1
12015-09-04 Distributed Software evelopment Adrien Olivier(AO) Dominik Rojković(DR) Hassan Aziz Khan(HSK) Petar Butković(PB) Petar Dučić(PD) Rashid Khan(RK) Seyed Morteza Hosseini(SMH)
2
22015-09-04 Alpha Prototype
3
Content Project Schedule Current State Important Events Process Info Experience Prototype Demo 32015-09-04
4
Current State General Project Status Fulfillment of Next Milestone on track 42015-09-04 Timeliness
5
Current Project Cost Current Planned Cost$9.180 Current Actual Cost$9.015 Planned Project Cost$26.040 Forecasted Project Cost$25.875 52015-09-04
6
Results Last Week 62015-09-04 Analyzing database-adapt to the hibernate mapping Change to JDBC instead of Hibernate Implementing methods to access to the database Establishing SSH tunnel on MAC Refining the requirements Re-shaping the design Creating the UML diagrams Studying Java Server Faces and AJAX Creating web pages for authentication and main page, Creating client side of web application
7
72015-09-04 Creating security for JavaBeans classes Integration of connection graph with web application Working on server side of web application Making the initial web pages in HTML and CSS Studying JSON Finalizing work on initial version of connection Graph Configuring and running Tomcat Troubleshooting of access to the PostgreSQL
8
Activities Planned for Next Period –Continuing implement database interface needs –Refine the Requirements –Enhance the design –Modify the Requirements specification document –Improving domain layer –Work on the matrix –Studying how to make zoomed-out graph –Update coding policy –Insert more data in DB tables 82015-09-04
9
Working Hours 92015-09-04 Member W39 W40W41 W42 W43 Total Adrien 92 18 29 Dominik 91814 16 37 94 Hassan 92024 11 14 78 Morteza 9 6 20:30 35:30 Petar B 9920 6 39 83 Petar D. 91113 4 23 60 Rashid K. 91518:45 15:30 13 71:15 Total 637589:45 58:30 164 450:45
10
Project Cost Week 40Week 41Week 42Week 43 Current Planned Cost $2.400$4.380$6.720$9.180 Current Actual Cost $2.760$4.555$5.365$9.015 Planned Project Cost $26.040 $26.04 Forecasted Project Cost $26.400$26.215$24.685$25.875 102015-09-04
11
Important Events Meeting with customer –Arrange communication’s channels. –Familiarizing with project details. –Geting details about connection diagram, activity matrix, database tables and list of main options. –Geting data for DB, details for preparing tables and tips for optimizing tables for searching. General meetings Local meetings Leaders meetings 112015-09-04
12
Used policies General policies Collaboration policy Naming policy Week report policy Coding policy 122015-09-04
13
Changes in design decisions Abandon the use of PHP. Decided to develop only in Java server side language. Using JDBC instead of Hibernate 132015-09-04
14
Development Process’ Definitions Keyword Definitions Visualize Transactions Graphically represent the calls or data transfer between different users. Search Depth No of hops from a certain user or Subscriber Activity Matrix A table representing certain transactions over a period of Time 142015-09-04
15
Requirements Description 1.Graphically(transactions between subscribers) 2.Search depth 3.Time period(user defined) 4.Types of transactions(in different colors) 5.Zoomed out graph(whole network) 6.Activity matrix(summarize transactions) 7.Clickable and zoomable main graph. 8.Selectable cells. 9.Selected cell’s transactions(highlighted in main graph) 152015-09-04
16
Specific requirements Interface 1.Main content. 2.Control panel on right side. 3.A small zoomed out graph. 4.Activity matrix at the bottom of the screen. 162015-09-04
17
172015-09-04
18
Assumptions and constraints Technological –HTML, CSS (web pages) –JSF (client authentication and DB connection) –JavaScript (Graphs) –AJAX(asynchronous communication SQL DB queries) Environmental –Apache (Tomcat), PostgreSQL (database) –Server running application are Linux based 182015-09-04
19
Time schedule 192015-09-04 Id Milestone Description Responsible ept./ Initials Finished week Metr. Rem. Plan Forecast Actual Week+/- M001Project visionDR, HAK39 0 M002Project planDR40 0 M003 Requirements Definition HAK40 0 M004Design DescriptionRK, DR41 0 M005Prototyping–Iteration1RK, PD44 M006 Milestone - Alpha prototype RK, PD44 M007 Prototyping–Iteration2 AO47 M008 Milestone - Beta prototype AO47 M009 Implementation DR, RK, AO51 M010 Milestone – Release candidate DR, RK, AO51 M011TestingMHS01 M012 Final Project Report,final version existing documents,other project-related documentation HAK03 M013Final product RK, PD, DR, AO 03
20
Experiences 202015-09-04 Help on Skype. Lot of work that isn't visible. Not enough time for everything. Hard to organize work when people do not keep the schedule. Many interesting meetings and people.
21
AO - Interfaces for DB HAK - Documentaion RK - Activitiy mat + HTML DR - Organization + Visualization MHS - Presentation + SVN PB - MVC + JSF + system maintenance PD - Interface design + servlets 212015-09-04 Work distribution
22
222015-09-04 Week 40Week 41 Multiple roles Lack of time Communication, Understanding role Technologies integration problems Architecture People’s time and appointments. Didn’t send week report. Week 42Week 43 Lack of time Can’t access to main site Incomplete database. JSON data format. Don’t respect deadlines Organization of work Lack of time Lack of knowledge Lot of coding problems Problems
23
Use Case Diagram 232015-09-04
24
Software architecture Client Server Architecture 242015-09-04
25
System architecture in general 252015-09-04 General System Architecture
26
Detailed software design Class Diagram 262015-09-04
27
General Sequence Diagram 272015-09-04
28
Database Tables RTX –The RTX table contains call detail records RTX_TYPES –The table defines different types of transactions found in table RTX (column RTX_TYPE) RTX_USAGE_TYPES –The table defines different usage types of transactions found in table RTX (column NR). LEAP_CUSTOMERS –This table contains subscriber details) 282015-09-04
29
292015-09-04
30
302015-09-04
31
312015-09-04
32
322015-09-04