1
By- Nawal Kishor Dwivedi M.Tech Structural Engineering, MNIT Jaipur
2
6 RD TALLEST BUILDING IN THE WORLD, MARCH 2014 TALLEST BUILDING IN WORLD FROM 1998 TO 2004 PRECEEDED BY INTERNATIONAL COMMERCE CENTER, HONG KONG,CHINA SURPASSED BY NANJING GREENLAND FINANCIAL COMPLEX,CHINA LOCATION : KLLC, JALAN AMPANG, KUALA LUMPUR, MALAYSIA
3
TYPE : COMMERCIAL, TOURIST ATTRACTION CONSTRUCTON STARTED ON 1 ST MARCH 1993 AND COMPLETED ON 1 ST MARCH 1996 COST : US$ 1.6 BILLION OWNER : KLLC HOLDINGS NUMBER OF STOREY: 88 (+ 4 BASEMENT FLOORS) TOTAL HEIGHT : 451.9 m (Architectural ) 378.6 m ( Roof ) LIFTS/ELEVATORS : 78
4
FLOOR AREA : 395000 m sq MATERIAL : CONCRETE, STEEL ARCHITECT : CESAR PELLI STRUCTURAL ENGINEER : THORNTON THORMASETI CONTRACTORS : TOWER 1 : HAZAMA CORPORATION TOWER 2 : SAMSUNG ENGG.& CO.
5
EACH TOWER : 88 STOREYS TOWER 1 :PETRONAS HEAD QUARTERS TOWER 2 :LOCAL AND INTERNATIONAL PRIVATE TENANTS, KLCC HOLDINGS SMALLER CIRCULAR BUSTLE OR ANEXX ADDED TO EACH TOWER RISING 44 STOREY TOWERS CONNECTED BY SKY BRIDGE AT 41 ST & 42 ND STOREY
6
SKY BRIDGE: CENTRE-LINE SPAN: 58.44 METRES; WIDTH, 5.29 METRES HEIGHT, 9.45 METRES FINISHED CEILING HEIGHT: 2.65 METRES HEIGHT OF PINNACLES: 73.5 - 75 METRES FLOOR AREA VARRIES AS TOWER ACCENDS CENTRAL CORE GROSS AREA :510 m sq approx FACILITIES : 3 LEVEL CONCERT HALL 6 STOREY RETAIL AND ENTERTAINMENT PARK PETROLEUM RESEARCH CENTRE 4 STOREY BASEMENT PARKING etc.
7
EARLY EXCAVATION PROBLEM : LIMESTONE BEDROCK 300000 METRIC TON WEIGHT OF EACH TOWER TO BE SPREAD ON MAT FOUNDATION PRESSURE EXERTED BY EACH TOWER : 1140 K-Pa (more than twice bearing cap. of soil available) ALSO BED ROCK WAS SLOPING – MAY LEAD TO FAILURE CONSTRUCTION SITE SHIFTED 60 m AWAY FINALLY RESTED ON CONCRETE MAT ANCHORED WITH CONCRETE FRICTION PILES 4.5 M THICK RAFT SUPPORTED ON 45-105 M RECTANGULAR PILES
8
LONGER PILES WHERE DEEP BED ROCK- TO AVOID DIFFERENTIAL SETTLEMENT M45 CONCRETE USED FOR PILES 13200 cu m OF M60 CONCRETE USED IN RAFT CHILLED WATER USED- MINIMIZE DIFFRENTIAL TEMPERAURE
10
CENTRAL CORE IN EACH TOWER ACCOMMODATE – LIFTS, EXIT STAIRS, MECHANICAL SERVICES TWO SOLID WALLS RUNNING N-S AND E-W- WEB CANTILEVER BEAMS PROJECTING-MAKES IT STIFF TAKES MORE THAN HALF THE TWISTING MOMENT HIGHLY REINFORCED THICK CORNER WALLS- RESIST WIND CORE VARRIES FROM 22 sq m TO 19 X 22 m IN FOUR STEPS OUTER WALLS 750 TO 350 mm INNER WALLS COSTANT 350 mm- TO AVOID COMPLICATION WITH LIFT SHAFT CONCRETE GRADE DROPS FROM 80 -40 Mpa AS IT ACCENTS
11
FLOOR PLAN
12
CORE WALL LAYOUT
13
COLUMNS CAST IN REUSABLE STEEL FORMS FINELY FINISHED COLUMNS OPEN TO VIEW AT MOST OF THE FLOORS 16 TOWER COLUMN- VARRY ALONG HIGHT IN DIA. 2.4 m TO 1.4 m DIA CONCRETE VARRIED FROM M80 TO M30 IN 3 STEPS 12 BUSTLE COLUMS – 1.4m TO 1m SETBACKS AT 60, 73 AND 82 SLOPING COLUMS OVER 3 STOREY HEIGHTS ABOVE FLOOR 84 – HIGH SLOPE – STEEL COLUMN USED TO AVOID COMPLICATION
14
COLUMN SIZE AND COLUMN GRADE
15
SLOPING COLUMN
16
TAPERED RING BEAMS ALL AROUND DEPTH 1.15 m AT COLUMN TO 725 mm AT FLAT ZONE SPAN VARIATION DUE TO COLUMN CHANGES AND SET BACKS BEAM GRADE MATCHES COLUMN GRADE TO SIMPLIFY PUMPING OUTRIGGERS E-W OUTRIGGER LINK CORE AND COLUMNS AT FLOOR 38-40 3 LEVEL BEAMS LINKED BY MID SPAN POSTS – HELP RESIST WIND EFFECT
18
DOUBLE DECK BRIDGE SPANNING 58.4 m CONNECTS TWO TOWER AT SKYLOBBY ELEVATOR TRANSFER STATION ON FLOOR 41 AND 42 EASY CIRCULATION B/W UPPER TOWER FLOORS MINIMIZE LIFT USAGE REDUCES FIRE EXIT REQUIREMENT GREAT HEIGHT AND SPAN REQUIRES STEEL FOR LIGHT WEIGHT AND EASY CONST. TWO HINGED ARCH SUPPORTS THE SPAN SELF CENTRING ACTION FROM RESTRAIN AT ARCH CROWN AND SPHERICAL PIN AT SUPPORTS
21
EACH TOWER CROWNED BY- 73 m TAPERING TOP ACCOMMODATES – BUILDING MAINTENANCE MACHINE, AVIATION LIGHTING AND LIGHTING PROTECTION DUE TO STEEP SLOPING COLUMN CONCRETE CONSTRUCTION IMPARACTICAL STEEL USED THROUGHOUT LOWER PINNACLE- 8 STRUCTURAL STEEL FRAMES UPPER PINNACLE – SINGLE MAST OF TAPERING CIRCULAR CROSS SECTION
22
PINNACLE ELEVATION
24
CROSS WIND EFFECTS ON STRUCTURE AND USER COMFORT ANALYTICAL MODELLING : 3D MODELLING USING SAP90 INCLUDING PERIMETER BEAMS, COLUMNS, CENTRAL COLUMN REPRESENTING CORE & OUTRIGGER SYSTEM COLUMN GROSS CROSS SECTION PROPERTIES USED- COMPRESSIVE STRESSES DOMINANT ELASTIC MODULI ‘E’ VALUES VARIED WITH STRENGTH ACCORDING TO ACI318 ‘E’ VALUES NOT REDUCED FOR CREEP- SHORT TERM WIND LOADING BEAMS ASSUMED TO BE ‘CRACKED’- AVG. STIFFNESS I/2
25
WIND MODELLING DESIGN WIND 35 m/s ASSUMED AT 10m ELEVATION RETURN PERIOD 50 YEARS FORCING FUNCTION DETERMINED USING IT ANALYSIS FOR DYNAMIC FORCE AT 1-2% DAMPING RESULTS REVEALED 2% DAMPING REDUCES BASE SHEAR VALUES WELL BELOW LIMITS NO REQIREMENT OF TUNED DAMPERS SIMILAR DYNAMIC MODELLING DONE FOR SKY BRIDGE,PINNACLE SKY BRIDGE REQIRED TUNED MASS DAMPERS-3 EACH LEG
26
MIXED CONSTRUCTION FOR COST AND USABILITY BENEFIT USE OF HPC – REASONABLE SECTIONS, LOW COST, MORE SPACE CONCRETE CONSTRUCTION- SIMPLE EQUIPMENTS LESS SKILL, EASY CONNECTION CONCRETE – BENEFITS WIND BEHAVIOUR –INHERENT STIFFNESS AND DAMPING STEEL – FAST AND FLEXIBLE ERECTION- PEMITS LAST MINUTE CHANGE WIND EXCITATION –BENIFICIAL FOR–SIZE 55mm to.3m