Lake Washington Road project
Prepared for: Mr. Fran Lemieux Shaw Group
2
Client’s Project Goals
Shaw Group Development Corp. Design & cpnstruct xxx mi. municipal road Design & construct yy sf commercial office building MS Project construction schedule Project cost & cash flow analysis Develop construction contract & terms
3
Project Management Plan
Project Consists of 3 parts Project Controls Project Scope Project Schedule Cash Flow Report Transportation Design Traffic analysis Pavement design Legal Aspects Contract development & terms Preparation for negotiations
4
Project Size and Cost Road Design & Construction Structure
Traffic analysis Xx Mile municipal road Estimated cost - $ ________ Structure 3 Storys 62,523 sqft total Estimated cost - $479,000 Total Estimated Project Cost - $479,000 Provide a brief description of the key project features: size, key features, cost
5
Project Schedule Diagram of project schedule here… explain the schedule to the client in your oral presentation
6
Project S-curve diagram here… explain in your oral presentation
7
Transportation Design
Key Elements of the Design Traffic Analysis Pavement Design & Cost Estimating Parking Lot Design
8
Traffic Analysis Observed Traffic Counts
Space Coast TPO Transportation Data Management System FDOT Trip Calculation Software Pre/Post LOS Analysis for Babcock St. and University Blvd.
9
Pavement Design AASHTO Guide For Design of Pavement Structures
Use of RAP (Recycled Asphalt Pavement) 2007 RS Means Precision Rock and Dredge – Palm Bay (Lime Stone) VA Paving – Cocoa (HMA)
10
Pavement Design Diagram of pavement components… explain in your oral presentation
11
Parking Lot Design City of Palm Bay Codes ADA Guidelines
Lights by Outside Source Using ECO Lighting Solutions
12
Parking Lot Design
13
Legal Aspects Contract Development Preparations for Negotiations
14
Contract Development-1
Contract Development for Lake Washington Road Description of lands/site Contractors Responsibilities Labor Schedule Permits Owners Responsibilities Communication Payments Insurance
15
Contract Development-2
Bonds and Insurance/Surety Change Orders Claims Tests and Inspections Dispute Resolution Good Faith Negotiations Mediation Arbitration Litigation Liquidated Damages
16
Negotiations Preparation for Negotiations
Gather outside information on possible alternatives and prices to compare to. Establish points of leverage that can be used during negotiation. Set a goal or target maximum/minimum value that you are willing to buy/sell at. Decide initial approach method (friendly negotiation/good cop-bad cop/etc…) Through negotiations try to determine the oppositions stand point (do they NEED an agreement? do they have other options? Etc…) Most importantly, always shoot for a Win/Win conclusion. If both parties can improve their situation and keep a friendly position with each other it will make it easier to negotiate again in the future.
17
Project summary Schedule Timing Cash Flow Traffic Summary
Pavement Features Contract Development Negotiation Tactics
18
Thank you for choosing Shaw group
Project plan meets client’s goals We will produce a quality project We appreciate your business I will be your project manager My contact information is: Michael Matern