0 FUMO 1.0 Browsing 2.3 BCAST 1.0 CP 1.1 DL 2.0 DRM 2.1 EMN 1.0 GS CSI 1.0 MMS 1.3 Push 2.1
14
14 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Test Tools IOP program also facilitates enabler test tools No longer mandates test tools as entry criteria to OMA TestFests Although continuing to work with test tool industry to develop TTCN-3-based Conformance Test Cases Plan to make TTCN-3 Code available Test Tool Industry will incorporate TTCN-3 code into their tools Members can license tool from industry Self test of implementations in own lab and Results log file can be made available to customers
15
15 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Available OMA Test Tools DM v1.2 SCTS for DM v1.2 – Open Source tool available from SourceForge (Project: OMA- SCTS) DRM v2.0 CTT from CoreMedia (Available to License) BCAST v1.0 TTCN-3 Test Cases currently being developed in a pilot project to help make OMA tools available throughout the industry. Test Cases expected to be available in Oct 2007
16
16 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFests in Detail OMA interoperability events Held 4 or 5 times per year Between 80 and 140 engineers attending Test about 6 to 8 different enablers 40 to 60 test teams 6 or 7 day event
17
17 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFests in Detail Provides confidential neutral environment Allows inter-working between competitors Provides complete mobile infrastructure 2G and 3G networks (GSM, CDMA, W-CDMA) WAP Gateway, PPG, SMS Centre, IMS System Formal testing against Test Specifications Results reported anonymously to IOP WG Allows assessment of enabler for approval Problems and issues fed back into OMA process through neutral reporting system
18
18 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFest Achievements 21 Test Events held to so far Over 1100 implementations tested 144 in 1 st Year (11/02 – 10/03 – 5 events) 178 in 2 nd Year (11/03 – 10/04 – 4 events) 263 in 3 rd Year (11/04 – 10/05 – 4 events) 429 in 4 th Year (11/05 – 10/06 – 5 events) 148 so far in Year 5. Over 500 problems and issues raised to OMA All related to Specifications Implementation errors dealt with by participants
19
19 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Opportunities in 2007 & 2008 Continuing to Plan 5 TestFest per annum 3 more events in 2007 Over 20 new Candidate Enablers will start Testing in 2008 BCAST v1.0, DRM 2.1 already testing at September 2007 events Other Opportunities to be explored
20
20 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. TestFest Dates/Hosts in 2007/2008 7 th - 14 th September 2007 Vodafone, Düsseldorf All Enablers except BCAST 21 st – 28 th September 2007 Vodafone, Düsseldorf BCAST Only Event 9 th - 16 th November 2007 Mobitel & Sintesio, Bled, Slovenia 2008 Dates available on OMA website Locations still being planned
21
21 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Permanent TestFest Sites OMA’s Objective To appoint a number of sites ready to host TF Help OMA to improve it’s ability to plan TestFests using both volunteer and permanent sites Criteria for selection Commercial Terms, Technical Ability, Organizational Capabilities 4 sites already selected China Mobile (Beijing), ITT (Montreal), TeliaSonera (Helsinki), Vodafone (Düsseldorf) Opportunities for other companies to become a Permanent TestFest Site
22
22 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Product Listing Recognition for companies participating in TestFests Ability to list products and the enablers they support Must include general TestFest results Can optionally list: Functionality of Product (EICS) Company’s Results achieved at TestFest (ITR) Web-site open to public access in June 2006 http://product.openmobilealliance.org/ 191 Products listed from 35 Companies already listed
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.