Download presentation
Presentation is loading. Please wait.
Published byLinette Chapman Modified over 9 years ago
1
SITECH (WA) PTY LTD Construction Services Connected Community 2-Way data
2
Full Suite of Solutions for the Heavy and Highway Contractor Grade Control Systems Site Positioning Systems Supervisor Systems Office Software Asset Management Solutions
3
SITECH (WA) PTY LTD Trimble Construction Services Equipment and Mobile Asset Management
4
Construction Asset Management How well are my assets utilized? What is their productivity? Where are they? How can I manage my assets better?
5
How it works GPS Hardware installed in machine or truck. Position and event data is sent to central server using cell network (GPRS). Data held on server is accessed via Trimble Construction Manager from any internet connected PC.
6
Benefit Summary Centralize management Improve asset productivity Improve site safety Reduce maintenance and fuel costs Manage asset usage Assist with theft recovery
7
SITECH (WA) PTY LTD Trimble Construction Manager
9
Product Focus Productivity Utilization and under utilization Understanding equipment costs and project costs Understanding equipment operations from your office Drilling down into project specific details eg – cycle and load counts Monitoring planned maintenance Exception reporting (alerts) in real time
10
Utilization Trimble Construction Manager provides three utilization calculations (all percentages): All three values are presented in a “Utilization” report. “Working Utilization” is used in a number of charts. Running utilization = Run time / Expected hours Working utilization = Work time / Expected hours Efficiency = Work time / Run time 1 2 3
11
Accurate “Work” and “Idle” Time Trimble Construction Manager can calculate accurate “work time” and “idle time”: 1.GPS movement – mobile assets where movement is a good indicator of productivity, such as trucks and graders. 2.Sensor switch – assets where movement is not indicative of productivity, such as excavators, cranes. 3.Combination of both.
12
Daily Activity Report
13
Work versus Idle Time
14
Utilization
15
Maintenance Report
16
Cycle Monitoring Could be fixed location “Load” or “Dump” site: Could be sensor or switch to indicate “Dump Up/Down” or “Ejector Out”:
17
Cycle Count / Load Reports
18
Real-time Alerts Management by exception. –Notification of specific asset activity –Variety of alert types: Idle Sensor switches (e.g. low fuel light). Ignition on/off. Started/Stopped moving. Site activity. Asset nearing maintenance. –Configurable time periods Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM. At address: Sandhill Close, Millbrook, BEDS Triggered by ‘Leave Site' event in 'Depot' site.
19
2-Way Messaging and Operator ID Real-time “2-way messaging” service –Use the terminal in machines and trucks to communicate directly with operators within TCM Operator ID –Monitors who is using what equipment and when
20
Asset History
21
SITECH (WA) PTY LTD Enabling Hardware Hardware to meet your requirements
22
Trimble MTS400 Machine Telematics System Ruggedized asset management device –Built Trimble tough to survive harsh installation environments Incorporates GPS location with wireless cellular-based telematics and optional two- way messaging Rugged design makes it ideal for installation in a more permanent, discrete location outside of the heavy equipment machine cab
23
Trimble CrossCheck Global Powerful asset management device Incorporates GPS location with wireless cellular-based telematics and optional two- way messaging The low profile, compact design makes it simple to install on a construction asset
24
Trimble TrimTrac Pro Locator Cost-effective asset management device Incorporates GPS location with wireless cellular-based telematics The low cost design and simple, non-technical installation makes it ideal for the installation on a broad range of light construction assets
25
SITECH (WA) PTY LTD Trimble Connected Site Connecting your Community
26
A Contractor Once Said … “I want everyone who ventures onto any one of our jobsites at any stage of the process to be able to provide information to the rest of the organization so that we can all learn from their experience and understand what is going on” “Through that process my organization will grow and develop new and advanced processes to better tackle issues before or as they arise”
27
The Trimble Connected Site Workflows to meet the needs of the different customer groups within the contractor’s organization Connecting the components within the workflow, streamlining data flows and providing data management and reporting capabilities Integrating the workflows to provide management information –Asset and fleet utilization –Progress and volumetric analysis –Grade checks and performance to specification
28
Site Positioning Synch
29
Grade and Compaction Control
30
Fleet Management Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM. At address: 10 Main St, Denver, CO, 80305 Triggered by ‘Enter Site' event in 'Depot' site. Asset 'Dump Truck #2' triggered TCM alert 'Dump Truck leaves Depot' on Tuesday, May 02, 2006 7:44:49 AM. At address: 10 Main St, Denver, CO, 80305 Triggered by ‘Enter Site' event in 'Depot' site.
31
The Connected Site
32
SITECH (WA) PTY LTD The Connected Community An Example Community Site
33
Trimble Connected Community All of your site information in one place www.MyConnectedSite.com brings your entire project together www.MyConnectedSite.com Secure webserver with different levels of access and permissions Track and exchange real-time data View historical project information for accurate evaluation Keep all players informed with the latest information –Field crews, site supervisors, engineers, site managers, head office, subcontractors, suppliers, owner of the project etc… The complete view of the project to share with the team – from a single source
34
Trimble Connected Community
35
Example Project Home Page
36
Example Site Equipment Page
37
Example Site / Project Calendar
38
Example Supervisors Journal
39
Example RFI Inbox
40
Example Site Web Cameras
41
Example File Repository
42
Example 3D Site Viewer
43
In Summary A Single Connected Workflow –Infrastructure GPS e.g. VRS and Rebroadcast Radio on Site –SPS Workflow for Intelligent data tracking, QA, QC, Reporting –GCS Workflow for Grade Control, 2 way data and productivity analysis –CCS Workflow for Compaction Control and analysis –TCM Workflow for Fleet and Asset Management The Connected Site –Combining and integrating the workflows –Providing additional value –Centralizing information, providing feedback and management data The Connected Community –Connecting the sites –Connecting the offices (HQ, Region, Site …) –Connecting the personnel (Managers, Surveyors, Supervisors …) –Connecting Partners (Suppliers, Sub Contractors, Engineers, Owners)
44
SITECH (WA) PTY LTD Two-Way Data Daniel Brosh Trimble Navigation LTD.PTY.
45
Two-Way Data Topics What is two-way data? Why two-way data? Project management Data management As-built information Support Training Questions & Answers
46
What is Two-Way Data? A technology that enables the bi-directional transfer of data between an office and machines over a series of data links –Data files –Machine specific files –Machine diagnostic –Screen snaps/text message
47
What is Two-Way Data? GPS Base Station IP Machine Radio Access Point/ IP Base Radio IP Repeater Radio Wired Backbone Office Network SiteVision Office Computer CMR Data
48
Why Two-Way Data? 1.Does your site have frequent design changes? 2.Do you need to get design changes to the machine immediately? 3.Does it take you too long to update files on a machine (including drive time)? 4.Have you ever wondered if a machine has a specific design on their card? 5.Have you ever struggled with troubleshooting machine control problems over the phone? 6.Do you need to know if your machines are up and running? 7.Have you ever wanted to ask a question to a machine operator who does not have a cell phone? 8.Have you ever needed a DTM to verify project progress? 9.Do you want to be more productive with your time?
49
SITECH (WA) PTY LTD Project Management
50
Verify Machine Locations On Site Putting grade in the office Two-way data allows the supervisor to view the same information as the operator, including –machine location –Real-time status on site This facilitates real-time decisions and allows them to know at all times that their machine is being productive
51
Send a Text Message to Machines Two-way data allows safe and fast text-based communication between the office and the machine –Ideal for YES / NO questions Eliminates time delays from phone calls Allows direction of machines from within the office
52
SITECH (WA) PTY LTD Data Management
53
Verify Data on a Machine CConfirm design files on a machine’s data card at any time UUpload new or revised design to all machines in one export EEliminate cost –M–Machine downtime –D–Drive time to the field –M–Manpower
54
Verify Design in the Machine Troubleshoot designs in the office Take a screen snap to see problem area and locate on design Locate problems faster
55
As-built Data Maintain daily progress –Turn on terrain map recording –Download recorded terrain (*.st) file from card –Import into SiteVision Office –Export to Excel CSV or Terramodel file –Perform volume calculations –Calculate area
56
SITECH (WA) PTY LTD Support and Training
57
Confirm What Is on the Operator’s Screen Request a screen snap of the Trimble display
58
Remote Diagnostics View a screen snap of the operator’s display and the diagnostics –Version numbers –Serial numbers –Enabled options –Machine details –GPS status –Current offsets –Loaded design
59
Remote Diagnostics Retrieve radio diagnostic information –IP statistics –CMR reception –Error logs –Temperature logs
60
Update Machine Firmware updates can be uploaded to machine –Upload firmware to machine –Send a text message to operator to restart display –Display is flashed, machine comes back on-line Restore machine settings –Machine settings lost –Copy MCH file to card –Send a text message to operator to restore machine settings Retrieve program log.txt file for Trimble support
61
SITECH (WA) PTY LTD Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.