Download presentation
Presentation is loading. Please wait.
Published byNoreen Walsh Modified over 9 years ago
1
FY 16 INCENTIVE GRANT PROJECT Local Review Team Training Dr. Allison Touchstone, Assistant Professor Department of Ag Education/4H Youth Development, U of Idaho Glenn Orthel, Program Manager Ag/Natural Resources, Division of Professional-Technical Education Agricultural Education
2
FY 16 Incentive Grant Project --- Local Review Team Training Introduction: Part of the 2014 Idaho Initiative for Secondary Agricultural Education Improvement Idaho Code 33-1629 Idaho Quality Program Standards (IQPS) Incentive Grants Agricultural Education Program Start-Up Grants IDAPA Rule 55.01.04 - SBPTE Proposed rule going through process to be permanent rule Approve IQPS Establish the IPQS Incentive Grants Eligibility, application and assessment process, selection of grant recipients, incentive grant awards, payments and appeals Establish Agricultural Education Program Start-Up Grants Eligibility, application process, selection of grant recipients, start-up grant awards, payments and appeals Administered by the Idaho Division of Professional-Technical Education
3
FY 16 Incentive Grant Project --- Local Review Team Training Introduction - continued IQPS Approved by the SBPTE IQPS Incentive Grant Project Completion of procedures for application process, local team review assessment, state review team assessment, selection of grant recipients, distribution of funds Agricultural Education Start-Up Grant Project Completion of procedures for application process, state review assessment, selection of grant recipients, distribution of funds
4
FY 16 Incentive Grant Project --- Local Review Team Training IQPS Incentive Grant Project: STEP 1: Incentive Grant Application – pgs: 9 - 11 General information Statement of assurances Ag/NR program information Incentive grant budget – pg: 12 IQPS assessment and documentation Final approval – signature STEP 2: Local Program Assessment Team to be determined by local program Local program assessment signed by instructor, pg: 25 administrator and advisory board chairman
5
FY 16 Incentive Grant Project --- Local Review Team Training STEP 2: (continued) IQPS –Quality indicators rated Standard 1 – 6: agricultural education program Std 1 – pg: 13 32 QI for the program assessment Rating score, list evidence, comments, summary sheet Standard 7: agricultural education instructor Std 7 – pg: 17 8 QI for the instructor assessment Rating score, list evidence, comments, summary sheet IQPS Local Program Documentation – Standard 1 – 6: agricultural education program Std 1 - pgs: 15 - 16 Standard 7: agricultural education instructor Std 7 – pgs: 21 - 23 Details documents to attach Written explanation to document Transfer scores/information from other documents Administrator checklist pgs: 26 - 27 AET Reports (in progress) IQPS Program and Instructor Review Summary – Transfer local review scores pgs: 24 - 25 Signatures
6
FY 16 Incentive Grant Project --- Local Review Team Training STEP 3: State Program Assessment Division assessment from local program review documents State Review Team State team leader – current or past Ag/NR program manager 2 – 3 subject matter experts – IVATA nominated, team leaders approved Each state team member will complete assessment and score State team members can contact local review team for clarification of information No additional information from local review team is to be requested State team members will not have local review team scores State team visits to local programs is facilitated through team leader or Ag/NR program manager Team leader will finalize state program assessment scores average and transfer to summary sheet
7
FY 16 Incentive Grant Project --- Local Review Team Training STEP 4: Final Review and Division Approval State team leaders meet to finalize scores When local team and state team scores vary more than 2 points, the team leaders will review the materials and determine a final score Local program and instructor scores added determine final score Rankings of local programs and instructors will be finalized Division administrator makes final approval of the rankings STEP 5: Grant Award Process Grants awarded based on: Grant funds available Qualified applicants Grants will be $10,000 Ties – will have remaining dollars split evenly Grants will be prorated for instructors teaching less than 1 FTE ag ed Example - 50% FTE ag ed -- $10,000 x.5 = $5,000 grant
8
FY 16 Incentive Grant Project --- Local Review Team Training STEP 5 (continued): Grants will be prorated for instructors teaching less than 1 FTE ag ed Example - 50% FTE ag ed -- $10,000 x.5 = $5,000 grant Verify the instructor is still with program and ag ed FTE remains the same before grant is awarded Grants awarded annually, must apply annually to receive grant Grants are not renewable or transferrable Award Notification Announcement of grants following approval of Division administrator Funding authorization letters sent in fall after instructor verification District must request reimbursement for funds, can submit for reimbursement has funds are spent
9
FY 16 Incentive Grant Project --- Local Review Team Training Appeals: Any grant applicant or recipient adversely affected by a decision made under provisions of these rules may appeal such adverse decision as follows. The grant applicant or recipient must appeal in writing no later than thirty (30) days following the announcement of the award, and the written statement must include the basis for the appeal. The appeal must be submitted to the administrator. The division shall acknowledge receipt of the appeal within seven (7) days. The administrator may or may not agree to review the action, or may appoint a subcommittee of three (3) persons to hear the appeal, including at least one (1) agricultural and natural resources professional.
10
FY 16 Incentive Grant Project --- Local Review Team Training Timetable: 2014AugustIQPS approved Pending Rule approved Sept/OctLocal review team trainings OctoberStart local review review/application NovemberState review team nominations State review team training December 3Local program review/application due 2015Dec/JanDivision review to find possible errors Updates of local review/application FebruaryAssign state team members Local review information to state team
11
FY 16 Incentive Grant Project --- Local Review Team Training Timetable: 2015MarchState review team work continues AprilState review team work continues MayState review team assessment due State team leaders establish ranking JuneDivision administrator approves ranking July Release rankings and grant amounts SeptVerify grant recipients are still in program Funding authorization letters sent THE TIMETABLE FOR FY17WILL BE MODIFIED TO ALLOW THE PROCESS TO BE COMPLETED THROUGHOUT THE YEAR. RECOMMENDATIONS FOR CHANGES WILL BE INCORPORATED INTO THE PROCESS AS POSSIBLE
12
FY 16 Incentive Grant Project --- Local Review Team Training General Comments: Any program completing an IQPS local review that meets all Standards and QI at the basic level or above will be considered an APPROVED program and will not have local traditional on-site reviews conducted by the Division. The Idaho Quality Program Standards, Standard Statements and Quality Indicators have been approved by the SBPTE. The Descriptors/Indicators were not sent to the SBPTE, so changes can be made through policy changes. Once the process is completed this year, we will need to have a discussion on changes to be made to the descriptors/indicators of the QI. AET through Roger Hanagriff and Russell Ewell are working to develop reports that will match the information on the IQPS. We will keep you updated when reports are available to be used for documentation for parts of the IQPS. Information for documentation of the IQPS this year can include the following two timeframes 2013-2014 school year 2014-2015 school year till December 3 when local reviews are due After this year, the documentation will come from the previous school year.
13
FY 16 Incentive Grant Project --- Local Review Team Training General Comments: The PTE website is located at www.pte.idaho.govwww.pte.idaho.gov IQPS Incentive Grant webpage is connected to the Ag/NR webpage The website will contain links to other sources of information Ag curriculum and competencies Idaho core standards Science academic standards Others as identified
14
FY 16 Incentive Grant Project --- Local Review Team Training Questions?????? Dr. Allison Touchstone, Assistant Professor Department of Ag Education/4H Youth Development, U of Idaho atouchstone@uidaho.edu Glenn Orthel, Program Manager Ag/Natural Resources, Division of Professional-Technical Education gorthel@pte.idaho.gov
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.