Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas
2
Desert Sky Wind Farm January 2004 Wind Power’s Place Important part of mix Free fuel No emissions management Maturing technology Cost competitive Predictable at proven sites Low risk at proven sites Fastest growing source Future looks bright
3
Desert Sky Wind Farm January 2004 Wind Growth in U.S., Texas 1,687 Megawatts (MW) added in 2003 204 MW in Texas 410 MW added in 2002 1,696 MW added in 2001 915 MW in Texas 28% average annual expansion in U.S. capacity over the last five years Total installed capacity: U.S. - 6,374 MW in 32 states Texas – 1,293 MW Texas ranks 2 nd in U.S. Source: American Wind Energy Association
4
Desert Sky Wind Farm January 2004 Wind Industry Drivers Competitive cost Long-term price stability Environmental attributes Federal wind tax credit equaling 1.7 cents per KWH Texas Senate Bill 7 (electric industry restructuring) Rural development Ease of permitting
5
Desert Sky Wind Farm January 2004 Senate Bill 7 Details Senate Bill 7 (1999 electric restructuring legislation) included renewable portfolio standard (RPS) Requires additional 2,000 megawatts (MW) of capacity in state of Texas by Jan. 1, 2009 (beyond 880 MW installed at the time) Under SB7, cumulative installed renewable capacity in Texas must grow to: 1,280 MW (an additional 400 MW) by Jan. 1, 2003 1,730 MW (an additional 450 MW) by Jan. 1, 2005 2,280 MW (an additional 550 MW) by Jan. 1, 2007 2,880 MW (an additional 600 MW) by Jan. 1, 2009 2,880 MW equates to about 3% of TX electricity in 2009 Installed wind capacity in TX as of Jan. 1, 2004 was 1,293 MW
6
Desert Sky Wind Farm January 2004 Texas Wind Projects vs. Load Centers Dallas- Ft. Worth Austin San Antonio Houston Rio Grande Valley Corpus Christi
7
Desert Sky Wind Farm January 2004 Wind Energy Potential In Billions of KWH
8
Desert Sky Wind Farm January 2004 Declining Cost of Wind $’s Per MWH Does not include Federal wind tax credit; reduces cost 1 cent / kWh or $10 / mWh
9
Desert Sky Wind Farm January 2004 Utility Interest in Wind Energy Rapidly declining cost Rapidly growing industry Adds to fuel source diversity Environmental benefits High levels of public support Legislative or regulatory mandates Abundant resources in U.S.
10
Desert Sky Wind Farm January 2004 Wind Site Considerations Willing landowners and public Windy site 1-5 years of data Mesa Few trees Lots of land -- rural Environmental studies Endangered species Avoid bird flyways Archaeology studies Transmission network
11
Desert Sky Wind Farm January 2004 Desert Sky Wind Farm GE Wind Energy built project; performs O&M CPS buying power AEP owns facility
12
Desert Sky Wind Farm January 2004 Desert Sky Details 160 megawatts – 107 turbines at 1.5 MW each Located on Indian Mesa near Iraan and Bakersfield, TX Project covers 15 sq. miles Enron Wind (now GE Wind Energy) developed and constructed the project; now performing O&M AEP purchased project after completion in 2001 -- $175 million investment Power is sold to City Public Service of San Antonio under long-term power supply agreements
13
Desert Sky Wind Farm January 2004 GE Wind Energy 1.5 -- Operation GE Wind Energy 1.5 -- Operation Operates in 8-56 MPH wind Onboard weather station Electronically controlled Yaw control facing wind Variable speed via blade pitch Operates at 11-20 RPM Desert Sky a 107-unit power plant (each turbine is self-contained unit)
14
Desert Sky Wind Farm January 2004 Tower and Turbine Profile GE Wind Energy 1.5 turbines Each rated at 1.5 megawatts (1,500 kilowatts) 328 ft. base to blade tip Foundation 18 to 26 ft. deep Tower in three sections 163.3 tons total
15
Desert Sky Wind Farm January 2004 Wide Sweep of Turbine Blades 231 ft. 211 ft. Each blade 112 ft. long 231 ft. blade tip to tip Span greater than 747 airliner
16
Desert Sky Wind Farm January 2004 Wind Turbine Units Nacelle 56 tons Tower 3 sections Blade 112’ long Workers
17
Desert Sky Wind Farm January 2004 Nacelle Nacelle (nuh-cell) shown before assembly Houses generator and gearbox Resembles large travel trailer Weighs 56 tons
18
Desert Sky Wind Farm January 2004 Inside Nacelle
19
Desert Sky Wind Farm January 2004 Desert Sky Map Dallas, 400 Miles San Antonio, 266 Miles Odessa, 90 Miles Ft. Stockton, 50 miles McCamey, 20 Miles Iraan, 12 Miles Desert Sky
20
Desert Sky Wind Farm January 2004 More Information AWEA.ORG American Wind Energy Association AEP.COM American Electric Power CITYPUBLICSERVICE.COM City Public Service, San Antonio GEWIND.COM GE Wind Energy DESERTSKYWIND.COM Desert Sky Wind Farm