NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A =5x10 -8 We are aiming to 10% measurement.
4
Proposal was written in 1997 Spinka I Committee’ technical review in 1998 Spinka II Committee’s technical review in 2000 Project Management Plan signed in 2001 Spinka III technical review in November 2002. 2004 Commissioning run - beam line, experiment except of LH2 target are ready The latest DOE review was on Oct-2004 Project background
5
Organizational Chart Bill Louis Jack Shlachter Doug Fulton TBA Hersman/UNH Gentile/NIST
6
Organizational chart for the construction of the experiment and the beam line Project Construction (Cont. from Fig. 3.1) S. Penttila / LANL Beam Line Coordinator S. Penttila / LANL Beam Line Coordinator S. Wilburn / LANL Experiment Coordinator S. Wilburn / LANL Experiment Coordinator S. Page / Manitoba Beam Monitors S. Page / Manitoba Beam Monitors S. Wilburn / LANL Cave S. Wilburn / LANL Cave S. Wilburn / LANL Spin Flipper S. Wilburn / LANL Spin Flipper R. Carlini / TJNAF Guide Field R. Carlini / TJNAF Guide Field K. Coulter / Michigan T. Smith / NIST 3 He Polarizer K. Coulter / Michigan T. Smith / NIST 3 He Polarizer S. Wilburn / LANL DAQ S. Wilburn / LANL DAQ M. Snow / Indiana Hydrogen Target M. Snow / Indiana Hydrogen Target M. Snow / Indiana Detector M. Snow / Indiana Detector S. Wilburn / LANL ER-2 Utilities S. Wilburn / LANL ER-2 Utilities J. David Bowman / LANL Test & Commission J. David Bowman / LANL In-Pile J. David Bowman / LANL In-Pile S. Penttila / LANL Guide S. Penttila / LANL Guide S. Wilburn / LANL ER-1 Utilities S. Wilburn / LANL ER-1 Utilities S. Penttila / LANL Shutter S. Penttila / LANL Shutter S. Penttila / LANL Integrated Shielding S. Penttila / LANL Integrated Shielding M. Leuschner / UNH Chopper M. Leuschner / UNH Chopper TBD / LANL (LANSCE) Integrated Beam Line Coordinator
7
The NPDGamma Collaboration Collaborating institutes; Dayton, Dubna, Hamilton, IU, Jlab, KEK, LANL, NIST, ORNL, TRIUMF, UCB, U. Manitoba, UM, UNH, UT, … Sponsors: DOE, NSF, NSERC, LANL, KEK, Institutes
8
Flow chart for the shed and ER2 LH2 target effort
9
Issues for this review but not limited to LH2 target vent stack at ER2. Ventilation line for the GHS enclosure at ER2. LH2 target vent stack in MPF-35, shed. Ventilation duct for the tent in MPF-35.
10
Working in the “new” Laboratory To have the approved LH2 target at Lab at present times is a great challenge for the NPDGamma collaboration and LANL personnel. We need all available help and support to complete successfully this project. Project schedule: First fully test the target system in MPF-35. Then mount the target to FP12 and test it. Get approvals and be ready for beam in late summer 2005. We need about 1-2 mo beam on the target in 2005. Vent lines: In and outside ER2 the pipes should be in place prior the beam.
11
10%-Design Review of the FP-12 Liquid Hydrogen Target Vent Systems Agenda: 9:00Opening words Bowman 9:10Committee ’ s charge Hurd/Knudson 9:20 NPDGamma experiment; status, plans, schedules Penttila 9:35Discussion 9:45LH2 target system and its safety features Snow 10:05 Discussion 10:20Sizing of the vent/relief lines Nann 10:50Discussion 11:15 Sizing of the vent/relief lines from 1 st principles Jankowski 11:25Discussion 11:3510%-design of the relief/vent lines in shed and in ER2 Etuk/Penttila 12:05Discussion 12:30Box lunch followed by touring MPF-35 and ER2 1:30 Results of testing CF joints Snow 1:45 Discussion 2:00 Ventilation of gas handling system in shed and in ER2 Penttila 2:30 Discussion 2:50 Discussion to close open issues Knudson 4:50 Closing