Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.

Similar presentations


Presentation on theme: "Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout."— Presentation transcript:

1 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout

2 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 2 Eddicam

3 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 3 Eddicam CCD baseline characteristics –Format: 740 x 2900 pixels –Pixel size: 27 x 27 µm 2 –Chip size: 20 x 80 mm 2 –Full well capacity: 1.6 Me - –Minimum line readout time: 13 µs –Frame transfer time: 20 ms –Readout noise: 10 - 15 e - at 0.5 MHz –Operational temperature:-80 / -100 C

4 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 4 Eddicam Planet finding CCD layout Asteroseismology layout Filters Frame transfer covers

5 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 5 Eddicam CCD array preliminary design –16 + 4 CCDs covering the full FOV –CCDs working in frame transfer mode for asteroseismology (short integrations on bright stars) –CCDs working in full frame mode for planet finding (long integrations on weaker stars)

6 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 6 Eddicam CCD mosaic proposed by Marconi: –20 CCDs on individual INVAR packages –Each CCD individually mounted on a large INVAR baseplate –All CCDs within ±10 µm from the baseplate: no individual focussing required –Flatness variation < 3 µm from +20 to -100 C –Butting gap around 500 µm

7 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 7 Eddicam Prototype of CCD array proposed by Marconi

8 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 8 Eddicam Detail of individual CCD chip package

9 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 9 Eddicam EddiCam Camera Unit Preliminary Layout –CCD Support Assembly –CCD Mask Assembly –Calibration Assembly –FEE Box –Support Structure

10 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 10 Eddicam Eddicam Preliminary Layout

11 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 11 Eddicam CCD Support Assy Calibration Assy FEE Box Support Structure Assy CCD Mask Assy Eddicam Explode View

12 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 12 Eddicam CCD Support Assembly Primary Missions: Provide an accurate and stable support to the CCD Mosaic Provide an effective thermal path between CCD´s and the heat sink I/F Provide a cold trap for decontamination purpose Bottom Face ViewTop Face View

13 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 13 Eddicam Cold Trap CCD MosaicInvar Plate Cold Ring Flexible Thermal Links CCD Support Assy Explode view

14 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 14 Eddicam CCD Support Assembly Hot Points: Required flatness of the mosaic plane Required alignment between CCD´s Maximum butting gap (design based on three side buttable CCD) Thermal stability control (  0.1K/h): -Completely passive (by mean of thermal equilibrium and thermal inertia) -Thermally controlled by mean of sensors/heaters Flexible thermal links: Copper/Aluminium straps Carbon Fibre straps(?) Micro heat pipes Thermal Switches for the baking mode(?): CCD Mosaic cooling path disconnection could be required

15 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 15 Eddicam CCD Mask Assy Missions: Change between planet finding and asteroseismology operational modes CCD Mask Assy Hot Points: Single or Multiple actuation: driver for actuator concept Mask-CCD´s gap: potential straylight source baking mode If lubrication required: cleanliness control problem

16 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 16 Eddicam CCD Mask Assy Mechanical Concepts: Slidding Concept Cam/Rotating Concept

17 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 17 Eddicam Calibration Assy Missions: Provide dust protection during the AIV and Launch Phases Provide a flat field light on the CCD plane for calibration Calibration Assy Hot Points: Single or Multiple actuation: Driver for actuator concept If lubrication required: Cleanliness control Straylight If spectral information required: Devices included in this assy High Impact on preliminary configuration concept

18 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 18 Eddicam FEE Box: Provide mechanical support to each preamps boards Provide a dedicate thermal control system for heat dissipation Provide protection against radiation FEE Box Hot Points: Mass and Envelope Accessibility and integration with CCD´s Thermal conductivity between electrical connections Thermal isolation from CCD´s Support and cooling design

19 Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 19 Eddicam Support Structure Assy Missions: Provide a stiff and stable connection to the telescope Provide support to the different elements of the camera unit Provide support to the electrical and thermal devices from the telescope Provide allocation to the refocusing system(?) Support Structure Assy Hot Points: High stable structure Heat pipes and harness path from telescope to the unit Focusing system: high impact on preliminary design