Download presentation
Presentation is loading. Please wait.
Published byDarren Bailey Modified over 9 years ago
1
Contract Monitoring TAG Report TUG Conference Monday, October 8, 2007
2
Mission Statement: The mission of Contract Monitoring TAG is to assist the TUG in advocating for and supporting the analysis of TRNS*PORT data as it relates to construction projects from conception to finalization.
3
GOALS Long Term –Provide guidance for Trns*port applications to preserve and enhance the analytical capabilities and functionality that reside in BAMS/DSS. –Promote flexible inter-active/analytical tools that could work in conjunction with “decision support” data –Support a diversity of output formats –Continue to advocate and guide the rewrite of BAMS/DSS
4
–Long term goals (continued) Promote awareness of the full analytical capabilities of BAMS/DSS including but not limited to: –competition modeling –fraud detection –general contract monitoring –comparison of as-bid to as-built data –identification of “bid items of concern” for construction personnel –Methods of evaluating design-build contracts and lump sum items –addressing modeling techniques to improve estimate quality
5
Short-term Goals Protect and enhance the quality and usability of the Trns.port data during the development of web Trns*port database. Survey all Trns*port agencies to determine how they are utilizing the DSS models and database
6
Old Business Ballot Items –Remove items 2611 and 2624 –Endorse items 7171 and 8570 Collusion Detection Seminar –Feb 2008 Web Trns*port and DSS –Forming a TRT
7
New Business State Discussions –VT, TX, TN, SC, OR, OH, NY, NS, NM, NE, MS, MO, MN, ME, LA, KY, KS, IN, IA, GA, FL, DE, AR, AL US DOT/OIG Fraud conference TAG Coordinator / Asst. Coordinator –Turner Bond, MO –Coord. –Steve Heller, IN - Asst. Coord.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.