Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress Report 2010 John Parker Chairman, Get Ready Central Florida.

Similar presentations


Presentation on theme: "Progress Report 2010 John Parker Chairman, Get Ready Central Florida."— Presentation transcript:

1 Progress Report 2010 John Parker Chairman, Get Ready Central Florida

2 2010 FOCUS Brainstorming Collaboration Partnerships Marketing & Education

3 1 st Quarter Achievements

4 First “Get Ready” City In Florida Mayor Signs MOU Joins Project Get Ready

5 Permanent EV Exhibit @ Education Center Electric Vehicles Charging Stations Solar – Electric Car

6 Nissan LEAF Ride & Drive Event

7 Launched Website: www.ocfl.net/getready Completed PGR Progress Report *Readiness Ranking: 3 out of 5 www.ocfl.net/getready

8 2nd Quarter Progress

9 Met With Orange County Building Officials * Mission: Streamline Permitting

10

11 Residential vs. Business Installation Standalone permit vs. Engineering Designs Check UL listing, wiring & loads - (150’ From Transformer Avoids Line Losses) Service from House / Business Panel (40 / 60 amp) Ground work Protection from damage - bollard, curb, height Back from curb 36” ADA accessible space, at least one (Business)

12 Highlights of NEC Art. 625 Must be listed & labeled for the purpose (Signage) Mounting height from 18”- 48” If installed indoors requires mechanical ventilation system Equipment installed so no one has access to live electrical parts. PUBLIC CHARGING STATIONS

13

14 Raleigh Permit Application Process for Electrical Vehicle Service Equipment (EVSE)

15 Demonstration Vehicles Evolve


Download ppt "Progress Report 2010 John Parker Chairman, Get Ready Central Florida."

Similar presentations


Ads by Google