Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date: 12.06.2012.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date: 12.06.2012."— Presentation transcript:

1 Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date: 12.06.2012

2 Federal Aviation Administration Agenda DTAP Development Status: -DTAP Development/Milestone Deliveries -Trials Schedule Update On-Going / Completed Trials Activities Status: -DTAP Certification -MEM Training & Procedures -Trials Metrics Development Trials CSP Service Update EWR Trials – Schedule/Planning Discussion

3 Federal Aviation Administration DTAP Milestone Deliveries SE2020 Deliverables / DTAP Development: -Limited Trials Build undergoing Functional Testing @ WJHTC -Fixes previous HIGH/MED-HIGH level PTRs -Installed @ MEM ATCT 12/3 for continued Functional /FDX-UPS Testing -CAF, UM80, UM79 (Non INT), AOC DM (non SI Doc compliant) -Full Trials Build scheduled estimated for delivery to the WJHTC on Jan 22 -Initial UM79 requirement included (ERAM FIR Boundary limits) -UM83 and discovered ‘out of scope’ minimum Trials requirements included -Additional requirements from testing included -Represents ‘full fleet’ Trials functionality

4 Federal Aviation Administration MEM Limited Ops Trials (~ 3 Ops/Day - 2 Weeks) Nov 27: -Limited Ops Build installed on WJHTC Data Comm lab DTAP -Limited Ops Build installed on designated Training DTAP3 Dec 3-14 (WJHTC & MEM Functional/Pre-SAT Testing) -Limited Ops Build installed on MEM ATCT DTAP -Limited Ops Build Functional Testing @ MEM ATCT (Bench and FDX/UPS aircraft avionics planned) -Limited Ops Build WJHTC Functional Test summary review Dec 17-20 Boeing / Airbus Bench Testing Window Dec 24-Jan 1 (Holiday Break) Jan 2-7: - OT2 @ MEM (Jan 2) -Limited MEM ATC Training (DTAP3 Training machine) -Formal MEM SAT (Jan 3-4) -Trials Start Checkpoint – Go/No Go (Jan 7) Jan 7-21: Buffer Jan 22 – TRIALS START (Jan 14 Target Start Option)

5 Federal Aviation Administration MEM Limited Ops Trials Timeline NOV DEC JAN Holiday Break 12/24 – 1/2 OT2, ATC Training, SAT @ MEM 1/2 – 1/7 BUFFER 1/7 – 1/21 FEB Limited Ops Trials Window (TBD Ops/Day – 2 Weeks) 1/22 – 2/10 Additional Functional Testing BUFFER 12/14 – 12/24 Functional Testing @ WJHTC & MEM 11/27 – 12/14

6 Federal Aviation Administration MEM Full Functionality Trials Ops Dec 10-17: -Final DTAP SE2020 Contract Build 6 Requirements/Delivery Date Implementation Jan 22-Feb 6: -Full Functionality Build installed on WJHTC DTAP – Functional Testing Window -FDX Pilot Training 30 Day Notice Given (FF Build Accepted for Trial Ops – 2/4) Jan 29-Feb 8: -Conduct OT3 @ MEM (1/29) -Conduct Formal ATC DTAP Training @ MEM Feb 10-Feb 15: -END OF LIMITED OPS TRIALS (2/10) -Install Full Functionality Build on MEM DTAP (2/11) -Pre-SAT, Functional Testing Activities -FDX GOC Training 2 Week Notice Given Feb 18-22: -Formal Full Functionality Build SAT @ MEM -Full Trials Go/No-Go Checkpoint (2/22) March 4: FULL FUNCTIONALITY TRIALS START ~50 flights (2/25 Target Start Option) -Trials Procedures Shake Out

7 Federal Aviation Administration MEM Full Functionality 24x7 Ops Trials April 4 MEM Full Fleet Trials Starts 120 Day Trials Review Checkpoint Timer

8 Federal Aviation Administration MEM Full Ops Trials Timeline JAN FEBMAR SAT @ MEM, Trials FF GO Checkpoint 2/18 – 2/22 APR Full Functionality 24x7 Trials Ops 4/4 + 120 Days End of Limited Ops Trials, MEM DTAP Upgrade 2/10 – 2/15 Functional Testing @ WJHTC 1/22 – 2/6 OT3 & ATC Training @ MEM 1/29 – 2/8 Full Functionality Trials Start, Procedures Shake Out (~50 DCL Flights) 3/4 – 4/4 Buffer FDX Pilot Training 30 Day Notice – 2/4 FDX GOC Training 14 Day Notice – 2/15

9 Federal Aviation Administration Tech Ops DTAP Certification Certification on Track to enable Trials start: -Tech Ops reps completed draft DTAP Certification procedures at the WJHTC lab on 10/10 & 11 -Procedures / FAM Training complete -AJW-13 to propagate Notice to field / trials sites FSEP office notified FTI that Cert / FAM procedures are satisfactory: -Allows FSEP DTAP log entry & FTI check-off Train MEM Tech Ops Scheduled for December 17: -Trained MEM Tech Ops reps credentialed via District Mgr.

10 Federal Aviation Administration MEM Training and Procedures MEM Training and SAT Procedures complete: -Limited MEM DTAP Training scheduled for Jan 2-7 2013 -Full MEM DTAP Training planned for Jan 29 – Feb 8 -MEM Trials SAT draft released for internal review 12/3 FDX Training: -FDX AOC/Dispatch training (2 weeks advance notice req) -FDX Pilot training (30 day advance notice req) -FAA CMO LOA (2 weeks advance notice req)

11 Federal Aviation Administration Trials Metrics Development DTAP log file analysis underway: -Thales to provide tools for decoding/presenting DTAP log file data -Summary Trials data analysis planned -DCIT Plenary Update Independent Safety Assessment Office (AJI-321) planning Trials evaluation and analysis: -Trials team to provide ISA with Trials procedures, metrics and test plans

12 Federal Aviation Administration Trials CSP Service Update ARINC/SITA Current Agreements: -ARINC Trials service being extended from current 12/31 POP end -Additional ARINC extensions available if required -SITA service contract extended on month x month basis

13 Federal Aviation Administration EWR Trials Schedule/Planning Verify limited Trials start @ EWR can commence before the MEM 120 day review checkpoint EWR Trials Start in April is a challenge for DCP: -EWR ATC accepts final MEM DTAP functionality for initial Trials implementation (Dec, DCIT Ops Mgt) -EWR CHI functionality updated utilizing a TBD DTAP release -EWR May-Sept Implementation Freeze Out EWR Trials Implementation Activities Underway: -Meeting at facility with ATC and Tech Ops Mgt (12/17) -FTI Telco/Network Connectivity Order Initiated -DTAP ZNY HADDS/OARS interface configuration Initiated -HADDS, FDIO Test NCP development Initiated -Equipment Implementation goal in March -Initial operators include UAL, FDX, UPS, LFT

14 Federal Aviation Administration Questions ? KMEM


Download ppt "Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date: 12.06.2012."