STUDY ON REPAIR AND MAINTENANCE OF LPG STORAGE BULLET PROJECT GUIDES TEAM MEMBERS INTERNAL GUIDE Mr.S.KANNAN, M.E., (Ph.D), ASSOCIATE PROFESSOR, AVC COLLEGE OF ENGG. EXTERNAL GUIDE Mr.S.DEEPAK,B.Tech, (MAINT/PLANNING-PROJECTS), CPCL PANNANGUDI. M.ANAND (80107144005) P.SENTHILKUMAR (80107144045) S.SUDHARSANAN (80107144048) G.PRABHU (80107144504) FINAL MECHANICAL 3 September 20152
3
OBJECTIVE To study about the Maintenance and Repair of the LPG bullets in Chennai Petroleum Corporation Ltd (CPCL). To make recommendations for the recurring problem. 3 September 20153
4
BULLET Bullet is a LPG storage unit used in the oil refinery Industries. It is look like in the shape of diesel or petrol tankers in the lorries. 3 September 20154
5
LPG STORAGE BULLET 3 September 20155
6
BULLET SPECIFICATIONS Diameter: 4m Length: 16m Wall Thickness: 28 mm to 32 mm Material: SA 516 Gr70(high quality carbon steel) Design code: ASME sec 8 div1-1989 Operating temp: 45 0 c Hydrostatic pressure: 22.5 Kg/cm 2 3 September 20156
7
2D VIEW OF LPG STORAGE BULLET 3 September 20157
8
BULLET DIAGRAMS 3 September 20158
9
SECTIONAL VIEW OF THE BULLET 3 September 20159
10
BULLET MATERIAL MATERIAL SA 516 GR 70 It is a high quality carbon steel plate for boiler and pressure vessel. Carbon:0.27-0.31% Manganese:0.79-1.3% Phosphorous:0.035%max Sulphur:0.035%max Silicon:0.13-0.45% 3 September 201510
11
Maintenance methodology (Existing) De commissioning Erection of scaffolding Cleaning inside the bullet for NDT tests Ultrasonic Flaw Detection Testing Ultrasonic thickness measurement Hardness testing Spot Radiography tests Cleaning outside the bullet for NDT tests Nozzle replacement Stress relieving process Hydro testing of bullets Box up the nozzles 3 September 201511
12
After studying about the existing maintenance methodology the frequently faced problems were found out. 3 September 201512
13
PROBLEMS FACED: It was observed that shell external, shell nozzles, nozzles flanges were found heavily corroded. Therefore nozzles and nozzle flanges were replaced with approval from Chief controller of Explosives, Nagpur. Maintenance cost was increased due to replacement of nozzles. Downtime is also increased. 3 September 201513
14
RECOMMENDATION Insulation to be provided and aluminium sheet to be covered over the insulation (or) to reduce the external corrosion around the bullet every year it should be painted. 3 September 201514
15
3 September 201515
16
3 September 201516
17
3 September 201517
18
Existing maintenance cost For 40 years (the life time of the plant) Total maintenance action – 8 times Total maintenance cost – 2 crores i.e.8times X 25 lakhs = 2 crores. 3 September 201518
19
According to our recommendations Total cost for insulation material with Aluminium cover plate Rs.100000. Total cost for water sealing compounds with shed arrangement is Rs.20000. (including labour cost) 3 September 201519
20
LIFE TIME OF THE BULLET AND SAVING COST NOZZLES. By providing the insulation with Aluminium cover plate we can increase the life from 5 years to 8 years. The capacity of the plant is 40 years. i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time) for 5 times X 8 years = 1.25 crores. (25 lakhs per time) So that the maintenance cost is reduced up to 75 lakhs 3 September 201520
21
For providing Aluminium plate covering with insulation 3 September 201521
22
By providing the water sealing compounds with the shed type arrangement we can increase the life time of the nozzle form 5 to 6 years. The capacity of the plant is 40 years. i.e. for 8 times X 5 years = 2 crores. (25 lakhs per time) for 7 times X 8 years = 1.75 crores. (25 lakhs per time) So that the maintenance cost is reduced up to 25 lakhs (approximately.) 3 September 201522
23
For providing water sealing compound 3 September 201523
24
ADVANTAGES Maintenance cost is reduced. Life time of the nozzle is increased. Downtime is also decreased. It is one of the method to avoid the major LPG tank accident 3 September 201524