Challenges & Strategies During Healthcare Construction - Environmental Risk Assessments
2
Hillmann Consulting Full service Environmental Health & Safety and Construction Engineering firm Nearly 30 years of experience working in healthcare facilities Headquartered in Union, NJ Over 60 Professionals Based in New Jersey 109 Professionals Nationwide
3
The Hillmann Team Our expert staff is trained, certified and degreed in their respective fields: Certified Industrial Hygienists Certified Safety Professionals Certified Hazardous Materials Managers Licensed Site Remediation Professionals Professional Engineers Registered Environmental Property Assessors LEED Accredited Professionals Experts in Asbestos, Lead, and Underground Storage Tank Management
4
Presentation Overview
Unique Challenges of the Healthcare Environment Construction Project Strategy Environmental Risk Assessment Hazardous Materials Assessments Abatement Management Chemical & Environmental Compliance Management Indoor Air & Water Quality Evaluation & Monitoring Mold Awareness Asbestos Awareness Lead Awareness
5
UNIQUE CHALLENGES OF THE HEALTHCARE ENVIRONMENT
6
Challenges of the Healthcare Environment
Preserving a Contained Environment During Construction Maintain a Hard Barrier & HVAC Balancing Track Pads Isolate Paths of Entry and Egress Protecting the Health of Susceptible Patient Populations from Dust and Fugitive Emissions Immune suppressed individuals Individuals with respiratory diseases Asthmatic or allergic individuals
7
Challenges of the Healthcare Environment
Maintain Operations and Occupancy Lead-Lined Walls in Radiation Areas Additional Contaminants to Control Bacteria Radiation ISO Standard – Cleanrooms and Associated Controlled Environments Provides stringent classification levels and specifications of air cleanliness specific to cleanroom environments
8
CONSTRUCTION PROJECT STRATEGY
9
Construction Project Strategy
Complete Environmental Risk Assessment Identify Materials and Potential Contaminants Develop Mitigation Plan Reduce Risk and Liability Project Planning Ensure resulting environmental assessment issues are included in the work breakdown structure Allow adequate time in the project schedule to properly plan for environmental issues
10
Construction Project Strategy
Management of Project Work in Phases Maintain Facility Operation and Occupancy HVAC and Ventilation System Management Control of Critical Pathways Facilitate Patient Relocation Monitoring
11
ENVIRONMENTAL RISK ASSESSMENTS
12
Hazardous Materials Assessments
Identify and inventory hazardous materials to mitigate risk and liability for renovation related conditions Asbestos Mold Lead PCB’s Mercury Fuel
13
Abatement Management Confirm work is performed to applicable regulations and guidelines Verify appropriately trained and licensed personnel are providing clean-up and remediation Record-Keeping, Record-Keeping, Record-Keeping Maintain a safe environment for personnel and workers Ensure occupant/patient health and safety
14
Chemical & Environmental Compliance Management
Hazard Communication Written Program Material Safety Data Sheets Training staff – Initial, As hazards change Contractors Site Investigation Chemical Management Product Stewardship Regulatory Agency Liaison Regulatory Compliance RCRA, CERCLA, SARA, TCPA, CWA, NPDES
15
Chemical & Environmental Compliance Management
Right-to-Know Programs Spill Prevention Clean-Up & Countermeasures Required by EPA if facility can: “reasonably be expected to discharge harmful amounts of oil into navigable waters of the United States or adjoining shorelines” Spills over 25 Gallons must be reported to the EPA
16
Indoor Air Quality Evaluation & Monitoring
Proactive Evaluation Document Air Quality Maintain Healthy Indoor Environments Reduce Liability Optimize Building Operations HVAC System Inspection Air Sampling
17
Indoor Air Quality Evaluation & Monitoring
Reactive Investigation Fire Major Leak or Spill Construction Renovation Occupant Complaints Occupant Complaint Survey Personal Interviews Building History Site Visit Environmental Monitoring
18
Water Quality Testing EPA Primary and Secondary Contaminants
Scheduled Facility Survey Legionella from Potable Water and Cooling Towers ASHRAE 188P – Third Public Review (Jan 2013) Coliforms Priority Pollutant Metals Complaint Response
19
MOLD AWARENESS
20
When to Initiate an Investigation
Characteristic mold (musty) odor observed Water intrusion issue observed Occupants reporting health effects Allergy type symptoms i.e. itchy eyes, sneezing, etc Visible mold growth observed on exposed or hidden surfaces Elevated moisture content of delivered building materials
21
Assessing the Situation
Visual inspection is the primary investigation method to identify areas that require remediation. Be sure all contaminated areas are identified In wallboard material mold growth may extend up to 1 meter beyond what is visible Inaccessible areas may be your largest concern; Behind wallboard, under wallpaper, below rugs, etc. A moisture meter can be useful in assessing porous materials that may be contaminated and should be disposed
22
Assessing the Situation
In a Healthcare facility, air sampling is highly recommended to identify the presence of mold spores Non-Viable air samples are run for 10 minutes Samples are analyzed for the presence of the Penicillium/Aspergillus, among others If the Penicillium/Aspergillus group of mold is identified in the samples, it is necessary to sample via viable (culturable) methods to determine the species present (Aspergillus species known to cause lung infection known as Aspergillosis)
23
Nature of Mold Problems
How extensive & where Drywall cavity Carpet HVAC insulation near cooling coils Vinyl wall covering Crawl space Flood – DRY OUT THE SPACE!! Cat I, II, & III Water – type will govern scope
24
Water Loss Mitigation Loss Occurs
Property Management may Initiate Insurance Claim Call your consultant and loss manager Source of water intrusion fixed (unless something major) Property Management contact hires Environmental Consultant and Remediation Contractor The consultant and contractor act as a third party and should not be hired by one another The consultant and contractor should be two separate entities.
25
Water Loss Mitigation Environmental Consultant performs an initial assessment and reviews environmental conditions Remediation Contractor begins emergency response work to contain loss
26
Water Loss Mitigation Complete Environmental Remediation Scope of Work Issued The Remediation Scope of Work includes Site observations Laboratory results Site diagram Recommendations Remediation guidelines for contractor to follow Insurance Criteria Sample Contract Form Clearance Criteria
27
Loss Control Stage Remediation scope of work may be bid out
Environmental Testing, Project Management and Cost analysis Cost Analysis can be conducted Environmental Consultant Performs Inspections and Clearance Testing Visual inspection Moisture Assessment Air sampling (if visual inspection and moisture assessment pass)
28
Role of the Environmental Consultant
Provide health and liability protection Furnish technical support and environmental expertise to limit the impact on-site and in the surrounding community Ensure the efficacy of environmental issues attributed to each specific loss Liaison with emergency management teams, adjusters, remediators, contractors, officials, and the insured (if related to an insurance claim)
29
Role of the Environmental Consultant
Verify contractor’s health & safety program meets regulatory standards and applicable work practices Maintain efficient restoration schedule to pre- loss conditions Verify clean-up of effected areas is complete Provide record keeping functions in support of an insurance claim
30
ASBESTOS AWARENESS
31
Pre-Abatement Plan Sequence and Schedule
Prepare and issue abatement specifications and sketches Select qualified abatement contractor File with all applicable regulatory agencies Pre-Abatement preparation
32
Abatement Filings The Filing Process takes approximately 2-3 weeks
Environmental Protection Agency (EPA) State Department of Health and Department of Labor (DOH &DOL) State Environmental Protection Agency State Department of Community Affairs (DCA) Local Municipalities
33
Notifications Signs Demarcation of work areas
34
Air Monitoring Area Sampling High Volume Pumps
35
Protection From Exposure-PPE
Asbestos Awareness Protection From Exposure-PPE Disposable Suits Disposable Footwear Disposable Gloves © Hillmann Institute of Training
36
The Abatement Process Pre-Commencement Inspection Start of abatement
Tracking of waste 1st, 2nd & 3rd Cleaning Inspections Final Aggressive Air Clearance Sampling Break-down of containment
37
LEAD AWARENESS
38
Lead Paint Hazards Peeling or Chipping Paint Alligatoring Chalking
Paint on a Deteriorating Subsurface Impact or Friction Surfaces Blistering Paint Water Damaged Surfaces 38
39
Identifying LBP Hazards
Lead-Lined Walls in Radiation Areas Friction Points Windows, Door Header, Jambs and Thresholds Stair Treads Impact Surfaces Doors, Stair Risers, Walls behind Door Knobs 39
40
Visual Inspections All Potential Lead Hazards Must Be Identified
Findings Are Recorded on a Prepared Checklist Room by Room Inspection Inspection of All Painted Surfaces and Components Describe lead hazards again- 2 slides back show checklist again-fill out entirely for classroom mention hallways, closets, bathrooms, common areas, etc. kitchen cabinets not closing, doors unsquare, stuck windows 40
41
Exposure Monitoring Wipe Samples Air Samples Assessment Clearance
Area Samples Personal Samples Packet of sweet n low - Show Visual Aids 100 floor 500 sill 800 well areas should be well less than 30 work areas less than 50 action level is 30 often less than 2 in “clean areas” 41
42
Correcting LBP Hazards
Wet Scraping Wet Sanding No Mechanical Equipment Chemical Stripping No Methylene Chloride Permitted Additional PPE Required Additional Disposal Fees Odor Complaints Mention enclosure and encapsulation. Pull out equip. and demonstrate 42
43
Correcting LBP Hazards
Component Replacement Component Adjustment Doors, Including Cabinet Doors Windows Must Be Adjusted and Squared Daily Cleanup Work Area Must Be HEPA Vac. & Washed Daily Visual Examination Final Cleanup Clean-up must be thorough/detergent/HEPA Visual verifies no loose paint,dust or related work debris Final - Plastic removed all surfaces HEPA and wipe Summarize sequence of activities 43
44
Determining Effectiveness
Collect Clearance Wipe Samples Continued Quality Maintenance Maintenance of Documentation HECO will do PB still remains..continued maint. Records prove it was done...If it aint written...It aint been done!! 44
45
Question & Answer