Download presentation
Presentation is loading. Please wait.
Published byCamilla Lamb Modified over 9 years ago
1
NWS FORM E-19/E-19A THE E-19 IS A 10 PAGE “REPORT OF RIVER GAGE STATION”. THE E-19A IS A ONE-PAGE SUMMARY SHEET. THE E-19/E-19A CONTAINS INFORMATION SIMILAR TO THE USGS STATION DESCRIPTION.
2
NWS FORM E-19 CONTAINS INFORMATION FOR EACH FORECAST POINT OR DATA POINT SUCH AS: –LOCATION (MAP, LAT/LON) –GAGING EQUIPMENT AND TELEMETRY AT SITE –BENCHMARKS –GAGE HISTORY –CREST HISTORY –STAGE-DAMAGE INFORMATION
3
NWS FORM E-19A CONTAINS –SITE INFORMATION (LAT/LON) –OBSERVER INFORMATION –GAGE INFORMATION (DCP, TELEMETRY) –HIGHEST STAGES EXPERIENCED –OTHER REMARKS (DRIVING DIRECTIONS TO THE SITE).
4
E-19/E-19A REVISION NWS DIRECTIVE 10-924 STATES THAT E-19’S MUST BE UPDATED AT LEAST EVERY 10 YEARS. NWS CENTRAL REGION REQUIRES E-19’S BE UPDATED AT LEAST EVERY 5 YEARS. E-19’S BE UPDATED AT LEAST EVERY 5 YEARS.
5
E-19/E-19A REVISION NWS DIRECTIVE 10-924 STATES THAT E-19A’S MUST BE PREPARED FOR ALL FORECAST POINTS AND DATA POINTS: –WITHIN 60 DAYS OF BEING INCORPORTATED INTO THE NWS PROGRAM –WITHIN 30 DAYS OF A SIGNIFICANT EVENT SUCH AS THE GAGE BEING DISCONTINUED.
6
E-19/E-19A REVISION SUGGESTION: ASSIGN AN E-19/E-19A TO EACH OF YOUR MANAGEMENT AND OPERATIONS STAFF FOR THEM TO REVISE. THIS HAS BEEN DONE REGULARLY AT WFO EAX SINCE 1993. ALL METS, HMT’S, INTERNS, AND EVEN THE MIC, WCM, AND SOO REVISE AN E-19/E-19A. FOR THEIR FIRST TIME, TAKE STAFF TO THE FIELD AND SHOW THEM HOW IT’S DONE.
7
E-19/E-19A REVISION FIELD VERIFICATION INSPECT THE SITE WITH: –THE EXISTING E-19/E-19A –USGS STATION DESCRIPTION –KEY TO USGS/NWS GAGES –MAP OF SITE –CAMERA –SMALL SHOVEL
8
E-19/E-19A REVISION FIELD VERIFICATION VERIFY THE: –LOCATION OF THE GAGES –TYPES OF GAGES –GAGE TELEMETRY TAKE A CHECKBAR READING AND STAGE READING. NOTE THE DATE AND TIME OF THE STAGE READING.
9
E-19/E-19A REVISION FIELD VERIFICATION LOCATE ALL BENCHMARKS IN THE E-19 AND USGS STATION DESCRIPTION. EVALUATE THE STAGE-DAMAGE DESCRIPTIONS. DO THEY SEEM REASONABLE? HAVE PHYSICAL STRUCTURES (ROADS, LEVEES, BUILDINGS) BEEN REPLACED OR REMOVED.
10
E-19/E-19A REVISION FIELD VERIFICATION DETERMINE THE STAGE AT WHICH WATER REACHES THE BOTTOM OF THE BRIDGE STUCTURE, AND OVERTOPS THE BRIDGE DECK OR GUARDRAILS. INCLUDE THIS INFORMATION IN THE E-19. YOU CAN USE THE WIRE-WEIGHT GAGE TO ESTIMATE THE ABOVE STAGES.
11
E-19/E-19A REVISION FIELD VERIFICATION TAKE PICTURES LOOKING UPSTREAM AND DOWNSTREAM FROM THE BRIDGE. TAKE PICTURES OF ALL GAGE STRUCTURES AND EQUIPMENT. NOTE DATE AND TIME OF PICTURES.
12
E-19/E-19A REVISION FIELD VERIFICATION LAST THING. MAKE SURE ALL GAGE HOUSES AND WIRE-WEIGHT GAGES ARE SECURELY LOCKED WHEN YOU ARE DONE.
13
E-19/E-19A REVISION OFFICE REVISION UPDATE THE COOP OBSERVER INFORMATION FROM THE B-44. COMPARE THE E-19 GAGE DESCRIPTION, ZERO DATUM, DRAINAGE AREA, CHECKBAR READING, LAT/LON, LENGTH OF RECORD, AND RECORD CRESTS TO THE USGS STATION DESCRIPTION AND WATER RESOURCE DATA BOOKS.
14
E-19/E-19A REVISION OFFICE REVISION REVISE THE MAP SHOWING THE GAGE LOCATION. ADD BENCHMARK DESCRIPTIONS FROM THE USGS STATION DESCRIPTION.
15
E-19/E-19A REVISION OFFICE REVISION ADD HISTORIC PEAK STAGES AND DATES OF OCCURRENCE AS DETERMINED FROM USGS WATER RESOURCE DATA BOOKS AND NWS E-3 REPORTS. REVISE THE STAGE-DAMAGE DESCRIPTIONS.
16
E-19/E-19A REVISION OFFICE REVISION ANNOTATE THE PICTURES WITH: – THE NAME OF THE SITE – DATE PICTURE WAS TAKEN –WHAT THE PICTURE SHOWS (E.G. LOOKING UPSTREAM FROM THE HIGHWAY 169 BRIDGE) –STAGE AT THE TIME THE PICTURE WAS TAKEN.
17
E-19/E-19A REVISION THE SERVICE HYDROLOGIST OR HYDRO FOCAL POINT WILL TYPE IT INTO HYDROBASE. COPIES OF THE REVISED E-19/E-19A SHOULD BE PROVIDED TO NWS HEADQUARTERS, REGION, AND APPLICABLE RFC. IN CR, INCLUDE A SHEET DESCRIBING E-19 CHANGES WITH THE RFC COPY OF THE E-19.
18
E-19/E-19A REVISION ADDRESS FOR NWS HEADQUARTERS: Hydrologic Information Center, W/OS31 SSMC 2 - Rm. 13468 1325 East-West Highway Hydrologic Information Center, W/OS31 SSMC 2 - Rm. 13468 1325 East-West Highway Silver Spring, MD 20910-3283 Silver Spring, MD 20910-3283
19
E-19/E-19A REVISION EXERCISE
20
DCP, MANOMETER, STEVENS RECORDER
21
PRESSURE SENSOR, DCP, AND LARC
22
E-19/E-19A REVISION REVIEW
23
BENCHMARKS HAVE CHANGED. PREVIOUS BM’S WERE DESTROYED WHEN THE BRIDGE WAS REPLACED IN 2004. WIRE-WEIGHT GAGE NO LONGER EXISTS.
24
E-19/E-19A REVISION REVIEW AUTOMATED GAGE EQUIPMENT HAS CHANGED. MANOMETER AND STEVENS RECORDER ARE GONE. PRESSURE SENSOR REPLACED THE MANOMETER.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.