Download presentation
Presentation is loading. Please wait.
Published byMatthew Shepherd Modified over 9 years ago
1
UPC.edu renewal Degree in Multimedia. Final project Irene Escudé Capdevila November 2012
2
Project plan ➠ Who does it concern? Dimension of the project ➠ What is the starting point? Description of the current situation ➠ What must be done? Conceptual definition of the project
3
Project plan ➠ What must be done? Conceptual definition of the project A promotional website, of the studies, research and services for businesses A unified website, the importance falls on the new, not the source. A renovated look of the homepage that suits the previous requests.
4
Project plan ➠ Who does it concern? Dimensions of the project Information systems: studies DB, intranets and UPC websites, Genweb, press room, Alumni UPC portal, UPCtv, DRAC, Chinese version, Meteocat webservice. Teams and units: SCP, OMC, UPCnet, SRI. System users: university community (students, professors and staff), companies linked with the university, prospective students, secondary education teachers.
5
Project plan ➠ What is the starting point? Description of the current situation
6
Project plan ➠ Project planning Project phases and UCD plan
7
Project plan Phase I: Definition and planning Phase II: Development. Iterative design Phase III: Implementation and migration Phase IV: Release
8
Project plan Phase I: Definition and planning Phase II: Development. Iterative design Phase III: Implementation and migration Phase IV: Release
9
Project plan Phase I: Definition and planning Phase II: Development. Iterative design Phase III: Implementation and migration Phase IV: Starting-up
10
UCD implementation ➠ Plan execution. Context requirements ➠ Plan execution. IA design ➠ Plan execution. Definition ➠ Plan execution. GUI design
11
UCD implementation. Definition ➠ Plan execution. Definition ➠ Stakeholder meeting 1 1
12
UCD implementation. Definition ➠ Plan execution. Definition ➠ Stakeholder meeting 1 1 ✔ Initial project specifications
13
UCD implementation. Context requirements ➠ Plan execution. Context requirements ➠ Brainstorming ➠ Usability test ➠ Interviews with subject matter experts 2 2 1 1
14
UCD implementation. Context requirements ➠ Plan execution. Context requirements ➠ Brainstorming ➠ Usability test ➠ Interviews with subject matter experts 2 2 1 1 ✔ Requirements report
15
UCD implementation. IA design ➠ Plan execution. IA design ➠ Competitor analysis ➠ Statistics analysis ➠ Card Sorting ➠ Navigation test 3 3 1 1 2 2
16
UCD implementation. IA design ➠ Plan execution. IA design ➠ Competitor analysis ➠ Statistics analysis ➠ Cardsorting ➠ Navigation test 3 3 1 1 2 2 ✔ Definitive Information Architecture proposal
17
UCD implementation. GUI design ➠ Plan execution. GUI design ➠ Braindrawing. Parallel design ➠ High fidelity paper prototyping. Screen testing ➠ Evaluate prototype 4 4 1 1 2 2 3 3
18
UCD implementation. GUI design ➠ Plan execution. GUI design ➠ Braindrawing. Parallel design ➠ High fidelity paper prototyping. Screen testing ➠ Evaluate prototype 4 4 1 1 2 2 3 3 ✔ Definitive Graphic User Interface proposal
19
Next step ➠ Implementation and migration phase ➠ Study of edition use cases ➠ Functional prototype ➠ Usability test (content edition) ➠ Checking and creation contents ➠ Migration 1 1 2 2 3 3 4 4
20
Conclusions 1 1 2 2 3 3 4 4 ➠ Users’ engagement in a disinterested way ➠ Solution of detected problems ➠ Two relevant changes of shape and concept
21
Thanks Irene Escudé Capdevila November 2012
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.