Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss.

Similar presentations


Presentation on theme: "Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss."— Presentation transcript:

1 Beam Test Plans at the KEK Fuji Beam line (as of Nov-7 2007) S. Uozumi In this slide I will give my idea for somewhat detailed beam test plan. Let’s discuss and finalize it !

2 Good and not-so-bad news We can borrow the ATLAS SCT (Thanks to Hara-sensei) ! One undergrad student working on SCT in Tsukuba will finish his grad thesis with SCT data which will be taken in our BT. The SCT can be operated only through Windows PC. Therefore we have to take all the data with Windows PC this time (the PC can be borrowed from Tsukuba). We can also borrow X-Z movable stage from ATLAS (thanks to Kohriki-san and Ikegami-san), but it may be difficult to link the stage movement with our DAQ system. Need to perform hand-input scan ?

3 People D. H. Kim (KNU) ? ~ ? J. S. Suh (KNU) ? ~ ? D. Kong (KNU) ? ~ ? K. Kawagoe (Kobe) Nov 17~19, 23~25 D. Jeans (kobe) Nov12~end T. Kaneko (Kobe) Nov15~end H. Ikeda (Kobe) Nov15~end K. Ueyama (Kobe) Nov15~end T. Takeshita (shinshu) Nov17~20 + alpha S. Uozumi (shinshu) start~end M. Nishiyama (Shinshu) Nov 14~end Y. Sudo (Tsukuba) start~end T. Ikuno (Tsukuba) start~end H. Yamazaki (Tsukuba) Nov 16 ? ~ end Y. Takahashi (Tsukuba) start~end (can not enter to restricted area) “start” means start of preparation, Nov-12 on Monday. “end” means the date where everything is done (includes possible delays). Let me know if there are modifications needed on the participating period.

4 Overall schedule ~Nov-12 th : Gather equipments at KEK Nov 12 th ~24 th : Start preparation of DAQ, SCT and SciFi system at Fuji B4 by people who can participate. Nov 16 th : Almost participants are at KEK, take radiation training and have a kick-off meeting. Nov 17 th,18 th (weekend) : Prepare everything as much as possible Nov 19 th ~20 th : Beamtime starts, setup on beamline Nov 20 th ~ 24 th : As soon as the setup finished, start comissioning run followed by strip scan and run as long as possible Nov 25 th : end of the beamtime (could be extended), withdraw from beamline

5 Beam line setup e-e- Veto counter Movable stage SciFi tracker Strip scintillators Scinti Counter (3x3cm) Each SCT has 2 layers with a small stereo angle. Atlas SCT (6x12cm) Trigger counters (4x11cm?) temp. sensor

6 Scintillator-strip assembly spacer As done at the DESY BT, strips will be mounted in acrylic frame, and the scintillator layers will be installed in the detector frame and light shielded. To all the MPPC, uniform bias voltage will be applied by source meter. Signal from MPPCs will be read by CAMAC ADC after signal amplification by ATLAS ASD. Frame

7 Operation / Readout electronics Scintillator strips … MPPCs are biased by source meter, signal will be amplified by ATLAS ASD and read with CAMAC ADC. Trigger / veto counters … read with CAMAC ADC. SciFi tracker … (amp+) discri + CAMAC coincidence register. SCT … need dedicated VME modules and software. Movable stage … need dedicated system. Temperature sensor … can be read by Windows PC ?

8 Strips to be tested - Let’s start with newer stuff, since beam time and rate are limited - 1.Extruded 3 mm thick direct readout without TiO 2 2.Extruded 3 mm thick fiber EMBEDDED readout with TiO 2 3.Extruded 3 mm thick fiber EMBEDDED readout without TiO 2 4. Extruded 3 mm thick fiber readout with TiO 2 5. Extruded 3 mm thick direct readout with TiO 2 6. Extruded 3 mm thick fiber readout without TiO 2 7.Kuraray strip 3 mm thick fiber readout 8.Kuraray strip 3 mm thick direct readout 9.Kuraray strip 2 mm thick direct readout Old ones Newly produced Kuraray as Reference Will start with (1~3)+7 with ~3 different strips, and if time permits test 9, 8 and 4, and if time permits we will test 9, 8 and 4~5. Use the same MPPCs if possible, for direct comparison. Detailed plan will be finalized at kick-off and on-shift meeting.

9 Run Plan and DAQ Time Estimation Assume ~1000 events / mm 2 (is it enough?) 10 x 45 x 1000 = 450000 events per a strip 450k events / 10 (30) Hz = 750 (250) min per a strip Random trigger run ~ 5 min, taken once per an hour 12~13 (4~5) hours to scan one strip. Perform multiple (2~3) layers scan. Configuration change ~ 2 hours (?) Need to take data with MIP position scan and Random trigger (pedestal and MPPC gain by dark noise) With each type of scintillator. Red numbers … estimation with the SCT

10 Data Monitoring & Analysis We will perform “on-the-fly” analysis during data taking. Need always to watch gain (by pedestal run), light yield, and position dependence for all the strips on beamline. Better to plot the temperature, too. The analysis will run on Linux PC.

11 Startup jobs DAQ system and Electronics (1 staff+1 student) –Operation of CAMAC, SCT, temperature monitoring system and movable stage. –Manage trigger logic and electronics. Beamline devices (1+3) –Maintain trigger, veto, SciFi, SCT hardware –Installation (need to make support frames), cabling, alignment, HV, setting threshold and timing. Detector + movable stage (1+1~2) –Assemble scintillator-strip module, alignment, connection, cabling. –Check signal by beta-ray source –Detector and movable stage installation on beamline –Install temprature monitoring sensors at the same time. Analysis codes (0~1 + 0~1) –Discuss data format with DAQ team –Prepare root macro for “on-the-fly” analysis

12 Shift plan 3 shifts per a day (0~8, 8~16, 16~24), 2~3 persons (at least 1 staff + students) in one shift. Official language is English during the beam test ! To share all the information, DO NOT use Japanese as possible as you can ! Contact me anytime (Satoru : 080-3500-8846) if you have any trouble during your shift.

13 Stuffs to borrow from KEK Movable stage and PC for control (from KEK ATLAS group) CAMAC and NIM crates, modules –Conicidence registers –Discriminators –Gate generators –Delay modules –NIM amps –Linear fan-out –Visual scaler –Clock generator Electric parts Beta-ray source And more …

14 Stuffs to borrow from Kobe Keithley source meter Temperature monitoring system ATLAS ASD system x 1 SciFi tracker (and signal cables if possible) CAMAC ADC (HOSHIN C009) x 1

15 Stuffs to borrow from Shinshu ATLAS ASD system x 1 Detector frames, flat cable, layer structure Kuraray strip scintillators (2mm, 3mm thick) Reflector film, white PET film Flat cable-ASD interface (hand-made) Many small stuffs (connectors, cables, tools, multimeters, black sheets, ground cables, tapes, clamps, テプラ …) CAMAC ADC HOSHIN C009 x 2 NIM-TTL converter Trigger / Veto counters Analysis PC (ilccal01)

16 Stuffs to borrow from Tsukuba ATLAS SCT system DAQ PC (Windows) … does it have enough disk space? CAMAC Crate Controller CAMAC ADC HOSHIN C009 x 2 Trigger support frames Oscilloscope Soldering tools (available at KEK?) Many small stuffs Hamamatsu PMT amp (C5594) and power supply And more …

17 Shipping of the equipments (from Shinshu and Kobe to KEK) Please ship equipments to Miyamoto-san at KEK with sign of “GLDCAL beamtest equipments”. Make sure that stuffs will arrive on time (by Nov-12~13). 〒 305-0801 茨城県つくば市大穂 1-1 高エネルギー加速器研究機構 素粒子原子核研究所 宮本 彰也 教授

18 Radiation training / accommodation Make registration as KEK rad-worker ASAP via the KEK web site! ( http://www.kek.jp/uskek/ )http://www.kek.jp/uskek/ In addition to the rad training at KEK, beamline lecture will be needed. I will ask KEK person to give a lecture on Oct-16 (Fri). For accommodation, you have to make the KEK dorm reservation by yourselves! Unfortunately dormitory is already full for some dates (Nov-13,14,19,20..), but you can join to waiting list. After the reservation, let me know which date you couldn’t take the room, then I will try to find another accomodation for those days. Let me know if you have any questions.

19 Is there anything missing?

20 Backup info.

21 The KEK new test beam line North Gate Fuji experiment hall Bus-stop to arrive from Tsukuba station Bus-stop to depart to station Mt. Tsukuba See http://www.kek.jp/intra-e/access for travel info to KEK. (buses are available from Narita Airport to Tsukuba station, and station to KEK.)

22 KEK new test beam line (http://fujibeam.kek.jp but in Japanese.)http://fujibeam.kek.jp Experimental Stage (7 x 4 m) Electron beam line in Fuji experiment hall, 3 rd floor in basement. Make use of bremss photons from KEKB ring p = 0.5 – 3.4 GeV/c,  p /p = 0.4 % Rate ~ 100 Hz @ 3 GeV Beam spot size = +- 1cm KEKB tunnel

23 Beam area catwalk Stair Fuji exp-hall 3 rd floor in basement EV Counting room

24 Equipments CAMAC crate & module (ADC, coinc. reg.) NIM crate & module VME crate & module DAQ PC with CAMAC & VME interfaces Bias voltage source Movable stage and controller SciFi tracker, cables Trigger counter ATLAS SCT ATLAS ASD and Cables Temperature monitoring system Drivers, testers, cutters, black-sheets, tapes, etc…

25 Beam test setup (if the SCT doesn’t work) e-e- Trigger Counters Veto counter Movable stage SciFi tracker Strip scintillators Analog signal from trigger and veto counters will be useful to reject shower events. X-Y tracking by SciFi detector (by 1mm  scintillating fibers). Since there is only 1 X-Y tracker available, the tracker should be as close as possible to the strip scintillators. Strips will be mounted in the frame used at the DESY BT. Target strips will be placed on 1 st layer, latter layers may be used for offline MIP selection. Trigger Counter

26 Memo (just not to forget) Beamline alignment Log book ? Noise rejection Need to find a place and tools in KEK for soldering, machining, drilling and so on. Daily-meeting schedule ? And where ? Light shielding frame Connecting DAQ & analysis PC to KEK network