1 viNGN CCI Build Update Broadband Business and Technology Committee Meeting October 7, 2013

2 Agenda 1.Introductions 2.Fiber cable deployment progress 3.FAP construction progress and completion schedule 4.Connecting to CAI’s 5.Undersea cable deployment progress

3

4 STX02 DROPS: 100% CAI: 2/27 STX03 DROPS: 100% CAI: 0/13 STX04 DROPS: 0% CAI: 0/4 STX05 DROPS: 0% CAI: 0/11 STX06 DROPS: 50% CAI: 0/6 STX16 DROPS: 0% CAI: 0/7 STX15 DROPS: 76% CAI: 0/17 St. Croix (West) Backbone Fiber Installed Backbone Innerduct Placed

5 STX12 DROPS: 0% CAI: 0/1 STX09 DROPS: 57% CAI: 0/14 STX13 DROPS: 0% CAI: 0/7 STX17 DROPS: 0% CAI: 0/22 STX07 DROPS: 0% CAI: 0/4 St. Croix (East) Backbone Fiber Installed Backbone Innerduct Placed

6

7 STT01 DROPS: 44% CAI: 0/17 STT02 DROPS: 88% CAI: 0/8 STT05 DROPS: 0% CAI: 0/7 STT16 DROPS: 70% CAI: 0/30 St. Thomas (West) Backbone Fiber Installed Backbone Innerduct Placed

8 STT14 DROPS: 95% CAI: 0/43 STT12 DROPS: 84% CAI: 0/19 STT13 DROPS: 0% CAI: 0/6 STT10 DROPS: 67% CAI: 0/3 STT09 DROPS: 38% CAI: 0/8 St. Thomas (East) Backbone Fiber Installed Backbone Innerduct Placed STT11 DROPS: 88% CAI: 0/17

9

10 STJ01 DROPS: 0% CAI: 0/20 STJ02 DROPS: 0% CAI: 0/11 St. John Backbone Fiber Installed Backbone Innerduct Placed

11 Splicing the fiber cables into a complete network

12 Fusion splicing fibers and training a local tech Completed spliced fibers in tray

13 Splice tray enclosure for pole mounting

14 Fiber/Facility Access Point (FAP) STT10 (Nadir) Cisco ME 3800 Aggregation Switch (1)

15 FAP # Local NameContractor % Building completeGen/PowerHVAC Racking & DuctDC Power % Completed Drops BB Fiber Terminated Notes STX02FrederikstedBenton/JBC100 STX03Boy & Girls ClubBenton/JBC100↑ 10/09 100. STX04UVIBenton/JBC100↑ 10/1110/1410/150 STX05Villa La ReineAT100 10/1910/2310/240 STX06Woodson SchoolAT100 10/2310/24 50 STX07Dept EducationAT90 ↑ 10/2810/27 0 Working on epoxy flooring and elect trim STX09Gov’t HouseBenton/JBCn/a 7557 STX12Cotton ValleyBenton/JBC100 ↑ 10/1310/18 0 STX13DPWBenton/JBC100 0 STX15Juan Luis HospitalEleven10 11/0211/23 76 STX16Roebuck – Ind. ParkBenton/JBC100 ↑ 10/0710/12 STX17WAPA RichmondAT15 11/0711/26 STT01VitemaBalbo 44 STT02UVIBenton/JBC 65↑ 10/2911/11 88 STT03Bonne EsperanceCancelled Cancel STT05Estate DorotheaBenton/JBC 5 hold STT09Eudora KeaneBenton/JBC 100 ↑ 09/2910/30 38 STT10NadirBenton/JBC 100 ↑ 10/0411/02 67 STT11Ft. MylnerRumina 65 ↑ 11/1211/14 88 STT12Schneider HospitalBenton/JBC 100 ↑ 10/1111/05 84 STT13WICO – HavensightBenton/JBC 15 ↑ STT14Boy ScoutsApex Pending reassignment 100 STT16Nisky CenterRumina 75 ↑ 10/2411/09 70 STJ01Cruz BayCustom 100 ↑ 10/2911/17 0 STJ02Myra KeatingCustom 100 ↑ 11/0311/20 0

16

17 Super FAP STX02 (Frederiksted): Cisco ASR 9006 Core Router (1) Cisco ME 3800 Aggregation Switch (2)

18 Community Anchor Institutions Schools……………………... 82 Libraries……………………. 7 Healthcare Providers….. 19 Public Safety……………… 42 Colleges……………………. 4 Government Offices…… 124 Public Broadcast Sys…. 2 Community Centers…… 37 Total 316 viNGN is bringing a 4-fiber cable and interface to each CAI at no cost to them and which is capable of delivering at least 1 gigabit service through an ISP of their choosing!

19 Athalie McFarlane Petersen Public Library-Frederiksted

20 Aerial Attachment Building Entry Point

21 Patch Panel Cisco ME 3400 Premise Aggregation Switch

22 …and 100 megabit+ service becomes a reality in the USVI!

23 CAI Connection Schedule

24

25 Beach Manhole Installations

26 Summary and Conclusions Construction is proceeding on all aspects of the network. As CAI’s are connected and their segment of the network is lit, gigabit service may begin. Completion of the network build is expected by year end 2013.