AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June 20111.

Similar presentations


Presentation on theme: "AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June 20111."— Presentation transcript:

1 AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June 20111

2 LYCCA test and MBS A single FEE64 card with mezzanine was mounted on the central aluminium support and along with top cooling plate was plugged via the LYCCA adaptors into a LYCCA silicon detector in the LYCCA chamber at GSI. The cooling was provided by a fan and aluminium cooling blocks. The MBS interface was used, successfully, to integrate data with the MBS system. 13th June 20112

3 Production of FEE64 Electronics testing is proceeding. Cooling pads for the AIDA modules are being manufactured. A modified set of pads has been ordered. Mechanical parts for the modules are in stock. 13th June 20113

4 Preparation for the October test 6 th June, meeting to discuss installation of a system inT4 that will be shipped to GSI for the October experiment. Designing the MACB to integrate the 12 FEE64 cards ( 6 modules ) into a system. Problem with HDMI connection. 13th June 20114