Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP meeting Lakatamia, 10-15 June 2014 Veronika Valentar.

Similar presentations


Presentation on theme: "Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP meeting Lakatamia, 10-15 June 2014 Veronika Valentar."— Presentation transcript:

1 Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites- progress 5th PP meeting Lakatamia, 10-15 June 2014 Veronika Valentar

2 Green Partnerships Local Partnerships for Greener Cities and Regions MARIBOR KOPRIVNICA- KRIŽEVCI RHETYMNO LAKATAMIA PODGORICA LA SPEZIA VERDON, MEAILLES GRANOLLERS ALENTEJO -ENERGY EFFICIENCY BUILDINGS -ENERGY SAVING -WOOD BIOMASS -SOLAR ENERGY -BIOGASS -WATER ENERGY -FEASIBILITY STUDIES -FINANCING -PUBLIC LIGHTNING -BIOCLIMATIC AREAS -WATER PUMPING SARAJEVO INNOVATIVE APPROACH, CONCRETE RESULTS, FUTURE INVESTMENTS! WHAT ARE WE DOING? MANZA

3 Lakatamia, 10-15 June 2014 3 PILOTS 1-2- MARIBOR MARIBOR 1: Biomass heating boilers for public buildings: -2 municipalities ( 1 new, 1 optimised) -The main obstacle: european, national, local elections, no funding MARIBOR 2: Energy efficiency in cultural heritage building: -Energy identity card in progress -Development of scenarios not in progres yet The main obstacle: communication between stakeholders

4 Lakatamia, 10-15 June 2014 4 ALBANIA -Problem: Waste management, water scarcity, pollution -Focus: young generations -Actions: Training courses: -How many training courses? -Any training materials developed? -Center for environmental and Green Energy? PILOT 3- MANZA

5 Lakatamia, 10-15 June 2014 5 BOSNIA AND HERCEGOVINA SARAJEVO 1: CO2 emmisions Actions: Questionnaires Result: Feasibility study Q1: how useful are project materials: e.g. funding, awareness etc. SARAJEVO 2: Eco schools Actions: awareness Q2: any materials in your national language? PILOTS 4-5: SARAJEVO

6 Lakatamia, 10-15 June 2014 6 LAKATAMIA: Action: -Investment to the biomass boiler -Feasibility study about biomass supply Obstacle: modification of the project; Q1: biomass supply? PILOT 6- LAKATAMIA

7 Lakatamia, 10-15 June 2014 7 1.PARC NATURAL REGIONAL DU VERDON Action: -Territorial biogas project Q1: Is this project realizable in the period 2014- 2020? 2. HYDROPOWER PLANT ON AN IRRIGATION CHANEL Q2: How far are you? PILOTS 7-8- FRANCE

8 Lakatamia, 10-15 June 2014 8 FEASIBILITY STUDIES 1.PUBLIC LIGHTNING 2.WATER TREATEMENT AND PUMPING 3.BIOCLIMATIC DESIGN OF OPEN SPACE Q1: Have you already selected, suimulated and designed target places in old town of Rhetymno? Which criteria did you use by selection of target? PILOTS 9-11- GREECE

9 Lakatamia, 10-15 June 2014 9 FEASIBILITY STUDIES 1.Possibilities for biogas and biomass producers: technical solutions and investment proposals Q1: Funding possibilities since CRO is a member of EU? 2. Photovoltaic panels at the public building Q2: Development of a GIS model for data analysis and monitoring RES and energy efficiency? 3. Energy efficiency in public school building- technical solution and investment proposal PILOTS 12-15 CROATIA

10 Lakatamia, 10-15 June 2014 10 The largest network of decision makers 1.Strengtheening local public –private partnerships supporting energy efficiency 2. Raising awareness and implementing energy efficiency upgrading in schools 3. Mobilisation funds for investment in sustainable energy at local level 4. Training civil society organizations in energy certification Q1: Nr. Of concrete locations (feasibility studies, energy audits, emission inventories) involved? Q2: Environmental and energy centre? Q3: Web platform tool for training course? PILOTS 16-19- ITALY

11 Lakatamia, 10-15 June 2014 11 Feasibility studies about the use of hydro power Case: Jezerstica Q1: Nr. Of events? Any new obstacles identified? PILOT 20-MONTE NEGRO

12 Lakatamia, 10-15 June 2014 12 1.Starting up of a “Championship for energy saving” in public buildings 2.Installation of remote control systems for energy management in public buildings participating in “championship” 3.Technical and economic feasibility study on the installation of trigeneration in the form of selfconsumption and provision of energy services to Granollers Q1: does remote controll enable feedback on PILOTS 21-23 CATALONIA

13 Lakatamia, 10-15 June 2014 13 1.Personalised trainings for SME-s 2.Public lightning energy efficiency 3.Network for electricity efficiency 4.LEDs for traffic lights 5.Zero emmisions communities Q:The progress of work, investments? PILOTS 24-29 PORTUGAL

14 Lakatamia, 10-15 June 2014 14 1st slide - Title of the Pilot case, which technical-non technical thematic area - LAG related to the specific pilot case (members) - Photo representative to the pilot project/area In addition, we propose a graphic sign for the country flag+partner’s logo - Start-End date of pilot case implementation 2nd slide Starting point – which was the identified need - reasons for change that led to the specific pilot action Solution proposed Cooperation established? Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity building) 3rd slide Main barriers identified during the implementation of the project Benefits for the community Lessons learnt 4th slide which are the next steps by the end of the project so that you will achieve the aim of the pilot case as described in the Application Form (e.g. investment realized, investment proposal prepared, technical solution prepared etc.) POSTERS

15 Lakatamia, 10-15 June 2014 15 2nd slide - Starting point – which was the identified need - reasons for change that led to the specific pilot action - Solution proposed - Cooperation established? - Targets set (i.e. energy savings, people reached, investments challenged, new jobs etc) - Key actions taken so far (i.e. to solve the problem “technically”, soft measures to raise awareness/improve habits, capacity

16 Lakatamia, 10-15 June 2014 16 3rd slide - Main barriers identified during the implementation of the project - Benefits for the community - Lessons learnt

17 Lakatamia, 10-15 June 2014 17 4th slide which are the next steps by the end of the project so that you will achieve the aim of the pilot case as described in the Application Form (e.g. investment realized, investment proposal prepared, technical solution prepared etc.)

18 Lakatamia, 10-15 June 2014 18 If you can‘t explain simply, you don‘t understand it well enough! (Albert Einstein)